Project Director في Orascom Construction
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ أبريل 2017

ERC - Egyptian Refinery Project - Mostorod (Nov. 2014 - Present)
Project Director for Orascom Construction
carrying out all the SMP and Civil works for the Process Area (DHT, NHT and DCU) and the Utilities Area (Cooling Towers, Waste Water Treatment, Raw and Demineralize Water Stations)

Operations Manager / Projects Manager في ORASCOM CONSTRUCTION
  • مصر
  • يوليو 2000 إلى أبريل 2017

Major Projects:
ERC - Egyptian Refinery Project - Mostorod (Nov. 2014 - Present)
Project Director for Orascom Construction
carrying out all the SMP and Civil works for the Process Area (DHT, NHT and DCU) and the Utilities Area (Cooling Towers, Waste Water Treatment, Raw and Demineralize Water Stations)

IOWA fertilizer Plant In Iowa USA (Nov 2012 - Nov. 2014)
EPC Contract (1.2 B US$)
Technology is provided by Thyssenkrupp Uhde and Tecnimont., Stanley USA.

Projects at the Egyptian Fertilizers Company (2008 - 2012)
UAN plant - EPC Contract
New Boiler - EPC Contract
Revamp Project - EPC Contract

Bazian Power Pant for Bazian Cement Co., Kurdistan, Iraq
EPC contract, 18x4MW power plant. (Jun 06 - Aug 08)

Tasluja Power Plant for the Cement Plant, Kurdistan, Iraq
EPC contract, 5.5 MW power plant. (jun 06-Jun 07)

Tamanrasset Air Base, Algeria (Jan 04 - Aug 07)
EPC contract, 3600 cu.m. Jet fuel storage facilities, pumping stations & filtration. In addition to 22 fueling points and 6.0 KM pipe network

Arab Union Cement Company, Zlitan-Libya
Cement Line 1 (Jan 03 - Aug 05)

Algeria Cement Company
EPC contracts with FL Smidth as a subcontractor, including fabrication and installation of a cement factory

Proctor & Gamble, Hygiene & TCI-2 (Jul. 00 - Aug. 01)
P&G Tower Capacity increase-2.

Major Tasks:

Managing and supervising teams along the project phases; signing contracts, engineering, mobilization, construction, pre-commissioning, commissioning, Testing, handover, and project close out

Follow up and coordination of works to acheive and maintain the sought quality, time & cost constraints.

keeping a closed look on deliveries and supplies to ensure a timely achievement to the target plans with the least tolerances accepted

In house coordination between different departments and remote sites

Coordination between major stakeholders of the project; the client, the engineer, the subcontractors, etc. with a day to day liaison with the Engineer (Client’s representative) and the sub-contractors

Followup and supervise project planning and scheduling process, productivity and progress reports, pay estimates, claims, variation computation and negotiations

Acquired a good knowledge and coordination skills in logistics tasks, as sea freight processes.

Prepare and negotiate technical and financial agreements with subcontractors

Followup and supervised the issuance of all engineering and supplies submittals, Procurement and Materials Selection

Projects Manager / Projects Coordinator في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر - القاهرة
  • يناير 2006 إلى مارس 2006

Arab Union Cement Company, Zlitan-Libya
Line - 2

Project Engineer - Technical Office Manager في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر - القاهرة
  • أغسطس 1996 إلى يوليو 2000

Worked on the Job Site

Projects:

1- American University in Cairo - Academic Center I (Jan. 98 - Jul. 01)

2- Bristol Myers - Squibb Egypt - Plant Expansion Project (Aug 96 - Jan. 98)

Responsibilities:

- Reviewed Project planning scheduling process to be in full compliance with the contract obligations and available resources.

- Produced monthly work progress / cost control reports, monthly invoices, and subcontractors’ payment approvals.

- Day to day liaison with the client, the Engineer and sub-contractors

- Contributed in subcontractors evaluations, and had set the responsibilities boarder line of agreements with the selected Subcontractors

- Supervised preparation of Engineering Submittals and Materials Selection

- Prepared the requests of materials for procurement department to proceed.

Quality Control Engineer في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر
  • يناير 1996 إلى أغسطس 1996

Project:
Bristol Myers - Squibb Egypt - Plant Expansion Project

Responsibilities:

- Inspecting and ensuring that every phase of construction is produced according to the contract specification and my company’s standards

- Attended and witnessed all the laboratory testing and inspection of delivered Materials and products

- Preparation of QC Reports and non conformity reports when applicable.

Quality Control Engineer في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر - القاهرة
  • يناير 1995 إلى يناير 1996

Project:

Transmission Mains Project

A USAID financed project, under construction for The General Organization for Greater Cairo Water Supply (GOGCWS).
The contract was administered by CH2M-HILL International, and all construction was performed by CONTRACK- MORRISON KNUDSEN CORPORATION.
The Transmission main project consists of 18.2 KM of potable water piping 800mm to 1600mm

The project extended from El Fostat Water Treatment Plant into Ataba, Ramses, and El Guish Squares.

Responsibilities:

- Inspecting: Excavation, Soil Stabilization, Pipe Laying, cathodic protection, Backfilling and Surface Restoration (Pavement)

- Hydraulic Testing of Pipes, cathodic protection testing, lines cleaning and flushing

- Preparing Quality Control Reports

Technical Office Engineer في ORASCOM CONSTRUCTION INDUSTRIES
  • مصر - القاهرة
  • ديسمبر 1991 إلى يناير 1995

Project:

Transmission Mains Project

A USAID financed project, under construction for The General Organization for Greater Cairo Water Supply (GOGCWS).
The contract was administered by CH2M-HILL International, and all construction was performed by CONTRACK- MORRISON KNUDSEN CORPORATION.
The Transmission main project consists of 18.2 KM of potable water piping 800mm to 1600mm

The project extended from El Fostat Water Treatment Plant into Ataba, Ramses, and El Guish Squares.

- Computing and evaluating Monthly and Final Invoices

- Evaluating of Claims and variation orders

- Collecting data for Monthly Reports

- Preparing Engineering Submittals

- Mechanical and Structural Shop drawing pertaining the insulation of Pipes and construction of Valve Vaults

Structural Engineer في Dr. Sabri Samaan and Abdo Fam Consultant Engineering Office
  • مصر
  • يوليو 1990 إلى سبتمبر 1992

Responsibilities:

- Design of Structural Elements

- Editing and preparation of Calculation Sheets

- Preparation of the Structural drawings

الخلفية التعليمية

دبلوم, Project Management
  • في IPMA, International Project Manager Association
  • مايو 2005

IPMA Certified

دبلوم, Total Quality Management & Leadership
  • في Top business human Resources Consultants
  • مارس 2005

A Total Quality Management & Leadership workshop was held during the month of February and March 2005. (2 Full days a week) The workshop had covered the following modules: 1-Communication Skills, 2-Problem solving Process, 3-Process Management, 4-Leadership Skills, and 5-Team Building

دبلوم, Projects planning and scheduling
  • في American University in Cairo
  • مارس 1993

Accomplished courses in Project Planning and Scheduling using primavera software

بكالوريوس, Civil Engineering
  • في Faculty of Engineering
  • يونيو 1990

General Graduation grade: Good (74.4%) Graduation Project: Harbor design Project grade: Distinction

Specialties & Skills

MS Word
MS Excel
Windows
Primavera Project planning

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Shooting club
  • member
  • January 1996
Wadi Degla Sports Club
  • Member
  • February 2003