Nigel Ancill, Project Manager

Nigel Ancill

Project Manager

AIM

Location
Thailand - Pattaya
Education
High school or equivalent,
Experience
28 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 7 Months

Project Manager at AIM
  • India
  • June 2019 to October 2020
Construction Manager at AIM
  • India
  • February 2005 to August 2019

America
Indochina
Management)
AIM is an American owned, materials supply company based in Vietnam.
For a few years now, AIM have found that for certain products, if the company does
not install these themselves, the installation can be shoddy and thus a bad name for
the product.
The projects I have been involved in have been in Hanoi, Saigon, Hoi Anh, Con Doi.
The products for these projects being; raised flooring, timber sports flooring,
suspended ceilings, Vinyl Flooring, high quality glazed partitions, toilet partitions
and a compactor shelving system.
For Raised & Vinyl Flooring projects, I have had total management of the following
projects, including, quantities calculations, quality control, overseeing the
supervision of the installation, logistics and liaison with the clients:
Crescent Mall, Ho Chi Minh City - 26, 100 m2, Raised Flooring & Acoustic
Ceiling April 2019 - 6 months, 25 staff
Friendship Towers, Ho Chi Minh City - 13, 150 m2, Raised Flooring & Acoustic
Ceiling

Manager
  • October 2014 to February 2019

Vattanac Tower My role was Head of department for all
civil contractors & contracts ensuring all
work is completed to specification and
client approval for main building works
Oversea Factory inspection tests for
selection and approval of wall tiling and
floor tiling for retail mall.
Completion of water seal testing and
remedial works for full development of the
Façade. This was achieved through the
management and coordination of several
sub-contractors; cladding and façade
fitters, abseil testing/inspection team and
building maintenance unit.
Full completion of all levels to be handed
over to the Building Management, for the
availability for new Tennent's and
Rosewood Hotel
Page - 3
Vattanac
Lifestyle Project
My role on this project was QAQC / Site
Manager: To cordinate with the main
contractor and ensure that correct methods,
procedures are implemented & materials
used are to the acceptable standards
required for all works relatied to the
project, this included :
Pilling works
Diaphram Wall construction
Deep Ecavation
Steel Strutting & shoring
Monitoring works
Rosewood Hotel As Construction

Civil Construction Manager at PPI International
  • October 2013 to October 2014

Camp
Lemonier is a
United States
Naval
Expeditionary
Base
3 Story Living accommodations CLU's for comfortable living for NAVFAC
Layout -Increase People Housed per CLU -
Reduce Cubic Feet of Conditioned Air -
Enhance Individual Space (Individual Berthing Spaces)
Air Conditioning -Type -
Distribution
Insulation Material (Walls, Floor,
and Ceiling)
Rigid Building Material
Building Component Connections -
No Heat Loss
Coatings /Interior Design
Improvement

Projects Manager at Infrastructure Improvements
  • Great Britain (UK)
  • January 1990 to February 1993

Education

High school or equivalent,
  • December 2020

Excavator below 10 tonne. • Forklift Truck. • Hiab and Lorry Loader. • Industrial Counter Balance Forklift Truck. • JCB 180 - 360. • Manual Handling. • Safe Use of Abrasive Wheels. • Site Based Method statements and Risk Assessment. • Street Works.

Specialties & Skills

MICROSOFT WORKS
CUSTOMER RELATIONS
MATERIALS MANAGEMENT
QUALITY
ENGINEERING
GOVERNMENT
MEETING FACILITATION
SPECIFICATION

Languages

English
Expert