EPC -Accommodation Complex -Phase -3, multipurpose hall, Auditorium building, clinic building, substation Chiller yard, maintenance workshop building, store building, Civil works, Substation -# 3, 4, 5, 6, &7, 540 &541&571 AREA, Inspection of Civil and structure works, compaction test for sub base and base course of paving Trench backfilling, concrete pre pour and pouring activity paving, surface preparation of manhole, valve boxes, chemical anchoring for pave foundations, erection of steel structures main pipe racks foundation, non-shrink grouting of foundation vessel foundations and surface preparation of manhole epoxy grouting and Rotator equipment foundations and electrical and instrumentation gravel paving and Civil Building Surface preparation and painting activities, insulation cable value and penthouse 8450 Early Civil works for South, North Central and West Island upper zakum project. Pre - Cast Concrete and Miscellaneous Foundations To conduct quality control inspection of the precast units before, during and after casting operation to oversee de molding & stripping of cast element ensuring that the required lifting strength is met Conducting required tests for precast elements, Issue non-conformance reports when the specification or procedural requirements are not met. Documenting all inspections and tests on pro-forms as required by the Project Quality Plan and Contract specification. Conduct snagging/punch list prior to handing-over of completed works. Witnessed inspection for Concrete - cut back at both ends of the pipes, checking for the reinforcing wire mesh & polyethylene outer wrap moisture retention membrane & checking the anti-slip application anode and cathode inspection, Witness and review report laboratory test for concrete coating ie; concrete compression test of cube/core, water absorption coupon test Monitor concrete coating pipes condition, outside diameter, thickness, concrete density, requirement and within the specified test plan, Witness and review report laboratory test. AL QAHTANI PIPE COATING INDUSTRIES, DAMMAM- KSA, Laying of New Hout Crude Transmission Line Facilities Witnessed inspection for concrete coating in the 20" dia pipes .concrete sampling holiday test in the protective coating of the pipes prior to CWC and anode and cathode checking on pipes joints Inspection of Fusion Bonded Epoxy (FBE) asphalt Enamel and concrete coating of steel pipes in accordance with project approved inspection test plan and specification, Witnessed inspection for concrete -cut back at both ends of the pipes checking for the reinforcing wire mesh & polyethylene outer wrap moisture retention membrane & checking the anti-slip application anode and cathode inspection, Witness and review report laboratory test for concrete coating ie; concrete compression test of cube/core, water absorption coupon test Monitor concrete coating pipes condition, outside diameter, thickness, concrete density requirement and within the specified test plan. Witness and review report laboratory test for Fusion bonded epoxy (FBE) and Monitoring load out of completed coating pipes from the coating plant to the port in accordance with specification requirements, Witnessed inspection for Concrete Weight Coating in the 20" dia. Pipes. Concrete sampling, Holiday test in the protective coating of the pipes prior to CWC and Anode and cathode checking on pipes joints Inspection of Fusion Bonded Epoxy (FBE), Asphalt Enamel and concrete coatings of steel pipes in accordance with Project approved Inspection Test Plan and specifications. Duration : March 2011 to October 2011 Organization : M/s. Alghanim International, Position : Civil inspector, Client : Kuwait Oil Company /AMEC Location : North to CMM (Centre Mixing Manifold) Project : Cross Country Pipeline: 30" Crude oil Transit line- KOC., Kuwait
- مجال الشركة:
- النفط والغاز
- الدور الوظيفي:
-
الهندسة المدنية