Deputy Manager Engineering and Projects
Midas Safety
Total years of experience :8 years, 2 Months
Currently looking after Utility Operations including;
600 RT Centrifugal Chiller, 800 RT Cooling Tower, Chilled and Condenser water Pumps, AHU's.
Screw Compressors of 160 KW (01 NOS), 55 KW (6 NOS).
BWRO Plant (40 m3/hr) and process water distribution.
Fire Pumps O&M.
Domestic water network and supply.
Major Projects include;
Successful completion of HVAC Project including Chiller, Cooling Tower, Pumps, AHU's, Ducting and Piping work. Total cost of Project was $1.1 million.
Successful compeu of BWRO plant (40m3/hr) with Process water supply. Total cost of Project was $0.1 million.
Successful completion of Compressed Air distribution and 160KW compressor installation. Total Cost of Project was $0.85 million.
Successful completion of Deep Well Turbine Project at 1200 ft. Total cost of Project was $40, 000.
Successful installation and Commissioning of Wing Type PU Gloves Plant with capacity of 69, 000 DP /month. Project includes civil, mechanical and utility works. Total cost of Project was $600, 000.
Design an Automated Inventory Management System
• Worked as Internee in Die Casters Limited (DCL) of Baluchistan Engineering Works Limited (BEWL) from 23rd May’2011 to
30th June’2011.This plant specializes in pressure die casting and shell molding.
•We were assign the task to find the possible reasons of BLOW HOLES in casted parts and find out the recommendations to overcome this.
As an industrial and manufacturing engineer my diversify knowledge from manufacturing to management, from quality of product to safety of both man and machine enable me to do value addition to your organization and where I can blend my theoretical knowledge and soft skills with the practical experience.
Major subjects were Physics, Chemistry, Maths
Major subjects were Biology, Physics,Chemistry,Maths
Completed Hifz-Quran with 100 marks out of 100 in Wafaq (Federal Board of Pakistan for Hifz-Quran)