Senior Risk and Disaster specialist
Confidential
Total years of experience :15 years, 5 Months
Risk assessment, risk management, contingency planning, risk mitigation, risk measurement, prioritization of risk, measurement of each expected risk in the way, measurement of variables, risk investigation, risk actor and maximizing impact, setting risk limits, prioritizing risks Risks, preliminary plan, identification of general problems of the project
- Assistant of PCD & PD in all tasks related to Projects control & RM plan and activities of RM in all departments
• Preparation and production of the maps and site analysis as per coordinates of the site and check
with contractor. • Managing between lead survey engineer with the contractor. • Following up work at
the site of the beginning of the project . • check Surveying with contractor. • check General layout with
contractor. • check Leveling work on site with contractor. • check the drawing of surveying work with
contractor. • check Resection & intersection network with contractor. • check for all survey work on site with
contractor. • check the quantity for topographic survey. • check monitoring work for the existing building. •
check monitoring work for the tunneling works.
• Structural design • Surveying, • General layout • Supervised pipe work installation • Concrete protective
coating • Leveling work on site • Make the drawing of surveying work • Resection & intersection network
King abdullah road part (1) King abdulaziz road ( flayover ) King Abdullah Project II ( KAP-II) - King
Abdullah Bin Abdulaziz for Development of the Security Facilities(with Ministry of Interior (MOI).The
project value +/- 20 billion SR ( 41sites, 35 housing sites and 11 medical centers sites throughout KSA.
(average land area of 500, 000 to 1, 000, 000 sq. m. per project site) King Abdullah Project 1 (KAP 1)-
King Abdullah Bin Abdulaziz for Development of the Civil Defense Facilities comprise of 305 project
sites with land area average of 5, 000 to 15, 000 sq. m. per site covering the entire KSA. Saudi Arabia
National Guard (SANG) Housing project- Comprise of 6, 000 housing units with complete amenities. -
Preparation and production of the maps and site analysis as per coordinates of the site - revise all the invoice
and total amount of the projects - mange between the sites project management with the coordinators -
Preparing contracts for subcontractors between the company and contractors, Follow up work at the site
of the beginning of the project and even give it to Consultant. - Software:- AutoCAD 2012 Computer
Aided Design ( CAD) Software Building Information Modeling (BIM) solution for civil engineering design
anddocumentation for transportation & land development. SAUDI OGER Limited Design & Engineering
Division Site Development Riyadh, Saudi Arabia
• Structural design • Surveying, • General layout
I always look forward to learn new things, go through new challenges and responsibilities, as I believe that this is the only way to be professional