مجموع سنوات الخبرة: 13 سنوات, 9 أشهر
أكتوبر 2015
إلى أبريل 2016
Project Manager
في DSK
البلد :
اليونان
Expansion of an existing 5* Hotel, Project Budget: 3.000.000 €
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
نوفمبر 2014
إلى مايو 2015
Project Manager
في DSK
البلد :
اليونان
Renovation of a 4* Hotel, Project Budget: 2.000.000 €
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
يناير 2015
إلى أبريل 2015
Project Manager
في Self Employed
البلد :
اليونان
New-Built Junction inside an existing 4* hotel, Project Budget: 780.000 €
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
Duties:
Totally involved in the procurement procedure of the project ( construction costs, rides costs, utilities costs etc.)
Initial design and conception of the project
Supervision of a complete construction of a large scale Water Park,
Supervising and coordinating construction team,
Keeping daily records,
Controlling daily progress of the construction and solving various problems that appeared during the construction.
Production of measurements tables and cost tables for final payments.
Setting out of buildings and structures,
Comply with H&S regulations,
Design and checking all final construction drawings and details,
Representing the company in meetings with client and architects. .
Choosing sub-contractors,
Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
• Completion and final handover of project.
يونيو 2013
إلى مايو 2014
Project Manager
في D.S.K.
البلد :
اليونان
Construction of a very large Water Park inside an existing luxury resort.
يونيو 2013
إلى مارس 2014
Project Manager
في DSK
البلد :
اليونان
Construction of a 4.000.000 euros new built water park.
نوفمبر 2012
إلى مايو 2013
Project Manager
في DSK
البلد :
اليونان
Renovation of an existing 4 star luxury hotel complex.
مايو 2012
إلى أكتوبر 2012
Engineering Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
01/05/2012-30/10/2012: Position: Engineering Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Several structural designs
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Several structural designs
أبريل 2012
إلى أكتوبر 2012
Construction Manager
في DSK Dimitris Sifonios technical office
البلد :
اليونان
10/01/2012-30/04/2012: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Water Park, Kipriotis Village (5 stars hotel), Project Budget: 5.000.000 €
Location: Kos Island, Greece
Duties: * Supervision of a large water park of an existing hotel,
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Water Park, Kipriotis Village (5 stars hotel), Project Budget: 5.000.000 €
Location: Kos Island, Greece
Duties: * Supervision of a large water park of an existing hotel,
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
سبتمبر 2011
إلى ديسمبر 2011
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
15/09/2011-17/12/2011: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Construction of two large commercial warehouses, Budget: 1.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of two large steel commercial ware houses
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Construction of two large commercial warehouses, Budget: 1.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of two large steel commercial ware houses
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
مايو 2011
إلى أكتوبر 2011
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
10/01/2011-12/05/2011: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Porto Bello Hotel (4 stars hotel), Project Budget: 2.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of a medium expansion of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Porto Bello Hotel (4 stars hotel), Project Budget: 2.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of a medium expansion of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
أكتوبر 2010
إلى مايو 2011
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
16/10/2010-18/05/11: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Oceanis Resort and Spa (4 stars hotel), Project Budget: 25.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of renovation of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Oceanis Resort and Spa (4 stars hotel), Project Budget: 25.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of renovation of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
يناير 2010
إلى يناير 2011
Designer
في Blue Lagoon Village
البلد :
اليونان
• Blue Lagoon Village, 5 stars (2010-2011) (Kos-Greece)
يونيو 2010
إلى أكتوبر 2010
Structural Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
01/06/2010-15/10/2010: Position: Structural Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: supervision of three design engineers for the design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels), Planning of the construction of various new projects. Value engineering,
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: supervision of three design engineers for the design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels), Planning of the construction of various new projects. Value engineering,
سبتمبر 2009
إلى مايو 2010
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
30/09/2009-30/05/2010: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Blue Lagoon Resort (5 stars hotel), Project Budget: 11.790.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of expansion of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Blue Lagoon Resort (5 stars hotel), Project Budget: 11.790.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of expansion of an existing hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans
يونيو 2008
إلى يوليو 2009
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
04/06/2008-15/07/2009: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Diamond Deluxe Hotel and Spa (5 stars hotel), Project Budget: 22.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of a new built hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Diamond Deluxe Hotel and Spa (5 stars hotel), Project Budget: 22.000.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of a new built hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
يوليو 2007
إلى يونيو 2008
Construction Manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
16/07/2007-03/06/2008: Position: Construction Manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Palazzo del Mare Hotel (5 stars Hotel), Project Budget: 16.920.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of a new built luxury hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Palazzo del Mare Hotel (5 stars Hotel), Project Budget: 16.920.000 €
Location: Kos Island, Greece
Duties: * Design and supervision of construction of a new built luxury hotel
* Supervising and coordinating construction team,
* Keeping daily records,
* Controlling daily progress of the construction and solving various problems that appeared during the construction.
* Production of measurements tables and cost tables for final payments.
* Setting out of buildings,
* Comply with H&S regulations,
* Design and checking all final construction drawings and details,
* Representing the company in meetings with client and architects.
* Choosing sub-contractors,
* Pre-construction production of time schedule
• Developing a cost-effective plan and schedule for completion of projects following a logical pattern for utilization of resources.
• Selecting and coordinating work of subcontractors working on various phases of the project.
• Overseeing performance of all trade contractors and reviewing architectural and engineering drawings to make sure that all specifications and regulations are being followed.
• Responsible for proper administration of construction contracts and for obtaining all necessary permits and licenses.
• Supervising assistants, reviewing their reports, checking on any reported difficulties, and correcting any safety violations or other reported deficiencies.
• Tracking and controlling construction schedules and associated costs to achieve completion of project within time and monies allocated.
• Reporting to owners and architects about progress and any necessary modifications of plans.
يونيو 2007
إلى يوليو 2007
Structural Engineer
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
21/06/2007-15/07/2007: Position: Structural Engineer
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: Design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels)
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: Design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels)
أبريل 2005
إلى يونيو 2007
Construction Engineer-Site manager
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
11/04/2005-20/06/2007: Position: Construction Engineer-Site manager
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Renovation of Caravia Beach Hotel (4 star Hotel), Project Budget: 24.460.000 €
Location: Kos island, Greece
Duties: * Design and supervision of the renovation
* Supervising and coordinating construction team
* Keeping daily records
* Checking daily progress of the construction work and solving various problems that appeared during the construction
* Production of measurement tables and cost tables for final payments
* Setting out of buildings
* Comply with H&S regulations
* Design and checking all final construction drawings and details.
Company: DSK Dimitris Sifonios technical office, Kos Island
Project: Renovation of Caravia Beach Hotel (4 star Hotel), Project Budget: 24.460.000 €
Location: Kos island, Greece
Duties: * Design and supervision of the renovation
* Supervising and coordinating construction team
* Keeping daily records
* Checking daily progress of the construction work and solving various problems that appeared during the construction
* Production of measurement tables and cost tables for final payments
* Setting out of buildings
* Comply with H&S regulations
* Design and checking all final construction drawings and details.
فبراير 2005
إلى أبريل 2005
Civil Engineer
في DSK Dimitris Sifonios technical office, Kos Island
البلد :
اليونان
14/02/2005-10/04/2005: Position: Civil Engineer
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: Design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels)
Company: DSK Dimitris Sifonios technical office, Kos Island
Duties: Design of detail structural and architectural drawings for multistory R/C buildings (commercial, residential, offices, hotels)
أبريل 2004
إلى يناير 2005
Civil Engineer
في Kostas Dimitris, Athens
البلد :
اليونان
20/04/2004-20/01/2005: Position: Civil Engineer
Company: Kostas Dimitris, Athens
Duties: Supervision of retrofit and maintenance works in various commercial and army buildings in Athens district
Company: Kostas Dimitris, Athens
Duties: Supervision of retrofit and maintenance works in various commercial and army buildings in Athens district
يونيو 2003
إلى أغسطس 2003
Trainee Civil Engineer
في Komiotis George
البلد :
اليونان
15/06/2003- 30/08/2003: Position: Trainee Civil Engineer
Company: MSc Komiotis George, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings, on site visits for QA/QC issues
Company: MSc Komiotis George, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings, on site visits for QA/QC issues
يونيو 2002
إلى أغسطس 2002
Trainee Civil Engineer
في Komiotis George
البلد :
اليونان
15/06/2002- 30/08/2002: Position: Trainee Civil Engineer
Company: MSc Komiotis George, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings, on site visits for QA/QC issues
Company: MSc Komiotis George, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings, on site visits for QA/QC issues
يونيو 2000
إلى أغسطس 2000
Trainee Civil Engineer
في Dr. Liveris Stamatis, Zakynthos
البلد :
اليونان
15/06/2000 - 30/08/2000: Position: Trainee Civil Engineer
Company: Dr. Liveris Stamatis, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings
During my time at DSK company I was also involved in the structural design and analysis, value engineering, pre-construction time scheduling, procurent engineering and dealing with subcontractors, of the following projects: • Michelangelo Hotel, 5 stars (2009) (Kos-Greece)
• Xenia Village, 5 stars (2010) (Patmos-Greece)
Company: Dr. Liveris Stamatis, Zakynthos
Duties: Design of detail structural and architectural drawings for R/C residential buildings
During my time at DSK company I was also involved in the structural design and analysis, value engineering, pre-construction time scheduling, procurent engineering and dealing with subcontractors, of the following projects: • Michelangelo Hotel, 5 stars (2009) (Kos-Greece)
• Xenia Village, 5 stars (2010) (Patmos-Greece)
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني