Manager(Mechanical)
Punj Lloyd Ltd.
Total years of experience :16 years, 1 Months
HVAC System Design,
Heat Load Calculation, Equipment sizing and selection.
Pressure Drop Calculation & Pump Sizing.
Reviewing of the documents related to engineering & design for the assigned systems.
Preparation of Technical Evaluation Reports (TER).
Coordination between Engineering and Construction groups for assigned packages.
Circuit Identification Activities for Hydro test.
Hydro testing activities for Primary Piping Package of Atomic Power Plant
Coordination of material inspection with client and third party inspection.
Expediting the supply of package items and follow up till material reached at site.
Costing, Bidding & Estimation.
Cross Functional Coordination for Engineering
Preparation of Piping Layout as per P&ID.
Preparation of Isometrics
Preparation of bill of material.
Exposure in 3-D Modeling on PDMS and 2-D Drawing on AutoCAD