Sys & Bus Integration Manager (Basis, security, Solman, HANA, BOBJ)
Accenture
مجموع سنوات الخبرة :19 years, 1 أشهر
1-Abdullatif Jamel Project
Employer: - Accenture
Period: - 1/3/2014 to Current
OS/DB: - SUSE, Windows / Sybase, MAXDB, MS SQL
Activities:-
Technical Architecture Project Planning. Design System Landscape and Transport Management System, Security and SAP GRC.
Lead Basis, Security, Identity management and GRC teams including planning, Time, cost and deliverables Quality.
Manage all PMO related activates within my team.
Design Backup Strategy (Sybase ASE and Max DB)
installation and Post installation of Sandbox Environment (SCM 7 EHP3, APO Live cache and EWM 9 Standalone )
installation and Post installation of Development Environment (ERP6 EHP6, DBM 7, MRSS610, IS Automotive, HR Localization for KSA, SCM 7 EHP3, APO Live cache, BW 7.4, EWM 9 Standalone, PI 7.4, Solution Manager 7.1, NW TREX 7.02, BOBJ BI 4.1, SSO 2.0, IDM, GRC 10.1 and RWD U-perform)
installation and Post installation of QAS Environment (ERP6 EHP6, DBM 7, MRSS610, IS Automotive, HR Localization for KSA, SCM 7 EHP3, APO Live cache, BW 7.4, EWM 9 Standalone, PI 7.4, Solution Manager 7.1, NW TREX 7.02, BOBJ BI 4.1, SSO 2.0, IDM and GRC 10.1) )
Build Roles and Authorization
Installation and Configuration of SAP NetWeaver Single Sign on.
Configure CHARM in Solution Manger.
SP Stack upgrade on regular Basis.
install industry specific and Localization packages
Upgrade ERP to EHP7 and DBM8 and HR Renewal 2.0 along with standalone SAP NW Gateway.
SAP BW on HANA preparation and landscape design
Cross system configuration and integration.
Open text Landscape preparation and design.
performance test approach preparation
2- Saudi Electricity Project
Employer: - Accenture
Period: - 1/3/2015 to 1/4/2015
OS/DB: - Windows / MS SQL Server
Activities:-
Design Landscape for SPM and SCM
Lead Basis, Security.
Installation and Configuration of SPM (Spend Performance management) Sandbox, DEV and QAS.
Installation and Configuration of SCM/Live Cache Sandbox, DEV and QAS.
Prepare for PRD Cluster installation for SCM and SPM.
1- Saudi Geological Survey Project
Activities:-
- Complete Hardware Sizing.
- Design System Landscape.
- Install and Configure SAP Router.
- Install and Configure Solman.
- Install and Configure ERP (DEV, QAS, PRD) Systems
- Install and Configure Portal (DEV, QAS, PRD) Systems
- Install and Configure BW (DEV, QAS, PRD) Systems
- Configure ESS MSS and ADS
- Upgrade HR with the latest Enhancement Package (Maintenance Optimizer)
- Install Localization(Saudi Arabia and Qatar) ADD-ON for FI and HR (LOCHRSAE - EAPPLGLO)
-Design Authorization Concept, Creation of Roles (MM, HCM FICO), Authorization and Users.
-Integrate Portal with Company Active Directory
-SAP Content Server installation and Configuration (DMS)
- Daily Support Operation for the team
- Go- live Check Preparation, and prepare all system for service delivery
2- King Khaled University Project
Activities:-
-Install and Configure SAP Router.
-Installation of SAP Solution Manager.
-Complete Hardware Sizing.
-Design System Landscape.
-Install and configure Training environment.
-Install and Configure ERP Development System.
-Install and Configure Portal Development System.
-Upgrade HR with the latest Enhancement Package (Maintenance Optimizer)
-Install Localization(KSA and Qatar) ADD-ON for FI and HR (LOCHRSAE - EAPPLGLO)
-Solution Manger Installation and Configuration Academy Training to Technical Team.
3- King Abed El Aziz University Project
Activities:-
-SAP Netweaver Training to technical Team.
-SAP Netweaver Security Training to technical Team.
-Solution Manager Configuration and Operation Training to technical Team.
-Handle Go Live Session With SAP.
- Configure Solman 7.1 (basic configuration and incident management )
- SAP Netweaver Portal to technical Team.
-Install and Configure E-Recruitment System (DB2 for Z/os and Suze Linux)
4- Java Gulf Project
Activities:-
-Install and Configure SAP Router.
-Solution Manager 7.1 Post Installation.
-Service Desk Configuration for Value Added Reseller (VAR Partner)
-Install and configure portal for IDES System (ESS, MSS, ADS, Process and Forum and SSO)
-Install and Configure ERP Demo System (ERP 6 EHP6 with the latest Localization Package for KSA )
-Install and Configure Portal 7.3 Demo System and Configure Self Services Through ERP6 Backend System.
-Install and Configure BW 7.3 demo System and Link with backend System.
-Install and Configure BOBJ XI 4 and Data Services Demo System.
-Support Daily Operation for all teams inside and outside Office.
1- Egypt Air :-
Technical Scope: - Solman/ ERP/ BI/ PI/ BOBJ/ BPC/ WD/ RWD/ High Availability
Period: - 1/6/2011 to Current
OS/DB: - AIX / Windows / DB2/ HACMP
2-MASS FOOD :-
Technical Scope: - SAP All in One (ERP + Best Brackets)
Period: - 21/10/2010 to 10/5/2011
OS/DB: - REDHAT/ Windows/ ORACLE
3-Tarek Nour:-
Technical Scope: - SAP All in One (ERP + Best Brackets)
Period: - 17/10/2010 to 15/11/2010
OS/DB: - REDHAT/ Windows/ ORACLE
4-Egypt National Post Office (ENPO):-
Technical Scope: - SAP All in One (ERP + Best Brackets)/ BI/ High Availability
Period: - 15/10/2010 to 31/5/2011
OS/DB: - REDHAT/ Windows/ DB
5-SAP Training Program in Egyptian Universities by SAP Academy:-
Technical Scope: - Training
Period: - 1/4/2011 to 10/4/2011
for more Details Download Attached PDF Resume at the end of this page
1-Toshiba El Araby ERP6 Project (Full Implementation):-
Technical Scope: - ERP 6/ High Availability (HACMP)
Period: - 1/7/2009 to 15/10/2010
OS/DB: - AIX/ HP UX/ Windows/ ORACLE/ SQL SERVER
2-Toshiba El Araby R3 Support:-
Technical Scope: - R3 Enterprise 4.7 Landscape Support
Period: - 1/8/2008 to 15/10/2010
OS/DB: - HP UX / Windows/ Oracle/ SQL Server
PCB Production Section at Toshiba Elaraby.
(Team Management- Time Management - Planning -Change)
SAP Certified Technology Associate on SAP Netweaver Technology (Oracle DB)
Microsoft Certified System Engineer
Project Computer Network And Oracle DB (Very Good)