Work Experience

Total years of experience :17 years, 4 Months

Control Systems Engineer at Wood PLC
  • United Arab Emirates
  • My current job since October 2017

Design Modifications, Pre-Commissioning & Commissioning

at Honeywell
  • United Arab Emirates
  • My current job since October 2017

The Al Taweelah Alumina Refinery is a 2.0 Mtpa alumina refinery for Emirates Global
Aluminium (EGA - the Owners). Engineering and construction shall be performed by Bechtel

Control Systems Engineer at Honeywell
  • India
  • June 2017 to October 2017
Engineer at  Rockwell Redundant ControlLogic PLC’s  Four Wireless field instruments * Honeywell
  • India
  • June 2017 to October 2017

my role was to FAT the Experion
C300 Software controls and sequences for the Hydrate Facilities:
 PGL/SPL Heat Interchange
 Precipitation
 Hydrate Classification
 Hydrate Preparation
 Product Washing
 Caustic Supply & Cleaning

at M
  • Saudi Arabia
  • January 2014 to July 2014
Project at Honeywell
  • Saudi Arabia
  • January 2014 to July 2014

The Ma’aden Alumina Refinery comprises a 2 train Greenfield Plant, utilizing the Bayer
Process to produce 1.8 Mtpa of alumina. The plant is expandable to 3.6 Mtpa.
Major responsibilities: As the Lead PCS Commissioning Engineer my role was responsible for
up to 20 Honeywell Commissioning Engineers to complete loop testing, troubleshooting,
functional testing, commissioning and startup of the plant for all refinery areas. This also
involved, ensuring the correct procedures were followed, safety procedures observed,
Management of change forms completed, implementing changes and “As Building” the handed
over documentation to achieve a control system to meet the final requirements of the Ma’aden
Alumina Refinery.
The Honeywell Experion R400 architecture of the Ma’aden Process Control System (PCS)
evolved during the design process and consists off,
 Five (5) Honeywell Experion Communities and five (5) Redundant Servers
 Five (5) CCR Consoles
 Four (4) Field Workstations
 Eight (8) Operator Field Kiosks
 21 Technicians workstations
 48 Experion C300 Redundant Controllers
 8 Safety Managers

Control Systems Engineer at Honeywell
  • India
  • July 2013 to December 2013

Factory Acceptance Pre-Testing
Ma’aden Alumina Project.

Project at  125 One Wireless field instruments
  • India
  • July 2013 to December 2013

s
 Digital Video Management System to 20 Field Cameras
* Honeywell -

Operator at Honeywell Europe – Pearl GTL Project (Shell) – Gas To Liquids
  • Qatar
  • November 2009 to July 2012

The Pearl GTL Project consists of two offshore platforms, associated wells and two pipelines
feeding a two-train Gas to Liquids (GTL) plant located within Ras Laffan Industrial City
(RLIC). The plant produces approximately 140, 000 bbl per day of liquid synthetic products
from natural gas when both phase 1 and 2 are in full production.
Due to the size and structure of the Pearl GTL plant, four Honeywell Experion Enterprises are
configured, corresponding to each main Operational/Plant Area; Utilities, Feed Gas Preparation,
Gas to Liquid and Liquid Processing Units. Under control of the four enterprise models are a
total of 10 Experion Communities, each consisting of Servers,

Process Control Engineer at Honeywell Australia - Caltex Lytton Oil & Gas Refinery – Diesel Hydrotreater No
  • United Arab Emirates
  • December 2006 to October 2009

2012. Provided one to one training for operators and process control engineers on loop
and trip operation, process, tuning, MOC Impact Analysis and authorization and
implementation for plant improvement and to analyse/fix server/console issues and
report to Honeywell maintenance team for follow up.

at Honeywell/Santos – Ballera Gas Fields
  • United Arab Emirates
  • September 2006 to November 2006

DCS design, programming and commissioning of the EPIC Pipeline
Interconnect Project. This includes developing the Honeywell DCS TPS control strategy from
Aker Kvaerner supplied DCS functional specification and P&ID’s. Building EB files for
loading into the HPM Test Box, preparing FAT and SAT test documents, prior to FAT testing
in office for client witness, followed by commissioning on site.

at CURRICULUM VITAE
  • Australia
  • August 1999 to December 2002

Education

Bachelor's degree, Electrical & Electronic Engineering
  • at he University of Southern Queenslandthe Capricorn Institute of TechnologyQueensland Institute of Technology
  • January 1981
Bachelor's degree, Electrical & Electronic Engineering
  • at he University of Southern Queenslandthe Capricorn Institute of TechnologyQueensland Institute of Technology
  • January 1981

courses: Completed apprenticeship as an Electrical Fitter/Mechanic. 1976- 1980(June). Certificate of competency number C9132.

Bachelor's degree, Electrical & Electronic Engineering
  • at he University of Southern Queenslandthe Capricorn Institute of TechnologyQueensland Institute of Technology
  • January 1981

courses: Completed apprenticeship as an Electrical Fitter/Mechanic. 1976- 1980(June). Certificate of competency number C9132.

Specialties & Skills

CUSTOMER RELATIONS
ENGINEERING
FUNCTIONAL
MICROSOFT OFFICE
SPECIFICATION

Languages

English
Native Speaker