Associate Architect
JACOBS, Halcrow International Partnership
Total years of experience :19 years, 7 Months
Responsibilities:
• Managing the design process through all project phases.
• Using BIM/CAD software to produce highly detailed Conceptual Design and Design documentation ensuring the drawings and designs are completed on time and adhered to the established specifications and standards.
• Actively involved in design solutions, production, and review/comment of schematics, drawings, material schedules, and 3D presentations.
• Constantly monitoring and enhancing the quality of the documentation and presentations.
• Attending regular meetings and liaising with Clients and Consultants.
Projects:
• DHE (DUBAI HILLS ESTATE) RESIDENTIAL BUILDING - EAGLEWING - AVANTIME
Residential apartments building, 210 units.
G+12 - GFA: 22, 000 sqm / BUA: 40, 000 sqm.
Managing the design process for the new development.
• JVT RESIDENTIAL TOWER - DANUBE PROPERTIES, Residential apartments building, 800 units.
G+65 - GFA: 55, 000 sqm / BUA: 100, 000 sqm.
Managing the design process for the new development.
• CITY OF ARABIA MASTERPLAN - RESIDENTIAL TOWER & VILLAS - DANUBE PROPERTIES,
Residential apartments building, 1, 450 units, Villas & Townhouses, 200 units.
G+99 - GFA: 150, 000 sqm / BUA: 265, 000 sqm.
Managing the design process for the new development.
• CITY OF ARABIA - RESIDENTIAL TOWERS - DANUBE PROPERTIES,
Two Residential apartments buildings, 750 units, G+46 & G+26 - GFA: 55, 000 sqm / BUA: 100, 000 sqm.
Managing the design process for the new development.
• JVT RESIDENTIAL BUILDING - ELLINGTON PROPERTIES, Residential apartments building, 68 units.
G+6 - GFA: 7, 000 sqm / BUA: 11, 000 sqm.
Managing the design process for the new development
• JVT RESIDENTIAL BUILDING - ELLINGTON PROPERTIES, Residential apartments building, 61 units.
G+9 - GFA: 6, 500 sqm / BUA: 11, 000 sqm.
Managing the design process for the new development
Projects & Responsibilities:
• HOTEL REVIER, Business Bay, Dubai, 4* Swiss Hotel Brand with 230 keys, G+18,
GFA: 12, 000 sqm / BUA: 20, 000 sqm.
Managing the site supervision works during the construction.
• SWISS TOWERS, DUBAI, Residential & Service apartments buildings, 300 units,
G+29 & G+18 - GFA: 40, 000 sqm / BUA: 65, 000 sqm.
Managing the design process for the new development.
Responsibilities:
• Managing the design process through all project phases.
• Using BIM/CAD software to produce high detailed Conceptual Design and Design documentation ensuring the drawings and designs are completed on time and adhered to the established specifications and standards.
• Actively involved in design solutions, production and review/comment of schematics, drawings, material schedules, and 3D presentations.
• Constantly monitoring and enhancing the quality of the documentation and presentations.
• Attending regular meetings and liaising with Client and Consultants.
• Reporting to Project Director
Projects:
DUBAI CREEK HARBOUR-EMAAR, CD STAGE
Two luxury residential towers in the heart of the new EMAAR Dubai Creek Harbour Development. More than 370 luxurious units which offer exceptional views of the Dubai Creek waterfront, Burj Khalifa, Dubai Creek Tower, and Ras Al Khor wildlife sanctuary.
GFA: 45, 000 sqm / BUA: 70, 000 sqm
HOLIDAY INN Hotel / Residences, Business Bay, Dubai - DD STAGE
Two separate towers G+29,
GFA: 60, 000 sqm / BUA: 100, 000 sqm.
Holiday Inn Hotel: 4* with 310 keys
Residences: 320 Units
HOLIDAY INN HOTEL & Residences and HILTON GARDEN INN & Embassy, Business Bay, Dubai - DD STAGE
Holiday Inn Hotel & Residences: 4* Hotel with 280 keys, Residences: 120 Units
2B+G+30, GFA: 30, 000 sqm / BUA: 50, 000 sqm
Hilton Garden Inn : 4* Hotel with 234 keys & Embassy Suites: 5* Hotel with 104 keys
2B+G+30, GFA: 30, 000 sqm / BUA: 46, 000 sqm
HOTEL REVIER, Business Bay, Dubai, CD-Tender STAGE, Site Supervision
4* Swiss Hotel Brand with 230 keys, G+18.
GFA: 12, 000 sqm / BUA: 20, 000 sqm
DUBAI EYE, THE AIN DUBAI PLAZA ENHANCEMENT (BLUEWATERS) - MERAAS/NORTH 25, CD-DD STAGE
Plaza Enhancement for the Bluewaters Island which connects the Ain Dubai Terminal and the Wharf Retail.
GFA: 20, 000 sqm
PRIVATE VILLA, Dubai Hills Estate - DD/Tender Stage, Site Supervision
B+GF+1, GFA: 3, 000 sqm / BUA: 4, 000 sqm
Coordination with project team, organize clients, cooperation with other designers in all phases of projects.
Monitoring design and fit-out works on site. Prticipation in selection of used materials, equipment, furniture.
Construction and reconstruction of military industrial facilities in People’s Democratic Republic of Algeria.
Designing, construction works execution, reconstruction and recovery
Coordination with project team, organize clients, cooperation with other designers in all phases of projects.
Monitoring design and fit-out works on site. Prticipation in selection of used materials, equipment, furniture.
Working on architectural & structural design, interior designs (designing, coordination
with other designers, contractors and furniture manufacturers), urban design, obtaining
of technical documentation, a member of tender committee - interior furnishing.
Working on architectural & structural design, interior designs (designing, interior designing and furnishing, coordination with contractors and furniture manufacturers).
Graduated engineer of architecture. University degree obtained at Belgrade University - Faculty of Architecture (2003), Title obtained : Master of Science in Architectural Engineering (MSc degree) Passed professional examination for obtaining degree of Master of Science in Architectural engineering (2008) License for Responsible Design Engineer of Architectural Projects, Space Planning and plumbing systems (300 I689 10). License is issued by Serbian Chamber of Engineers, which is a member of the European Council of Engineers Chambers