Transformer Quality And Testing Engineer
Legrand
مجموع سنوات الخبرة :13 years, 5 أشهر
• INPROCESS TESTING OF TRANSFORMER AS PER MENTIONED IN IS/IEC
• FINAL ROUTINE TESTING OF TRANSFORMER AS PER MENTIONEDIN IS/IEC
• HANDLING CUSTOMER INSPECTION
• PREPARATION OF TEST REPORT
• FINAL DOCUMENTS PREPARATION TO BE SENT TO CUSTOMER
• SOLVE PROBLEMS RELATED TO TRANSFORMER AND SWITCHGEARS
• CALIBRATION OF TEST EQUIPMENTS AND INSTRUMENTS
• ISO 9001 : 2015 CERTIFICATION
• QUALITY CHECK ON INCOMING RAW MATERIAL AND AT VENDOR END
• TO DO INTERNAL AUDIT
• HANDLING OF MANPOWER
• TO PREPARE DAILY WORK DONE REPORT
• UPDATE MONTHLY FAULT ANALYSIS
• SOLVE PROBLEMS AT CUSTOMER SITE
• UPDATE QUALITY CHECK LIST
• TESTING OF REACTORS AND CSS
• QUALITY CHECK ON TRANSFORMERS AT INPROCESS AND FINAL STAGE
• VENDOR VISIT FOR QC INSPECTION
• ISO 9001 : 2015 UPADATION FOR DOCUMENTATION
• GIVE FEEDBACK TO VARIUOS DEPT FOR QUALITY IMPROVEMENT
• FAULT FINDING AND SOLVING ANALYSIS
• INPROCESS TESTING OF TRANSFORMER AS PER MENTIONED IN IS/IEC
• FINAL ROUTINE TESTING OF TRANSFORMER AS PER MENTIONEDIN IS/IEC
• HANDLING CUSTOMER INSPECTION
• PREPARATION OF TEST REPORT
• FINAL DOCUMENTS PREPARATION TO BE SENT TO CUSTOMER
• SOLVE PROBLEMS RELATED TO TRANSFORMER AND SWITCHGEARS
• CALIBRATION OF TEST EQUIPMENTS AND INSTRUMENTS
• ISO 9001 : 2015 CERTIFICATION
• QUALITY CHECK ON INCOMING RAW MATERIAL AND AT VENDOR END
• TO DO INTERNAL AUDIT
• HANDLING OF MANPOWER
• TO PREPARE DAILY WORK DONE REPORT
• UPDATE MONTHLY FAULT ANALYSIS
• SOLVE PROBLEMS AT CUSTOMER SITE
• UPDATE QUALITY CHECK LIST
• TESTING OF REACTORS AND CSS
• QUALITY CHECK ON TRANSFORMERS AT IN PROCESS AND FINAL STAGE
• VENDOR VISIT FOR QC INSPECTION
• ISO 9001 : 2015 UPDATION FOR DOCUMENTATION
• GIVE FEEDBACK TO VARIOUS DEPT FOR QUALITY IMPROVEMENT
• FAULT FINDING AND SOLVING ANALYSIS