Nasser Salik, Project Construction Manager

Nasser Salik

Project Construction Manager

FLOUR DANIELS PHILIPPINES

Location
Philippines
Education
Bachelor's degree, Civil Engineering
Experience
39 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :39 years, 6 Months

Project Construction Manager at FLOUR DANIELS PHILIPPINES
  • Philippines
  • My current job since January 2018

Flour is providing engineering, procurement and Construction Management (EPCM) supports for Petron Bataan
Refinery Expansion in response to increasing demand for refined petroleum products. Work scope includes civil &
structural works, new boundary fencing, new pipe bridge and pipe racks, catch basin & sumps, pump station, cooling
tower basin, and mechanical, electrical, instrumentation structural supports, and among other item of facilities.
Duties and Responsibilities:
➢ Execute and monitor field construction activities in conformance with IFC drawings, specifications, schedules,
method statements & procedures, quality requirements, and safety standards.
➢ Control approved construction schedule and cost through the efficient use of all construction resources,
including materials, manpower, tools, and equipment.
➢ Monitor productivity and implements appropriate action to maintain maximum labor productivity, and cost
effectiveness.
➢ Active in the development of safety culture in the project, and adopt safety a natural part of all activities
performed.
➢ Provide daily and weekly highlights progress reports with corresponding photos to the project manager.
➢ Proactively identify construction constraint and carry out necessary measures to prevent schedule delay.
➢ Attend weekly progress meeting, quality meeting, safety meeting in order to assess work performance, trends,
and other relevant issues onsite.

Construction Manager at AECOM (PHILIPPINES)
  • Philippines
  • May 2018 to February 2019

Upgrading the capacity of republic cement plants to 10 million tons per day. The cost of the first phase is
part of the USD300 million capacity expansion program over the next five years both in the provinces of
Bulacan, Tanay, Batangas & Iligan.
Duties and Responsibilities:
➢ Monitor site progress and project cost through on-site observation and maintenance of daily records of site activities
to ensure project is constructed in accordance with the design, budget and milestone schedule.
➢ Develop schedules for reaching objectives and make sure activities comply with accordingly.
➢ Established & evaluate deviations to contract technical specifications & regulatory requirements to ensure that
such deviation shall be process in accordance with project’s procedure & properly documented.
➢ Enforce safety measures and company regulations and obtain required permits and other relevant documents.
➢ Authorize / approve project personnel transactions, purchase requisitions, change requests in considering the
relative costs and potential actions to choose the most appropriate one.
➢ Regular present on site to ensure that work is carried out safely and efficiently (take time off in lieu to compensate
for unsocial hours).
➢ Keep client and project director of current trend on site issues that may potentially affect the project milestone schedule.
➢ Monitor schedule of daily activities including manpower, equipment and materials availability onsite.
➢ Ensure that quantities of completed work items are agreed with the concerned prime Contractor.
➢ Identify construction constraints and carry out measures to prevent construction schedule delay.
➢ Provide routine daily, monthly reports and/or special reports required by the company procedures, operating mgt.
➢ Update and inform the client, project director, design consultants of the status of deliverables, milestone schedule
and among others issues concern.
➢ Attend in weekly progress meeting in order to assess work performance, schedule update, trends and other
relevant issues.

Senior Project Engineer at CH2M Hill
  • Saudi Arabia
  • November 2016 to March 2018

awarded CH2M the execution of two turnkey contracts for the Fadhili Gas Plant. CH2M
scope covers EPCM of Package 1 Fadhili Gas Inlet & Treatment Facilities and Package 02 - Fadhili Process
Utilities & Interconnecting Systems. The Fadhili Gas Plant (FGP) consist of five processing trains. Four of
these trains will process Hasbah offshore gas, consisting of inlet gas handling, gas sweetening, dehydration,
and one train will process Khursaniyah onshore gas, consisting of inlet gas handling, and gas sweetening to
produce fuel for the cogeneration facilities.
Duties and Responsibilities:
➢ Provide technical knowledge and recommendations in resolving any unforeseen conflicts in the plan and specification.
➢ Participate in inter-discipline planning and simultaneous operation (SIMOPS).
➢ Ensure all staff and workers have attended safety induction prior to mobilization onsite.
➢ Identify construction constraints and carry out measures to prevent construction schedule delay.
➢ Prepare project safety plan including HIP (hazard identification plan), risk analysis and risk mitigation for approval of
Dhahran Safety Department and Loss Prevention Department.
➢ Monitor schedule of daily activities including manpower, equipment and materials availability onsite.
➢ Oversee excavation and backfilling of underground pipelines, power cables and related utilities.
➢ Supervise the construction/erection of structural steel shelters and above ground pipe racks.
➢ Monitor the fabrication and installation of pipe sleepers and various types of pipe supports.
➢ Supervise the construction of facilities i.e. offices, industrial building paving of process areas and roads.
CV

Lead Project Engineer at BRUCE SHAW INTERNATIONAL LIMITED
  • Saudi Arabia
  • March 2015 to October 2016

Ensure availability of resources and materials at all times and compliance to project specifications.
➢ Participate in weekly progress meeting in order to assess work performance, schedule update, trends and other
technical / site relevant issues.

Project Engineer at YANBU ARAMCO SINOPEC REFINING COMPANY (YASREF)
  • Saudi Arabia
  • May 2013 to December 2014

Project Highlights:
Yanbu Aramco Sinopec Refining Company (YASREF) is a large and complex joint venture project between Saudi
Aramco & SINOPEC of China, designed to utilize the world class full conversion of a new “grassroots” refinery using
400, 000 barrels per day (bpd) of Arabian Heavy crude oil to ultra clean transportation fuels for international and
domestic markets. In addition of high-value refined products of 90, 000 (bpd) gasoline, 263, 000 bpd of ultra-low-sulfur
diesel, 6, 300 metric tons per day (mtd) of coke and 1, 200 mtd of sulfur located mainly at Yanbu red sea cost.
Duties and Responsibilities:
➢ Worked with Project Management Team to support and accelerate the construction phase project in supervising
and monitoring of EPC contractor/s daily work performance.
CV

Civil Engineer at Saudi Aramco
  • Saudi Arabia
  • April 2011 to May 2013

Review of EPC contractor’s submittals i.e. Shop Drawings, Materials Approval Request (MAR), Red lines / As-Built
Drawings, Method Statements, Material Samples including Inspection Test Plan (ITP) to ensure in compliance with
the design drawings, specifications and project quality mgt. & Information system (PQMIS).
➢ Oversee the construction of Transport Conveyor Structures (7.3km), Jetty (31m x 300m), Ship Loader Structures,
Mechanical / E&I’s Support Structures, Sulfur Storage Building (1, 200 mtd storage capacity), Coke Storage Building,
(6, 300 mtd storage capacity), Operation & Maintenance Building, Substation /Transformer Building, Pelletizer
Building, RMCC’s Pad Foundations, Skid Mounted Rotating Equipment’s Foundation, Security & Supports Building,
A/G & U/G Piping Support Structures.
➢ Familiarity with pipeline construction i.e. trenching, bedding, shoring/supports, benching/sloping, pipe stringing, pipe
laying, testing and lateral tie-ins to existing facility lines interfaced.
➢ Good knowledge with Permit to Work system (PTW - Hot & Cold Works), Job Safety Analysis (JSA).
➢ Prepare project status reports by collecting, analyzing, summarizing information trends accordingly.
➢ Assessed EPC contractor’s request for information (RFI’s) and recommend corrective resolution.
➢ Ensure the construction interfaces scoping activities with interconnecting packages were managed efficiently, facilitating
the prompt resolution of any technical queries onsite.
➢ Work interfaced among other trade disciplines of various teams and departments on issues relevant to the work packages.
➢ Proactively, identify & bring to the attention of senior project engineer of any potential problems which could trigger the
delay & cost deviations and have adverse effect on baseline schedule.
➢ Maintain logs & records of site activities, prepare progress highlights report in daily, weekly and monthly basis.
➢ Establish & monitor Key Performance Indicators (KPI) to measures quality performance in different areas of
work development and various project phases.
➢ Monitor EPC contractor’s manpower, materials and equipment resources to ensure availability on site and
effectively utilized in accordance to the contract requirements.
➢ Participate in weekly Progress Meeting, QA/QC meeting, Safety Meeting and Coordination / Interface Meeting.
➢ Manage MCC walkthroughs throughout the project prior to pre-commissioning schedule and handover processes.
SAUDI ARAMCO NGL PROGRAM
SNGLPD / EW&ID RIC Expansion Project
Sabkha-113, Rub Al Khali

Construction Superintendent at TECHNIP GEOPRODUCTION SDN BHD
  • Malaysia
  • October 2009 to March 2011

Monitor contractor’s manpower, materials and equipment resources to ensure availability on site and effectively
utilized in accordance to the contract requirements.
➢ Oversee the ongoing activities based on the applicable Saudi Aramco prevailing standards, i.e. Saudi Aramco
Engineering Standard (SAES), Saudi Aramco Engineering Procedures (SAEP), Saudi Aramco Materials System
Specification (SAMSS), Saudi Aramco Testing & Inspection Plan (SATIP), IFC drawings and other relevant standards.
➢ Prepare weekly report highlights, i.e. work percentage accomplishments, progress photos, proactive notifications,
focus assessment, and lessons learned.
➢ Attend to the weekly progress meeting, quality meeting, safety meeting and communication meeting.
➢ Utilize quality management information system (QMIS), an e-log SAP module to verify RFI’s, record inspection
findings and test results, in compliance with Saudi Aramco requirements
➢ Oversee the construction of perimeter fencing / gates, installation of CCTV cameras in all perimeters and access
points to be monitored 24/7 by CCTV. These cameras have Pan/Tilt/Zoom (PTZ) capabilities, and are strategically
placed throughout the projects.
➢ Monitored the installation of exterior lighting strategically placed throughout the utility / facilities area to highlights the
perimeters, gate and guard post access points, entry points into buildings, and areas of interest.
➢ Installation of Electronic Access Control System (EACS), which has been installed throughout the projects and facilities.
➢ Installation of Intrusion alarms serve two important functions; to provide 24/7 monitoring in remote locations where staff
is not always present and in all CIP-designated spaces. These Intrusion alarm systems are monitored 24/7.
➢ Review the EPC Contractors progress and productivity measurement reports and advising the senior project engineer
on trends or occurrences that might potentially on negative impact.

Resident Engineer at KEO INTERNATIONAL CONSULTANTS
  • Kuwait
  • September 2006 to September 2009

AL BABTAIN Mixed-use Tower Complex
CV

Senior Project Engineer at ILF Consulting Engineers
  • Saudi Arabia - Western Province
  • August 2004 to September 2006

Construction of a Sanitary Sewer Mainlines System in Jeddah, Saudi Arabia. The said project was
executed by way of both the conventional open trench method, tunneling and micro-tunneling. Overall
length of pipeline designed as 250 kilometers composed of (Vitrified Clay Pipe (VCP) ranging from
Ǿ400mm - Ǿ600mm and Glass Fiber Reinforced Plastic Pipe (GFRPP) ranging from Ǿ700mm - Ǿ2,
500mm respectively.
Duties and Responsibilities:
➢ Develop, implement and administer project engineering procedures, work controlling of technical documents and
standard quality of workmanship.
➢ Established communication with key representatives of the main contractor & eleven (11) nominated subcontractors
to ensure smooth coordination of respective site activities.
➢ Interpret correctly the contract documents, specifications and the client’s requirements in association with the head
office in order to ensure the client and the contractor have the same understanding of the terms and conditions.
➢ Ensure with the team that workmanship, materials and equipment used onsite have been approved, and all test
reports have been reviewed and approved.
➢ Review/check shop drawings and other document submittals and recommend approval in compliance with the
contract design drawings and related project’s specifications.
CV

Project Engineer at FLOUR ARABIA COMPANY LIMITED
  • Saudi Arabia
  • January 2002 to August 2004

Respond to contractor/s raised technical site queries (TSQ) of site related issues and recommend for resolution.
➢ Strictly enforced all provisions of the contract documents from conventional excavation, thrust boring, micro-
tunneling, pipe laying, testing, backfilling until reinstatement of disturbed road surfaces.
➢ Monitor contractor’s work progress relative to the construction baseline schedule and advice the project manager
of any issues or potential delays to the project’s milestone schedule.
➢ Establish & monitor Key Performance Indicators (KPI) to measures quality performance in different areas of work
development and various project phases.
➢ Monitor contractor’s manpower, materials and equipment resources to ensure availability on site and effectively
utilized in accordance to the contract requirements.
➢ Manage MCC walkthroughs throughout the project as per Project Pre-Commissioning Schedule and follow up
EIL/MCC consolidation, closure and handover processes.
➢ Dealing with Project Close-Out activities including the Post-MCC items and final assets handover.

Senior Project Engineer at ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS
  • United Arab Emirates
  • February 1992 to October 2001

Project Highlights:
(1) Saudi Officers and Internal Forces Sports Club in Riyadh, Saudi Arabia. Original Contract Value
of SAR267, 315, 150.00 - (USD70, 905, 875.00).
(2) Twin Tower (16th floors) of Saudi Basic Industries Corporation (SABIC) Central Headquarters
in Riyadh, Saudi Arabia. Original Contract Value of SAR735, 475, 000.00 - (USD195, 086, 207.00)
CV

Pavement Engineer at SAUDI BINLADIN GROUP
  • United Arab Emirates
  • February 1990 to January 1992

(3) Seven (7th
) Floors Saudi Basic Industries Corporation (SABIC) Eastern Province Headquarter
Offices in Al Jubail, Saudi Arabia. Contract Value of SAR294, 537, 877.60 (USD78, 126, 758.00).
(4) RSAF project in association with WS Atkins Associates in the construction of a New Airbase
Facilities (ABF) Project for the Royale Saudi Air force (RSAF), in Al-Jouf Sakaka, northern frontier
of Saudi Arabia. The project’s scheme composed of four Aircraft Fighter Jets Shelters, four Ammunition
Building, Energy & Control Building, Explosives Preparation and Inspection Building, Fault Signaling
Building, Command / Fire and Rescue Building, Station & Aircraft Ground Equipment Building, Runway
Supervisory Building, Water Storage & Supply Building, Aircraft Refueling Apron, Last Chance Apron,
Washing Apron, Sewage Treatment Plant, External Utilities, Taxi tract and Service Roads Network.
1. Fencing & Gates, 2. Exterior Lighting System, 3. CCTV Cameras \[Pan/Tilt/Zoom (PTZ) capabilities\],
4. Electronic Access Control System (EACS), 5. Intrusion alarms and among others.
(5) Saudi Aramco’s General Engineering Services (GES) Design Contract as follows;
A. Housing Community in Abqaiq for land used master planning.
B.Residential Community Support Buildings in Hawtah Oil field Development Project, (BI-8174).
C. Furniture Storage Building (LIP), Udailiyah, (EWO-58994).
D. Travelling Crane Support Structures, Utmaniyah, (EWO-58926).
E. Health Care Building converted into Dental Clinic Facilities, Ras Tanura, (BI-3314).
F. Materials Storage Yard and Fencing Facilities, Dhahran, (ER-3298).
Duties and Responsibilities:
➢ Review / checked documents submittals and recommend approval i.e. shop drawings, materials samples and test
records, equipment machines and calibration records, method statements and among others.
➢ Coordinate all engineering details aspects with other discipline and keep aware of interface in services.
➢ Review & check contractor’s project quality plan (PQP) and inspection test plan ( ITP) including performing witness
point and hold point inspections of construction and installation activities.
➢ Strictly enforced all provision of the contract documents and specifications.
➢ Regularly conducted site visit to make sure that ongoing activities were properly coordinated in accordance with
approved shop drawings and related contract documents.
➢ Respond to contractor’s raised technical site queries (TSQ’s) regarding site related issues and recommend appropriate
resolution.
➢ Review and check contractor's monthly invoices prior to the issuance of payment certificate.
➢ Oversee the maintenance record of site activities, number of contractor’s personnel on site, equipment utilization,
difficulties encountered on site and violation of safety rules and regulations.
➢ Attend weekly progress meetings with both the presence of client representative and the concerned contractor/s
in order to discuss progress of work, potential project’s difficulties, identify apparent lapses in the schedule and
recommend necessary resolutions.
➢ Involved in the evaluation and design conceptualization of Saudi Aramco’s General Engineering Services (GES)
contract packages on above mentioned respective projects, (A to F).
➢ Review contractor’s interim payment requests prior to issuance of payment certificates based on work percentage
accomplishments.

Civil Project Engineer at Mohammad Binladin Organization
  • Saudi Arabia - Western Province
  • October 1987 to December 1989

Construction of eighty-six (86 Units) multi-palatial complexes including main palace for H.R.H King Fahad
Bin Abdul Aziz at Mina, Holy City of Makkah. Also in the contract, the construction of Heliport, Mosques
and Service Roads Network. Contract lump-sum value of 1.5 Billion Saudi Riyals (US$397, 877, 984.00).
Duties and Responsibilities:
➢ Implement approved construction drawings and specifications, prepared method statements and supervised
projects’ execution.
➢ Set out detailed works as per contract drawings, establish the level and control points and ensure carried out on
a regular basis. Resolve any unexpected technical difficulties and other problems that may arise at any time.
➢ Review and monitor milestone schedule against actual work progress.
➢ to address slippage in schedule and report/update status to the construction manager.
➢ Preparation of estimates, material submittals and take-offs, complete preparation of quantity statements, purchase
orders, procurement of materials and self-checking of all required site material deliverables.
➢ Issued work time table requirements with subordinates to ensure project’s momentum.
➢ Supervised day to day work directions as required for the implementation of new or existing facilities i.e. Civil,
Structural RCC works, all kinds of architectural finishing works, asphalt and concrete road pavements.
➢ Met frequently with other members of trade disciplines to make sure that all activities at site were properly
coordinated. Produce two (2) weeks look ahead schedule, site diaries and allocation sheets.
➢ Attend progress and coordination meetings including participation in technical/special meetings as necessary in
the nature course of the events of site relevant issues.
➢ Review and analyzed properly the schedule of activities and make sure that site work implementation adheres with
the contract documents / specifications and within budget constraint.

Civil / Structural Inspector at Braun Transworld Corporation
  • Kuwait
  • June 1986 to August 1987

Project Highlights:
Construction of Mina Abdullah Refinery Modernization Project under the clientele of Kuwait National Petroleum
Corporation (KNPC). Civil / Structural scope comprises of cast-in-situ of inter-connecting Pipe Racks (Trains 1, 2, 3 &
4) foundations, erection of structural steel for above ground pipe racks, cooker drum and cabling instrumentation
system. Excavation (Cut & Fill) for both the routing of underground buried pipelines (Tie-in/Points) and high voltage
power cables. Asphalt paving into required surfaced covered process areas and access roads network. Cast in placed
of heavy machineries foundations i.e. rotating equipment, Gas Turbines, Vessels, Heat Exchangers, Furnaces,
Boilers, Reactors, Towers and among others.
Duties and Responsibilities:
➢ Monitor civil and structural works including but not limited to setting out of misc. items i.e., excavation / backfilling,
concrete / steel structures, sub-station / industrial buildings, road / paving works, drainage system / grading works,
and other associated civil works within the plant process areas.
➢ Review QA/QC submittals and provide inputs, including but not limited to inspection test plans (ITP), method
statements, materials review and other relevant document required for the project.
CV

Field Office Engineer at DM Consunji Engineers, Incorporated
  • Philippines
  • June 1984 to May 1986

Monitor and inspect for the erection of structural steel for shelters and above ground pipe racks.
➢ Review concrete mix designs submitted by the contractor and validate trial mix reports according to project
specifications and requirements. Ensure batching plant compliance and calibration certificates including
competency assessment of operators.
➢ Perform pre-pour inspection and post-concrete surveillance to ensure all construction requirements particularly for
“hot-weather concreting” are being followed onsite.
➢ Validate source/vendor for general fill materials as submitted by the contractor, including laboratory test reports of
various types of backfill materials as per project requirements.
➢ Monitor the construction of asphalt road including but not limited to survey setting out, formation of sub-grade,
sub-base, road base, and laying of asphalt base course and asphalt wearing course.
➢ Obtained required certificates or schedules from contractor/s for review, witnessed and approve all related tests
required to be perform and maintain the records accordingly.
➢ Check calibration certificates of laboratory tools and equipment. Random witnessing of actual test procedures for
soils, asphalt and concrete samples.
➢ Issue non-conformance report as necessary and determine corrective / preventive measures.
➢ Maintain daily diary of all relevant status of work done onsite particularly civil and structural activities.

Education

Bachelor's degree, Civil Engineering
  • at Technological Institute Of The Philippines - Manila
  • May 1984

courses: BsCEng) – Technological Institute of the Philippines ABET (Accreditation Board for Engineering and Technology), globally recognized and certified institution.

Specialties & Skills

Critical Thinking
Risk Analysis
Communicator
Scheduling
Team Leadership
Leadership
Communication
Planning & Goal Setting
Problem Solving
Negotiation
Team Management
Delegation
Risk Management
Critical Thinking
Adaptability

Languages

English
Expert
Arabic
Intermediate
Filipino
Native Speaker

Memberships

Project Management Professional (PMP)
  • Member
  • November 2018
Philippine Institute of Civil Engineers (PICE)
  • Member
  • April 1998

Training and Certifications

Computer-Aided Construction Project Management (Training)
Training Institute:
CADVISION Engineering Technologies
Date Attended:
February 2010
Duration:
40 hours

Hobbies

  • Lawn Tennis, Board Games