Land Surveyor Sr
Belhasa Six Construct
Total years of experience :16 years, 6 Months
Moniterd execution of contract work for compliance with design plans and
specifications.
liaised with civil technician to prepare and update maps, drawings and blueprints using
manual and computer assisted methods.
Calculated load levels and material stress factors to identify design constraints.
Analyzed survey reports, maps and other topographical and geological data to
effectively plan infrastructure and construction projects.
The Public Works Authority 'Ashghal' to be responsible for the planning, design, procurement, construction, delivery, and asset management of all infrastructure projects and public buildings in Qatar. Ashghal’s key responsibilities include governing the design, construction, and management of major projects including roads, drainage and buildings such as public buildings, schools and hospitals.
Responsibilities & Duties
• Inspection and verification of all control points in Qatar established by GIS department.
• Visiting for Site work inspection on running projects.
• Final checking of completed projects during handover and data comparing according to design and submitting final reports to Technical Support Affairs.
• Carrying topographic survey for predesign of new planed project and submitting final report to Design.
• Scanning by 3D Laser Scanner and preparation of modelling data.
Four Seasons Hotel
Manama, Bahrain
Feb 2012 to Date
Construction of High Rise Building in Manama Bahrain Height 201 Meters
Four Seasons Hotel Bahrain.
• Owner Stone Company S.P.C.
• Client. Bahrain Bay Developments B.S.C©.
• Architect & Engineer. SOM, MMM Group.
• Consulting Eng. Kowi Gulf A/S.
•Responsibilities & Duties
• Maintaining surveying control points and bench marks and establishing new control points & bench marks from control traverse.
• Prepare the all Grid Line co-ordinate.
• Checking the all setting out points and level, and prepare the RFI and submit to the QA/QC department.
• Coordinating with construction manager, Surveyor manager Site surveyor, QA-QC, Technical engineers and foreman.
• Preparing the As-Built AutoCAD drawing and check the co-ordinate and level are in tolerance or not.
• Instrument Calibrations checking
• Surveying Asset of Alain city, Gardens, Roads Parks, Electrical & Mechanical, Irrigation, Agricultural assets.
• Digitizing the Mapping data using Map info, GIS software.
• Preparation of Drawings from collected data by PDA GPS satellite images .
• Define to spices in asset type, asset group and their condition.
Al Sufouh Tramway Transit Rail System
Construction of Tramway (Rail) track by duct precast, Stations, Pipeline,
Sewerage and Electric services installation and rectification for existing.
• Client. RTA Roads and Transport Authority Dubai.
• Consulting. SYSTRA.
CCA Abu dhabi
Cleveland Clinic sowwah Island
Construction of Cleveland clinic 22 levels high tower which is constructing
by steel structure.
• Owner Mubadala Healthcare.
• Client. Al Dar Properties.
• Lead Consulting. Keo/Jacobs International Holdings.
• Consulting Eng. Aecom Int.
• Construction of World’s Highest Tower ( Height 828M Levels 165 )
• Client EMAR Properties.
• Consultant. Hyder Consultant.
• Contractor. Samsung, Belhasa six Construct, Arabtec
Construction of Sewerage treatment Plant, Pipe Line & Water Tank.
• Client. Abu Dhabi municipality.
• Consultants. Halcrow International.
Construction of Bridges on Emirates Road access for Metro Station of Rushdiya.
• Client. Roads and Transport Authority Dubai.
• Consultants. Parson International Partnership.
• Contractor Emirates Road Contractor LLC
• Sub contractor Belhasa six Construct LLC.
Construction of Bridges, Underpass, Gas Pipeline Culverts, Retaining Walls
in Yas Island Package 1 & 2.
• Client. Al Dar Properties.
• Consultant. Halcrow International.
Construction of Marine Quay wall, Marine Break Water, Jetti by Preast
Blocks.
• Client. Al Dar Properties.
• Consultant. Halcrow International.
Responsibility and Duties
• Handling complete layout off different structure from deep excavation to final structure finishing such as Pumping station etc.
• Maintaining surveying control points and bench marks and establishing new control points & bench marks from control traverse.
• Carrying out Topographic Survey from GPS and download the data from Leica Geo-office.
• Preparing the Setting out co-ordinate for all structure and handover to Site Section Surveyors.
• Controlling defend structure such as cement silo from excavation to top structural finishing.
• Coordinating with construction manager, Site surveyor, QA-QC, Technical engineers and foreman.
• Preparing the As-Built AutoCAD drawing and check the co-ordinate and level are in tolerance or not.
• Engineering Surveying of new Embankment areas, monitoring Road works
• Instrument Calibrations checking. Qualifications:
+
Good
Good grade
URL removed due to policy violation. Please contact support for further information.