Project engineer
ARABIENERTECH.K.S.C
Total years of experience :16 years, 10 Months
• Supervising the execution activities.
• Give the daily instruction to site supervisors.
• Assisting the site manager in preparing and organizing the work.
• Co-ordinate between Sub-contractors, Steel yard, Patch Planet to achieve the target schedule.
• Co-ordinate between Sub-contractors site engineers and QC& Employer engineers to ensure a successful Inspection.
• Supervising the executive of drilling and grouting activities for the soil.
• Performing all tests necessary to ensure successful inspection with QC& Employer engineer.
• Reporting about daily progress of works, labors and equipment’s.
• Preparing a weekly schedule for site activities and equipment forecast.
o Removing canceled public utilities obstructing execution of works.
o Reporting about daily progress of works, labors and equipment’s.
o Planning for weekly site activities and equipment forecast.
maintaining for schools Building
• Reporting Maintenance Manager and arrangement all activity with Team or
Sub-contractors to finish and start in time to ensure a successful Inspection.
• Planning to supervisors all work every week.
• Supervising in all activity from start to end
• Supervising on safety plan and safety on site
• Arrangement material needed in site
• Arrangement between Civil-Finish- systems work
• Analysis Structure for projects (dead load - live load - static load -dynamic loads - seismic loads …….)
• Design according to different codes for steel elements and reinforced concrete
• Prepare Structure drawings for projects in office
• Prepare shop drawing for tender drawing
• Prepare Quantity bill for projects
• Prepare specifications for projects
• Modeling project by software programs
Project: Marassi (water tank with capacity 10, 000 m3 )
Owner: Emaar_Misr
Position : project Engineer
Responsibility:
• All civil works for tank from excavation till test tank , water stop, pumps room
• Reporting construction Manger and arrangement all activity to finish and start in time
• Arrangement with Qc to ensure a successful Inspection.
• Planning to supervisor and former all work every week .
• Supervisor in all activity from start to end
• Contact with technical office if any problem
• Supervising on safety plan and safety on site
• Arrangement material needed in site
• Arrangement between elect and machining steps
Project: Port Said East Container Terminal Phase 2 Marine works.
Diaphragm works:
1.Supervising the executive of all Diaphragm walls activities.
2.Give the daily instruction to site supervisors.
3.Assisting the site manager in preparing and organizing the work.
4.Co-ordinate between Sub-contractors, Steel yard, Patch Planet to achieve the target schedule.
5.Co-ordinate between Sub-contactors site engineers and QC& Employer engineers to ensure a successful Inspection.
Grouting works
1.Supervising the executive of drilling and grouting activities for the soil.
2.Performing all tests necessary to ensure successful inspection with QC& Employer engineer.
3.Reporting about daily progress of works, manpower and equipments.
4.Preparing a weekly schedule for site activities and equipment forecast.
Project: Greater Cairo Metro Line 3.
Diaphragm works:
1.Supervising the executive of all Diaphragm walls activities.
2.Give the daily instruction to site supervisors.
3.Assisting the site manager in preparing and organizing the work.
4.Co-ordinate between Sub-contractors, Steel yard, Patch Planet to achieve the target schedule.
5.Co-ordinate between Sub-contactors site engineers and QC& Employer engineers to ensure a successful Inspection.
Grouting works
1.Supervising the executive of drilling and grouting activities for the soil.
2.Performing all tests necessary to ensure successful inspection with QC& Employer engineer.
3.Reporting about daily progress of works, manpower and equipments.
4.Preparing a weekly schedule for site activities and equipment forecast.