Sr. Project Engineer T&C- PMP® LEED® Green Associated™
Consolidated Contractors International Company
Total years of experience :18 years, 10 Months
Working in Riyadh Metro Project
Royal Commission for Riyadh City
Provide technical leadership to manage 120 workers including engineers and sub-contractors in accomplishing assigned scope. Support the management to assign, perform, oversee, and schedule work tasks to meet cost objectives. Oversee project execution, installation, testing and commissioning. Monitor and ensure following Testing & Commissioning SOPs reflect the current methodologies through field modification. Maintain properly adjusted and calibrated tools/instruments in the Field. Provide optimised engineering solution to meet clients and end user requirements. Control costs and prepare detailed progress report. Ensure presence of supply of testing and commissioning material/equipment at site.
• Increased efficiency of photovoltaic system located at Building’s roof by 2% through re-distribute and re-arrange PV panels arrays taking into consideration Roof equipment’s and building shadows.
• Measured soil resistivity and re-designed earthing connection attached to building’s embedded earthing structure to reduce the stray current effect that raised efficiency of project external earthing network - grid network.
• Supported the development and improvement of field methods employed to improve efficiency/accuracy of the testing and commissioning processes.
• Followed-up with procurement until finalization of requested PO/items while reporting any delay to the line manager.
• Implemented and enforced compliance with quality assurance objectives in the Field.
Wasit Gas Plant Project - 2014
Client: ARAMCO/ Main Contractor: SK Led 20 workers of calibration shop and field troubleshooting and 70+ workers including engineers for site execution. Executed and supervised site activities including DCS/ESD system installation, field control devices connection, valves setting up as well as air compressor connection to pneumatic and air valves. Interacted with client to coordinate the progress of work. Implemented activities as per project specification/requirement and QS/HSE policies.
• Reduced calibration time-consuming for ~10K instruments by executing process to follow by professional technicians, along with instrument/valve distribution based on calibration setting/available measuring tools.
• Conducted 100% function test for more than 150 control systems.
• Directed site logistics and material controlling.
Ras Al khair Power Plant Project - 2013
Client: SALINE WATER CONVERSION CORPORATION/ Main Contractor: SEPCOIII
Acted as E&I construction manager and company representative for the given assignments including scope estimation, planning and cost controlling. Led client negotiation and provided coordination. Developed and improved project plan and milestone date of construction activities. Evaluated performance measures and completed work logs, while tracking work requests. Ensured proper construction compliance with project documentations and client standards.
• Won a $2M contract through changing order and new scope/task.
• Claimed more than $1.5M of the additional work and change orders; built claims based on consumed manhours per trade in addition to logistics, equipment, and consumed material/BOQ.
• Followed project quality standards as well as implemented various stages of workflow using quality tools.
Princess Nora Bint Abdulrahman University Project -2010 (LEED BD+C)
Client: Ministry of Finance - KSA/ Consultant: Dar Al-Handasah
Managed, designed, and installed instrumentation/electrical capital projects. Coordinated electrical and instrumentation design needs of site production units, specification of control systems, and required equipment. Oversaw design of instrument loops and electrical schematics, updating electrical one-line diagrams, and supervising project start-ups.
• Installed and Built more than 3000 meter of cable tray.
• Spearheaded low current system (patch panel, PA/GA, CCTV, master clock, telephone, and network distribution), Fire alarm system and cable management.
• Led testing and system pre-commissioning, final handover with shop drawing and as built review/submission.
• Pulled and connect more than 150K of control and power cables.
Khursaniyah Producing Facilities Project - 2007
Client: ARAMCO/ Main Contractor: Snamprogetti
• Responsibilities:
o Organizing, analyzing, and build a plane for job activities
o Site supervision, monitor for and problem solving
o UPS System installation, connection and pre-commission
o Telecommunication System installation (switches, servers, patch panel and it’s connectivity)
o Fire & Gas System installation and commissioning
o PA/GA System installation and commissioning
o Fiber Optic network (SM & MM cable) installation, splicing and testing (OTDR)
o Installation of Processes Control System (panels, Cable installation and termination)
o Instrument loop testing, functional logic test and commissioning of analog/digital instruments:
Field Bus technology
Highway addressable remote transducers HART technology
o Solenoid Valves, Motor Valve and Air Valve configuration, testing and troubleshooting
• Achievement:
Design and produce more than 2000 instrument loop diagram (ILD) based on system configuration, data sheet and connection.
• PSD’s Recorders project: at whole Saudi region based on PC Hardware installation & maintenance. Software installation, configuration &troubleshooting• Civil Defense HF Project as a Trainer/Technical Engineer on Barrett 2050HF SSB Transceiver covering radio operation, programming, ALE operation, antenna theory and base/ vehicle installation• Border Guard Tetra project in Qurayat (based on TETRA Digital Trunking System Rohill equipment, Microwave link & Spura terminals.) System maintenance & troubleshooting• Civil Defense Radio project in Riyadh (based on ZETRON System4000series, MIII Repeaters) Process Control System installation (panels, cable termination & card configuration), interconnection between telephone lines and System, interconnection between radio repeaters and System. ASC recorder installation & configuration, consoles PC’s installation and configuration. LAN installation• BAYANAT Project (based on wireless network technology, FSO) Transmitter& Receiver installation, configuration & troubleshooting.