QAQC Engineer
CONSTRUCTORA SANJOSE
Total years of experience :10 years, 10 Months
- Facilitate the development of integrated testing and commissioning program and actively monitoring the overall testing and commissioning program
- Inspection of all MEP related Construction works and Ensuring proper installations are done as per the approved drawings, Design and project specifications.
- Monitoring quality of works and assess the safety at site including health and environmental issues, ensuring the same complies with contracts / specifications, safety and health risk assessment and environmental mitigating measures respectively on daily basis.
- Preparation of ITP, Method statements, Project Quality Plan
- Inspections for Installation & Testing and Commissioning for the Systems as below
-LV Panels, MDB’s, SMDB’s, Distribution Boards, Power Control Centre and Motor Control Centre.
-UPS System
-Earthing, ERB, IPS & Lightning Protection System
-Central Battery System & Lux Level
- Follow up for all activities regarding installation and testing and commissioning of ELV Systems( Structure cabling, BMS System, Room Management Systems,
- Review and resolve technical matters related to quality management, and quality control plans.
- Keeping Track of all QAQC activities (WIR’s, MIR’s, Testing & Commissioning) for Contractor and Subcons.
- Managing Snagging Tool (ONSITE APP) for Snag Inspection Submissions, Snags Generation & Close out.
- Carrying out surveillance for the site Activities and solve the Discrepancies and technical issues.
- Preparation/Follow up of Close out Documents (Operation & Maintenance Manual, Spare Parts, Demarcation plan, Snags Close out, As Built Drawings
- To make sure the work compliance and successful hand-over of the project
- Installation Inspections and Testing and Commissioning for the Systems as below
-LV Panels, MDB’s, SMDB’s & Distribution Boards.
-Power Control Centre and Motor Control Centre.
-UPS System
-Earthing System
-Lightning Protection System
-Central Battery System & Lux Level
-Lighting Control System
-Room Management system
-Photovoltaic and Solar System
-Global Positioning System
-LV SCADA System
-Harmonic Filters
-Hands on Experience on different type of Electircal tests like HVAC withstand, DC withstand, CT PT Turn
Ratio, Transformer Turn ratio, C&DF, loop impedence, Dc Resistance, Earth Resistance Insulation
Resistance etc
- Following up of Snagging Process(Software tool ONSITE 2.0) for the project and Close out Documents
- Inspection of all MEP related Construction works and Ensuring proper installations are done as per the
approved design drawings and project specifications.
- Carrying out surveillance for the site Activities and solve the disappearances and technical issues.
- To make sure the work compliance and successful hand-over of the project
- Monitoring quality of works and assess the safety at site including health and environmental issues, ensuring
the same complies with contracts / specifications, safety and health risk assessment and environmental
mitigating measures respectively on daily basis.
Provided technical assistance to the Management in all QHSE, QMS Related activities
Contributed in Revision/Finalization of Integrated Management System Documents
Custodian for Statutory, Regulatory documents, Organization IMS Documents, Client and Contractor specification
Quality Management Representative at site and office level for ISO Certification and Surveillance Audits
Prepared Audit Schedule, Audit Plan, Conduct Audit, Review, Prepare Audit Report and Close out the Audit
findings
Performed Project QHSE Audits, Sub Contractor Quality Audits, Supplier Quality Audits
Evaluated Sub Contractor, Supplier and vendor Quality Systems, procedures and Quality Plans
Implement and maintain QHSE company procedures as per company IMS both in office and at sites.
Review and resolve technical matters related to quality management, HSE Management and quality control plans.
Conducts periodic site visits to ensure implementation of QAQC procedures.
Coordinate with QHSE/QC Inspectors at sites.
Involved in Pre-qualification Documentation regarding QAQC requirements
Design of Load schedule and SLD based on TCL
Inspection of all MEP related Construction works
Carrying out survilance for the site Activities and solve the disperancies and technical issues.
Issuing and following up of NCR, CAR for the execution works non complying to the installation standards and Specifications
Inspection for the Material related to all MEP activities complying to projects Codes and Standards
To make sure the work compliance and successful hand-over of the project
Monitor quality of works and assess the safety at site including health and environmental issues, ensuring the same complies with contracts / QCS specifications, safety and health risk assessment and environmental mitigating measures respectively on a daily basis.
Provided technical assistance to the Management in all Quality Related activities
Prepared ITP, , QIP, QCP, PQP, CQP, and Method Statements
Review and resolve technical matters/Queries related to quality management and quality control plans, ITPs(QIP’s), QA/QC documentation
Follow up and Addressing NCRs/CAR/PAR to Resolve quality non-compliance issues.
Carried Out Material Inspections and provide approval for releasing the materials to site
Inspections for HV, MV, LV, CONTROL cable laying, Testing and Glanding (HIPOT, IR Continuity)
Inspections for Installation & Pre commissioning of of HV & LV Bus Duct (Hipot, IR, Contact Resistance, Moulding etc)
HV, MV, LV Transformers installation and Precommisioning Testing (TTR, Winding Resistance, IR, Oil Dielectric Test etc)
Inspections and testing for 220 KV GIS, 33KV, 3.3KV, LV Switchgears Installation and Precommisioning Testing
AC/DC UPS, Battery Chargers Racks, Convertors installation and Precommisoning
Installation of Cable Trays(Ladder Tray etc), Cable Tray Supports,
Installation of Lighting System, Lightening Protection,
Earthing Network Installation(Earth Rods/Deep Earth Wells).
Cathodic Protection for Tanks/Pipelines.
To make ensure that All the Execution is in compliance with QHSE codes and Standards.
Making Up, Follow up and Approval of MC Dossiers
Carrying Out Calibrations and inspecting to Client for the Gauges. Transmitters, Control/on-off valves.
Ensured Electrical and instrument equipment works complied with project specifications, company procedures, method statements and quality assurance
Follow-up and closing of PL, NCR’s and CAR’s related to E&I.
Ensure that work instructed and actual role performed is in the line with the concept of value addition to project phase
Preparing Loop documents, Carrying Out Loop Testing
Carrying Out Inspections Related to Cable Tray Installation, Cable Laying, HV/LV Cables Testing, Conducting Motor Solo Run Test, Public Address System Installation, Telecom System, CCTV System, Instrument Installation etc
• Installation and Erection of Electrical Equipment like
Power Transformers(20MVA, 1.6MVA)-PauwelsTraffo make
LV& MV Switchgears (6.6KV/430 V) at Substations-SE Make
132 KV & 220 KV Switchyard Equipments
MV/LV Motors, Circuit Breakers
• Also Involved in commissioning & Site Acceptance Testing of Electrical equipment like
Power Transformers(20MVA, 12.5 MVA, 1.6MVA, )
MV & LV Switchgears (6.6KV/430 V&11KV/430 V) at Substations
MV/LV Motors, Circuit Breakers
Switchyard Equipment CT, PT, SF6 CB, Isolators,
UPS, Battery Charger/Rectifier
DOL, Soft Starter, Star Delta starter Circuits
• To make ensure that All the Execution is in compliance with HSE codes and Standards.
• Dealing with Sub-Contractors, checking their work progress in line with project’s approved work schedule and quality standards.
• Checking the compliance of electrical materials According to Project Specification and Quality standards.
• QA/QC documentation, CQDs, O&M Manuals, Inspection of different types of QA/QC inspection related to E&I department according to QIP along with OE Engineer and follow up of NCR, Punch lists and Warranty Items
•Preparation of Daily, Weekly and Monthly Progress reports
• Reporting of daily, weekly and Monthly progress of electrical to project manager.
• Installation, Testing & Commissioning of GPS & Complete Low Current System Package (CCTV, LAN, PA system, FO Splicing).
• Well awareness of Engineering Drawings, GA, SLDs, DOL, Soft starter IWD, P&ID, Hook ups Location Drawing etc.
• Basic understanding of GTG, STG having power capacity of (127MW each, 133MW) and HRSG’s.
• Coordinate between the construction contractor and the Design Engineer to resolve field discrepancies in design packages and address material delays.
• Coordination with local vendors
• Trained for Permit to Work System (PTW), Pre-commissioning and commissioning HSE Protocols.
• Ensure that HSE considerations are consistently treated as high priority throughout engineering, construction, and turnover.
• Respond to safety incidents following proper incident notification process, participate in investigations, and complete action items as required to prevent reoccurrence
• STRATEGIC TIME MANAGEMENT WORKSHOP Feb, 2013
• Personality Development Workshop May, 2012
• Matlab
• Microwind
• C++
• MS Office
• Adobe Photoshop
learned about switchyard, operation and maintenance of Power plant, Hydraulic Turbines and Generators
• BSc Electrical Engineering 3.58/4 CGPA ✓ Mirpur University Of Science And Technology (MUST), Mirpur 2009-2013
Fsc Pre Engineering
Received Best Prefect Award