mynard macatangay, Engineer I

mynard macatangay

Engineer I

Department of Public Works and Highways

Location
Philippines - Batangas
Education
Bachelor's degree, electrical engineering
Experience
19 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 6 Months

Engineer I at Department of Public Works and Highways
  • Philippines - Batangas
  • My current job since February 2021

Site visit and verification of project location to check and assess all conditions required are met for the proposed project and raises concern and deficiencies and proposes solutions and alternatives to the parties involved in the
project.
Prepares Electrical Program of Works and detailed costs estimates of various projects of the office
Prepares S-curve and PERT CPM of proposed projects.
Preparation of Lighting, Small Power, ACU, Auxiliary, Fire and Gas, Grounding, Riser Diagram ACAD drawings for various DPWH Projects (Public hospitals, Schools, Multi-Purpose Building, Public Market Rural Water Works, Public Office Buildings etc.)
Calculation of Schedule of Loads (wire sizing, circuit protection, Generator and Transformer sizing including Short Circuit Calculation to cope with estimated design load of project on-hand.
Preparation of necessary documentation for proposed projects to be submitted for Bidding purposes.
Attend prospective contractor’s bidding meeting and awarding of projects.
Checking and progress monitoring of contractor’s progress and completion of assigned projects
Assist the Project Engineer in the implementation of various projects.
Prepares various reports on status of on-going projects of the Department.

Quality Inspector at National Contracting Company
  • Saudi Arabia - Rabigh
  • November 2015 to November 2020

Assist in reviewing and Preparation of Quality Control Plans and Procedures, making revisions and adjustments to current Documents to best fit the on-going projects QAQC plans and specification requirements.
Assist in the preparation of QAQC Work packs, Work Instruction and other methodologies.
Reviews and makes revisions of the current Project ITP, relevant inspection test sheets and Quality Control Forms.
Disseminates relevant information regarding QAQC activities to all concerned parties involved
Checks and verifies the project drawings and specifications to be familiar on the construction details, location plan and other details pertaining to inspection ensuring it’s the current revision and approved for construction.
Monitor and maintain updates of daily progress of inspection performed, balance inspections to be done and look ahead schedule for easy tracking and reporting.
Prepares necessary supporting documents needed to conduct quality control inspections and for document submission.
Conducts all necessary partial or full surveillance inspections and report all non-conformities met on ongoing electrical
works/installations on site.
Coordinates with other engineering dept. of any conflict or anomalies met on site on a timely basis so that corrective actions or measures can be done in advance of a scheduled site inspection.
Facilitated RFI’s and required QC submittals for inspection as required.
Conducts Material Receiving inspections on various Electrical construction materials base on standards, specifications and data-sheet before being used/issued on site.
Conduct QC inspections on various site construction activities ensuring all work are performed correctly, on time and as per Quality assurance plan and standards that includes: MV/LV Cable Laying termination IR testing, Earthing System termination and testing, Cable tray installation and Duct work, MV/LV Switchgears installation and testing, LV Bus ducts, MV/LV transformer’s, UPS & Battery Charger installation and testing, Emergency DG set Installation and
testing, MV/LV Motor Solo run testing, Industrial & Building Lighting System installation and Illumination testing.
Functional test of Switchgears, circuit breakers, Push Buttons, Distribution/Lighting Panels etc.
Makes Follow-up Inspections necessary for Punch-list clearing.
Preparation and Compilation of accepted Inspection and test Reports for Final Hand-over to clients
Assist the QA Manager in timely execution of works, identify daily and weekly milestones for QC activities at site and develop action plan in advance.

E&I Engineer at DSME-AG&P
  • Angola
  • August 2013 to May 2015

Monitoring and inspection of fabrication/installation of Electrical and Instrumentation Equipment and related materials.
Preparation and estimation of Job Cards, Work Pack, Job Registers, work volume, S-curve, Manpower Histogram Table of organization for offshore HUC Base Scope and Carry Over Works.
Reviewed and collaborated all necessary engineering documentation.
Liaises with respective teams to solve problems encountered regarding HUC works.
Prepared and presented HUC scope of work Job Execution Plan.
Coordinated with respective teams regarding the final material packing list and on site location familiarization.
Project execution and monitoring of site activities ensuring all work are performed correctly, on time and as per Job Execution Plan. Monitor and keep updates of daily progress, Job Cards manpower and man-hour status. Coordination with site supervisors for manpower allocation, expediting of materials to be used. Review any alternatives to the design concept submitted by sub-contractors, prepare and submit reports including recommendation to engineering highlighting advantage and disadvantages of each alternative. Understand the contractual scope of work and raise variation request for any work not part of work scope but is required for job completion. Prepares Job Hazard Analysis and collaborates all necessary documents for the issuance PTW.
Report, notify and approves site modifications of electrical works.
Prepare field change request (FCR) for non-compliant installations.
Evaluates manpower, materials, equipment, tools and supplies for the work requirement. Coordinates the delivery schedule and disposition for timely and smooth implementation of the project.
Facilitated RFI’s and required submittals for inspection as required.
Maintains and updates the progress charts and status of accomplishment and submit periodic reports on current activities and look ahead work schedule.
Assist the Construction Manager in timely execution of works, identify daily and weekly milestones for activities at site and develop action plan in advance.
Coordinate with other engineering disciplines for effective and smooth accomplishment of task at worksite.
Ensure, adhere, promote and comply to safety at work site all the time.

EI Inspector/Mechanical Completion Coordinator at Tozzi Kazakhastan LLP- GETR-AG&P
  • Kazakhstan
  • February 2012 to January 2013

Prepares and review Work Pack documentation for E/I/Telecom Mechanical Completion.
Used QMIS/EDMS for documentation management and completion monitoring.
Prepares QAQC Documents such as Work Instructions, assist in reviewing ITP check and test sheets for any revisions to be made.
Uses project specific Progress and Completion system for documentation management and completion monitoring.
Makes site verification of Installations and surveillance of completed Work Packs.
Liaise with client regarding engineering drawing issues for final approval and red line markup.
Liaises with respective teams to solve anomalies and problems regarding the Mechanical completion of a system.
Coordinate with other engineering disciplines for effective and smooth accomplishment of task at work site and to meet target deadlines.
Collaborates all necessary documents needed for survey and inspection thru Progress and Completion System
Collaborates with QC department for balance inspection items to fast track ready for mechanical completion systems.
Coordinates to the concerned parties the closing and clearing of Punchlist items
Review ITRs completeness and its filled information.
Review Work Packs completed for final submission and Mechanical Completion.

Quality Inspector E&I at Foster Wheeler-AG&P
  • Philippines
  • May 2010 to February 2012

Implement Quality Assurance plan, procedures, report forms and flow chart.
Check/verify the project drawings and specifications to be familiar on the construction details, location plan and other details pertaining to inspection ensuring it’s the current revision and approved for construction.
Monitor and maintain updates of daily progress of inspection performed, balance inspections to be done and look ahead schedule for easy tracking and reporting.
Prepares necessary supporting documents needed to conduct quality control inspections and for document submission.
Conducts all necessary partial or full surveillance inspections and report all non-conformities met on ongoing Electrical/Instrumentation works/installations on site.
Coordinates with other Engineering Dept. of any conflict or anomalies met on site on a timely basis so that corrective actions or measures can be done in advance of a scheduled site inspection.
Facilitated RFI’s and required QC submittals for inspection as required.
Conducts Material Receiving inspections on various Electrical/Instrumentation construction materials base on standards, specifications and data-sheet before being used/issued on site.
Conduct QC inspections on various site construction activities ensuring all work are performed correctly, on time and as per Quality assurance plan and standards that includes: MV/LV Cable Laying termination IR testing, Earthing
System termination and testing, Cable tray installation and Duct work, MV/LV Switchgears installation and testing, LV Bus ducts, MV/LV transformer’s, UPS & Battery Charger installation and testing, Emergency DG set Installation and
testing, MV/LV Motor Solo run testing, Industrial & Building Lighting System installation and Illumination testing.
Functional test of Switchgears, circuit breakers, Push Buttons, Distribution/Lighting Panels. Power and Control cable laying IR and Continuity testing. Transmitters, Control valves, Gages, F&G Systems, AGA, installation and Precomm testing etc.
Assist the QA Manager in timely execution of works, identify daily and weekly milestones for QC activities at site and develop action plan in advance.

Quality Inspector/IPCIS Facilitator at SPIE
  • Iran
  • July 2009 to August 2010

Witness and Inspection of Power and Control cable testing, Lighting equipment installation, Heat Tracing panel/cable installation, PAGA, Fire and as equipment installation, Telecom equipment installation and associated precomm test (IR, winding resistance, Hi-pot, tubing leak test, functional and Loop test).
Inspection and testing MV/LV Switchgears, LV Bus ducts, MV/LV transformers, NER, UPS & Battery Charger, Emergency DG set, MV/LV motors solo run as per ITP and project standard, Earthing System, Lightning Protection System, Industrial & Building Lighting System, Cable tray and Duct work, MV/LV cable laying/termination, Fire Alarm system, Field Instruments like Transmmitter/Controller/Switches/Indicator, control valves, Temperature/Pressure gauges. Prepares spreadsheet from completion database necessary for tracking completed/balance system subsystems for mechanical completion.
Prepares and review Work Pack documentation for E&I Telecom Mechanical Completion.
Site verification and surveillance of completed work Packs.
Liaise with client regarding engineering drawing issues for final approval and red line markup.
Liaises with respective teams to solve anomalies and problems regarding the completion of a system.
Collaborates all necessary documents needed for survey and inspection thru IPCIS system.
Review ITRs completeness and its filled information.
Review work Packs completed for final submission and Mechanical Completion.

Quality Inspector Instrumentation at DAEWOO E&C
  • Qatar
  • October 2008 to July 2009

Responsible for witnessing together with the client, all required pre-commissioning quality control checks and test.
Inspection for the Electrical & Instrument construction works relating to progress and completion.
Test and inspection of the of plant instrumentation.
Document preparations for Project Drawings, Method Statements and ITP.
ICAPS update and input of punch list and related documents.
Processing and updating of QC Documentation and Pre-comm. Dossier via ICAPS OPERCOM system.
Closing and relaying info to construction group regarding punch list and quality problems. Issuing and closing of NCR’s.
Internal review of RFC & RFSU Dossiers to ensure compliance and completeness.
Coordinates with construction team on progress of work activity to keep update on real-time progress for ICAPS.
Coordinating and consulting with clients for the final acceptance of the plant hand over.
Assists in the preparation, review and updating of company’s quality control and operating procedures in accordance with ISO 9000 Quality control system.
Coordinate Punch list Administration to ICAPS engineer for Pre-commissioning

Quality Inspector Instrumentation at Mohammad Al Mojil Group
  • Saudi Arabia - Jubail
  • July 2006 to July 2008

Implement Quality Assurance plan, procedures, report forms and flow chart.
Check/verify the project drawings and specifications to be familiar on the construction details, location plan and other details pertaining to inspection ensuring it’s the current revision and approved for construction.
Monitor and maintain updates of daily progress of inspection performed, balance inspections to be done and look ahead schedule for easy tracking and reporting.
Prepares necessary supporting documents needed to conduct quality control inspections and for document submission.
Conducts all necessary partial or full surveillance inspections and report all non-conformities met on ongoing Electrical/Instrumentation works/installations on site.
Coordinates with other Engineering Dept. of any conflict or anomalies met on site on a timely basis so that corrective actions or measures can be done in advance of a scheduled site inspection.
Facilitated RFI’s and required QC submittals for inspection as required.
Conducts Material Receiving inspections on various Electrical/Instrumentation construction materials base on standards, specifications and data-sheet before being used/issued on site.
Conduct QC inspections on various site construction activities ensuring all work are performed correctly, on time and as per Quality assurance plan and standards that includes: MV/LV Cable Laying termination IR testing, Earthing
System termination and testing, Cable tray installation and Duct work, MV/LV Switchgears installation and testing, LV Bus ducts, MV/LV transformer’s, UPS & Battery Charger installation and testing, Emergency DG set Installation and
testing, MV/LV Motor Solo run testing, Industrial & Building Lighting System installation and Illumination testing.
Functional test of Switchgears, circuit breakers, Push Buttons, Distribution/Lighting Panels. Power and Control cable laying IR and Continuity testing. Transmitters, Control valves, Gages, F&G Systems, AGA, installation and Precomm testing etc.
Assist the QA Manager in timely execution of works, identify daily and weekly milestones for QC activities at site and develop action plan in advance.

Lead Technician at Sunpower Mfg. Ltd
  • Philippines
  • August 2004 to May 2006

Trouble shooting and maintaining of automated production equipment during breakdown and scheduled condition based preventive maintenance Logging and performing maintenance checks based on proprietary maintenance management system.
Checking and verifying of the state of lubrication/greasing of various valves, motor non/drive ends and recording in PM checklist.
Checking and repairing faulty equipment parts such as roller, conveyor belts, start-stop PB’s, proximity sensors, motor relay, inverters, circuit breakers
Re- alignment of proximity sensors and limit switches.
Functional testing of Pushbuttons HMI’s, recording of motor start-up current during Start-up
Assist the Equipment Engineer in trouble shooting PLC ladder diagram of the variable frequency drives during equipment breakdowns and scheduled preventive maintenance.
Conduct inspection, wire checking, and insulation test prior to energization of electrical circuits and equipment motors.
Install/replace electrical wiring, lighting fixtures, receptacles, switchboxes, conduits, feeders, Use power quality measuring tools such multimeter to troubleshoot circuits for proper connection, read voltage and current parameters.
Perform participate on statistical process control like Failure mode equipment analysis, Mean time Before Failure to enhance productivity and lessen equipment failures/breakdowns
Regular check over of fire and safety equipment for plant safety.
Routinely Checks and monitors on MV & LV switchgears and associated safety devices for correct functionality and logs voltage/current and power consumption parameters.
Keep and record inventory of Equipment spare parts tools and and consumables

Electrical Engineer at MIESCOR
  • Philippines
  • January 2003 to January 2004

Inspection and testing MV/LV Switchgears, LV Bus ducts, MV/LV transformers, NER, UPS & Battery Charger, Emergency DG set, MV/LV motors solo run as per ITP and project standard, Earthing System, Lightning Protection System, Industrial & Building Lighting System, Cable tray and Duct work, MV/LV cable laying/termination.
Conduct inspection, wire checking, and insulation test prior to energization of electrical circuits and equipment motors.
Electrical troubleshooting of control circuits and equipment's as per commissioning scope of work.
Conduct visual inspection of Equipment prior to start-up to ensure all circuits and equipment's are in accordance with the technical drawing and specification. All non-conformities met are reported as punch list and subject for rectification.
Isolation/ De-isolation of switchgears with lock out & Tag out procedure
Commissioning of High and Low Voltage Transformers, AC/DC Motors Starters and Switchgears, breaker and protective relays.
Conduct functional and general Illumination test of plant lighting system.
Daily monitoring of HV and LV switchboard.
Assist vendors to carry out functional test, pre-commissioning and commissioning activities
Works and tests such as insulation resistance testing, SPM testing, checking of motor bearings by means of electronic stethoscope, voltage, phase sequence and polarity testing.
Rectify punchlist prior to commissioning activities.

Education

Bachelor's degree, electrical engineering
  • at batangas state university
  • October 2002

Bachelor of Science in Electrical Engineering

Specialties & Skills

Database Management
Project Management
Quality Assurance
Autocad
Technical Writing
MS Office
OpenSolar

Languages

English
Expert

Memberships

IIEE philipphines
  • Associate
  • August 2004

Training and Certifications

AutoCAD Level I (Training)
Training Institute:
ABCC
Date Attended:
March 2006
Duration:
80 hours
isual Testing Level II (Non-Destructive Testing) (Training)
Training Institute:
WITCO Inspection and Testing Corp
Date Attended:
May 2011
Duration:
24 hours
Instrumentation Equipment Calibration Uncertainty in Measurement (Training)
Training Institute:
Acculab Calibration Laboratory Inc.
Date Attended:
October 2011
Duration:
16 hours
Building Wiring Installation and Maintenance (Training)
Training Institute:
MFI Polytechnic Inc.
Date Attended:
August 2015
Duration:
64 hours
Pneumatics and Electro-Pneumatics (Training)
Training Institute:
MFI Polytechnic Inc.
Date Attended:
February 2019
Duration:
66 hours
Advance PV Solar Installations Training (Training)
Training Institute:
One Point Systems Technologies
Date Attended:
March 2019
Duration:
24 hours
Computer Systems and Networking Servicing (Training)
Training Institute:
TESDA
Date Attended:
August 2022
Duration:
60 hours