Work Experience

Total years of experience :10 years, 4 Months

Lead Mechanical Engineer at China Railway 18th Bureau Group Co. Ltd.
  • Saudi Arabia - Abqaiq
  • August 2020 to September 2021

Designing of external utilities like Sewer system, Storm water, Potable water and Firefighting line. Preparation of shop drawing for internal building plumbing works in Fire station, Health clinic, Musalla, Auditorium and Administration.

Mechanical Quality Control Engineer at Rawafid Industrial
  • India
  • April 2020 to July 2020

For West Coast Desalination Plants Project, Saudi Arabia

• Review the welding procedure specification and get the approval from client or employer.
• Review all the applicable documents such as procedure, inspection test plan (ITP) etc. are approved.
• Responsible for raw material inspection like pipes, fittings, mechanical equipment’s etc. and compare with certificate.
• Review all drawings are approved and are of latest revision.
• Monitoring and review the calibration certificate of equipment’s such as welding machine, electrode ovens, Gauges etc.

Senior MechanicalEngineer at China Railway 18th Bureau Group Co. Ltd
  • India
  • March 2016 to April 2020

Design & QA/QC Material’s

• Administering the execution of 23 kilometers of underground pressure lines GRP /uPVC pipes for Potable water, Process water and reclaimed water network
• Facilitating the execution of 18 kilometers of underground gravity lines GRP/uPVC for sanitary sewer and industrial waste water network.

Mechanical Engineer at General Agencies and Contracting
  • Saudi Arabia
  • January 2013 to March 2016

Construction of Roads and Utilities Land block LIP Expansion PIC I 7012

Key Result Areas:
• Administering the execution of 23 kilometers of underground pressure lines GRP /uPVC pipes for Potable
water, Process water and reclaimed water network
• Facilitating the execution of 18 kilometers of underground gravity lines GRP/uPVC for sanitary sewer and
industrial waste water network
• Conducting the installation of:
o Manual operated Butterfly valves, Gate valves and Air release valves in chambers
o GRP Manholes for sanitary and industrial waste water network
• Ensuring the preparation of invert levels, excavation details; coordinating for underground pipelines from IFC
drawing
• Preparing the material requirement details and delivery schedule based on site requirement
• Drafting the shop drawing proposal to justify the construction design deviation
• Performing the complete designing of Lifting stations, piping
• Executing mechanical works of project including budgetary control, materials management, finalization of
contracts & and terms for the materials and material approval from consultant / client
• Monitoring engineering procurement phase by reviewing contractors work
• Identifying cost effective vendors / suppliers for procurement for reducing cost while improving quality &
reliability
• Attending site progress meeting and closely tracked site progress; tracking quality at project site by exercising
rigorous quality control plan

Mechanical Engineer at Royal Commission for Jubail & Yanbu
  • Saudi Arabia
  • June 2011 to December 2012

Construction of Roads and Utilities Land block LIP Expansion PIC A 1104A

Highlights: Utilities piping and Lifting Stations
• Executed construction of:
o 12 kilometers of underground pressure lines GRP/uPVC pipes for Potable water, Process water and
Reclaimed water network
o 11 kilometers of underground gravity lines GRP/uPVC for sanitary sewer and Industrial waste water
network
• Undertook installation of:
o Manual operated Butterfly valves, Gate valves and Air release valves in chambers
o GRP Manholes for sanitary and industrial waste water network
o IWW & SS line Lift Station installations (Stainless steel 316L fittings): SS Line - 1 Nos, IWW Line- 2 Nos
o Dry Barrel Fire hydrant installations: 96 Nos.
• Prepared:
o Invert levels, Excavation details and coordinates for underground pipelines from IFC drawing
o Material requirement details and delivery schedule based on site requirement

Education

Bachelor's degree, Mechanical Engineering
  • at Anna University of Coimbatore
  • April 2011

The final year was Vibration analysis on rotating parts of a machine.

Specialties & Skills

CSWIP 3.1
Welding Inspection
Designing of utility piping
Project Execution
DELIVERY
GRAPHIC DESIGN
NETWORKING
REQUIREMENTS
UTILITIES
DRAFTING
MICROSOFT WORKS
PROCUREMENT
PROGRESS

Languages

English
Expert
Hindi
Expert

Training and Certifications

NDT Ultrasonic Testing ASNT SNT-TC-IA (Certificate)
Date Attended:
October 2011
Valid Until:
October 2026
NDT Radiography Testing ASNT SNT-TC-IA (Certificate)
Date Attended:
October 2011
Valid Until:
October 2026
NDT Penetrant Testing ASNT SNT-TC-IA (Certificate)
Date Attended:
October 2011
Valid Until:
October 2026
NDT Magnetic Particle Testing ASNT SNT-TC-IA (Certificate)
Date Attended:
October 2011
Valid Until:
October 2026
CSWIP 3.1 Welding Inspector (Certificate)
Date Attended:
December 2021
Valid Until:
December 2026