Navin باجراشيا, MEP Project Manager

Navin باجراشيا

MEP Project Manager

Allied vision electromechanical works

البلد
الإمارات العربية المتحدة - الشارقة
التعليم
ماجستير, Hydro–Technical construction
الخبرات
22 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 9 أشهر

MEP Project Manager في Allied vision electromechanical works
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2021 إلى أكتوبر 2021

Worked for Expo 2020 couple of projects when crucial stage for handing over. Specially worked in Russian pavilion where following activities were mainly focused.
CCTV, WIFI, Access control, BMS, Fire Alaram, HVAC, .

MEP Project Manager في Emirates Falcon Electromechanical Company - Efeco
  • الإمارات العربية المتحدة - دبي
  • مايو 2018 إلى أبريل 2020

Worked as MEP project manager in the uae most prestigious and iconic project Expo 2020 UAE pavilion. Project is falcon shape structure with wings can be operate open and close. Overall value of the project is near to 500 mln upon completion and 150mln for MEP only.

Senior MEP Construction Manager في Arabtec CCC JV
  • كازاخستان
  • أبريل 2014 إلى مايو 2018

Working as Sr. Construction Manager -MEP Since April, 2014 by Arabtec-CCC-JV (D&B Contractor) for the Abu Dhabi Plaza being constructed in the Capital City of Kazakhstan. The $1.6 billion mixed-use Commercial scheme which consist 382m High Central Asia's tallest tower. The project is scheduled for completion by the end of 2019.

MEP Project Manager في Catic the Chinese CompanyNovotel and Ibis Hotel Abu Dhabi-Sheikh Ahmed Bin Saif Bin Mohd Al Nahyan
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2009 إلى مارس 2014

 Plan and monitor the construction progress, and provide periodic progress report.
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation.
 Review all the variation work and to comply as per the contract clauses.
 Review all the material submittals and to ensure it comply as per specification.
 To monitor all discipline and to coordinate with civil with all respect.
 Reviewed method statement and ITP
 Tracking and resolutions of non-conformances
 Discuss and resolve daily site problems with site teams.
 Ensure proper output in terms on quality and quantity of work, with safe working methods
 Supervise the implementation of health and safety procedures
 Ensure the premises are maintained to company standards

MEP client Representative في Dubai world trade centre
  • الإمارات العربية المتحدة - دبي
  • أبريل 2008 إلى مايو 2009

 Review quality plan, , tracking and resolutions of non-conformances, assisting in drawing up a Project Execution Plan. Monitoring the output of the design consultant against their program and ensure all deliverables are met.
 Reviewed method statement and ITP Site supervisions, Ensure the Contractor’s compliance with the Contract Documents. Inspect all workmanship and material. Coordination with main and all sub-contractors. Documentation management of files, correspondence, records and designated forms. These records include all reports on work force, equipment, progress, safety, etc. Preparation of the daily, weekly and monthlyReports.Ensure activities, meeting, reviews, rectification measures, and accident reports are included in the Monthly Progress Report. Inspect safety conditions and inform the Contractor of construction safety violations and follow up action to be taken.

MEP Project Manager في Falcon Electro-Mechanical Construction Co. LLC in Dubai
  • الإمارات العربية المتحدة - دبي
  • يوليو 2005 إلى أبريل 2008

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Reviewed method statement and ITP
 Tracking and resolutions of non-conformances
 Plan & mobilize the permanent material required for the proper completion of work on schedule
 Plan for the mobilization & demobilization of the personnel, equipment, & material from one project to another
 Discuss and resolve daily site problems with site teams.
 Ensure proper output in terms on quality and quantity of work, with safe working methods
 Supervise the implementation of health and safety procedures
 Ensure the premises are maintained to company standards

Senior Qty. surveyor في Saudi Archirodon
  • المملكة العربية السعودية - جدة
  • مايو 2004 إلى مايو 2005

 The main responsibilities are preparation of quantities related to all kind of civil works and MEP works
 Submission of valuation to the client and submission of monthly report.
 Estimating the Value for Additional Work i.e. giving the Cost Analysis for the related

SR. Incharge For MEP Services في Micro tech M & E Limited
  • نيبال
  • سبتمبر 2001 إلى مايو 2004

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Supervision and Designing Pneumatic System Fire Fighting System, Rain Water Pipes, Drainage System, Storm Water Collection System, Sanitary.
 Testing and Commissioning of main Pumps and Jockey Pumps for Sprinkler, Hydrant and Pneumatic System.
 Preparing and Submitting of As Built Drawings and Operation Manual for Client, bill of quantities, progress report, Final close out documents
 Dealing with Consultant with all respects.

Project Incharge ( Plumbing& Fire Fighting) في Hitachi Plant- Binapuri Consortium
  • نيبال
  • سبتمبر 1997 إلى سبتمبر 2001

 Plan and monitor the construction progress, and provide periodic progress report
 Liaise with clients at each stage of the work to ensure proper compliance with all technical aspects of the contract
 Review all engineering design drawings of the project before passing them for implementation
 To monitor all discipline and to coordinate with civil with all respect.
 Assisting for procurement and commercial issues
 Supervision and Designing Pneumatic System , Fire Fighting System, Rain Water Pipes, Drainage System, Storm Water Collection System, Sanitary, Boiler System, Swimming Pool and Filtration Management and System corresponding with the Dosing System, LPG (Liquid Petroleum Gas) System
 Testing and Commissioning of main Pumps and Jockey Pumps for Sprinkler, Hydrant and Pneumatic System.
 Preparing and Submitting of As Built Drawings and Operation Manual for Client, bill of quantities, progress report, Final close out documents
 Dealing with Consultant with all respect.

الخلفية التعليمية

ماجستير, Hydro–Technical construction
  • في State Academy of water Management.
  • يوليو 1997

Award with red diploma and get offer to continue for Phd.

Specialties & Skills

Leadership
Decision Making Skills
Ms word ,excell
Coordination

اللغات

الانجليزية
متمرّس
الهندية
متوسط
الروسية
متمرّس
الأوكرانية
متوسط

العضويات

- Member of Nepal Engineering Council – Kathmandu ,Nepal
  • membership only
  • December 1998
Member of Nepal Engineering Association
  • membership only
  • January 2000