Project Planning Engineer
Forges Tardieu
Total des années d'expérience :10 years, 0 Mois
3000 TPD Oman Sugar Refinery Project
• Fabrication & erection of API 620/650 Storage Tanks, Pressure Vessels and PEB Steel Structures (6500MT)
• Assembly & Erection of Static & Rotary equipment (850 Nos)
• Assembly & Erection of Conveyor system
• 22MW Back Pressure Steam Turbine Boiler equipment & Turbine assembly and installation
• Fabrication & Erection of Piping for both Boiler & Process House (30KM & 200000-inch dia).
roject: 2X600 MW super critical Thermal Power Plant for BHEL and TNEB
Project Scope : Fabrication & Erection of Heavy Steel Structures
Project: HPCL Rajasthan Refinery Limited -erection of coke drum derrick structures for delayed coke unit.
Project: Toyotetsu India Auto Parts PVT. LTD, Bidadi, Karnataka
•Having knowledge in Primavera Ms Project AutoCAD
•Having Sound knowledge in HVAC Systems, Odour control systems, hydraulics and centrifugal pumps rotating and static equipments and Fire Fighting Equipments.
•Responsible for planning of daily activities and supervision.
• Responsible of plant operations and maintenance.
• Responsible for creating Asset codes of equipments
• Responsible for creating Plant Layout Diagrams
• Responsible for creating Work Orders on corrective and preventive maintenance
• Prepare daily Maintenance report& Assign weekly, monthly yearly maintenance schedule
Key skills and knowledgeable areas:
•Strong team collaboration skills.
•Work closely with team members to achieve Engineering goals.
•Experience in the field of Mechanical projects, Manufacturing and Maintenance.
•Working knowledge in AutoCAD; Primavera MS Project
•Project cost estimate, bill quantities and implementation
I am pursuing M.B.A Project management via Distance education
I have studied Mechanical Engineering under ANNA University chennai,India. I have done projects in 1) frictionless braking system 2) Design & fabrication of IC Engine Connecting Rod using Aluminium & Tungsten dioxide composite 3) Wind Mill Vechicle
we have made a Vehicle named Wind Mill Vehicle which used wind energy as a fuel and worked based on it