Nima Shoja, Principal Architect

Nima Shoja

Principal Architect

WS Atkins

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم, Management & Leadership
الخبرات
24 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 2 أشهر

Principal Architect في WS Atkins
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ نوفمبر 2016

Route 2020 Dubai Metro, Dubai, UAE - Value: AED 10.6bn
EPC contract on the 15-kilometer extension of the Dubai Metro’s Red Line from Nakheel Harbour and Tower Station to the Expo 2020 site. Nima is leading Line Wide Identity team to keep all the stations across the whole line in a same principle and language. It’s a challenging role to keep all 7 stations in 4 different prototypes align to each other with same virtual language in a tight schedule and intensive workload.

Principal Architect في Atkins
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أبريل 2017

Katara Phase IV, Doha, Qatar

Katara Phase VI is the last part of a vast cultural master plan developed by the Qatari Government to foster culture-based tourism in its capital, Doha. Katara Phase VI is a mixed-use programme which includes mosque, residential, retail and hospitality, in addition to a public square, promenade and other leisure facilities. Nima is leading the residential design team and in charge of coordination with other discipline \[Structure, MEP, Landscape\] and advising on changes, possible concept solutions and documentation.

Principle Architect في Atkins Ltd.
  • قطر - الدوحة
  • يناير 2016 إلى نوفمبر 2016

Nima moved to Doha and India to manage the multi-disciplinary design changes team of 7 I-Type and 3 X-type stations for coordination and integration of Rail Contractor and Branding Architects requirements along with buildability and construction solutions. He was the interface coordinator between different external and internal parties and global offices such as UK, India, Hong Kong and Qatar.

Principal Architect في Atkins Ltd.
  • المملكة المتحدة - غلاسكو
  • يناير 2015 إلى يناير 2016

Nima was involved in the Gold Line Underground Metro Project in Doha, Qatar. Nima was Design team lead for the 2 Doha Gold Line I-Stations.

Senior Architect في Zaha Hadid Architects
  • المملكة المتحدة - لندن
  • يونيو 2013 إلى يناير 2015

Nima has been involved intensively on the King Abdolah Financial District Metro Station, Saudi Arabia from the schematic design stage to coordinating information for the construction stage in ZHA. He has also worked on various stages of the Unilever Headquarters, Indonesia and the Macau Melco Crown, China and Jeddah Municipality Transport Planning, Saudi Arabia.

Senior Designer في Q Architectural Design Consultant
  • المملكة المتحدة - لندن
  • يناير 2011 إلى يونيو 2013

During these years, Nima has been involved with enormous amount of residential buildings, mostly high end detached and semi-detached buildings in London in all aspects of design and construction.

Architectural Department Manager في Gueno consulting engineers
  • إيران
  • مارس 1999 إلى ديسمبر 2009

Nima Has been involved in many residential and multi-use projects along with Tehran and Shiraz metro stations.

الخلفية التعليمية

دبلوم, Management & Leadership
  • في Iranian Management & Leadership centre
  • أغسطس 2008
ماجستير, Architecture
  • في Islamic Azad University Central Tehran Branch
  • يونيو 2002

Specialties & Skills

اللغات

الانجليزية
متمرّس
الفارسية
اللغة الأم
العربية
مبتدئ