Work Experience

Total years of experience :8 years, 8 Months

Painting Inspector (On Behalf of PT.NeoGenesa International) at Linde
  • Indonesia - Jakarta
  • June 2022 to September 2023

Repainting FBST and Cold Box Equipment with Wet Blasting surface preparation method in hence of debris and other contaminants it can be captured.
• Liaise with team Scaffolding and Painting day by day what is to be considered unsafety working manner to safely work on site (working at height and windy location)
• conducting test it has been done (Dry Temp, Wet, Temp. RH, DEw Point, Steel TEmp, Cleanliness, Blotter Test, Roughness/profile/key, Wft, Dft, Conductivity Test / Salt Test, Pull off Test)
• Liasie with Rope Access team to install Logo, Powertools and painting on coldbox due to high risk job 61 meter Height
• Reporting Monthly or weekly to Deputy ops Manager Plant (Painting Report) and have agenda to mitigate the plant such as if any corrosion emerging heavy pitting, anomalies, in connection with the loss pressure of Lar, Lin and Lox FBST
• Supervise manpower to make correct working refer to the specification of the project

Painting Inspector ( On Behalf Of PT. NeoGenesa International) at PT. Pertamina Patra Niag
  • Indonesia - Bandar Lampung
  • March 2021 to June 2021

- Doing Inspection Test Blasting and Painting Activities ( Fire Extinguisher Line Pipe Facility) material includes : H Beam, U Channels, L-angel and Various Pipe Size.
- Stacking material has done production in proper manner ( prevent bi metallic pathway)
- regularly calibration of DFT and Dew point meter

Painting Inspector (On Behalf of PT.NeoGenesa International) at PT.Rekayasa Industri
  • Indonesia - Jakarta
  • July 2020 to October 2020

Jambaran Tiung Biru - Onshrore Processing Facility Blasting And Painting in Talok Workshop Facility
- Doing all activities related Logistic, Commercial, Mock Up test, Production test Painting.
- Engage with RFId System to track Properties of pipe counter part to QA/QC production process ( from Welding, Painting and Load out to Field)
- full load capacity bargaining with local community (Asking to involve in Project)

Assistant Painting Inspector (On Behalf of PT. NeoGenesa International) at MUBADALA PETROLEUM (SEBUKU)
  • Indonesia - Jakarta
  • October 2019 to October 2019

Application Lining Coating in Gas Separator Vessel using product interline 1064, Patching Method ( Severe area Condition is mandatory to be repaired ) Surface Preparation with Bristle Blaster power tools monti Germany product equivalent to Sa 2 1/2 for further sequence apply hand trowel interline Volume Solid 100 % as thickness requirement 1.200 Microns

Painting Inspector ( On behalf of PT. Sondang Artha Prima) at PERTAMINA GAS
  • Indonesia - Jakarta
  • December 2018 to August 2019

Pertagas Project Removal Bitumen as Existing Paint - Inspection Painting Test within Specification Surface Preparation Hand And Power tools Iso 8501 st 2 and St 3 required thickness 2 x 100 Microns Primer (Epoxies Surface Tolerance) and 75 Microns Finish. Pipe Crossing Bridge WJA territory includes; 1. Bitung District (K59, K58, K69, K13) 2. Tegal Gede District (K141, K133, K123, K116, K102, K101, K88, K87) 3. Mundu District (Kali Beji Bridge, Kali Pangkalan Bridge, Kali Cimanuk Bridge) 4. SKG Cilamaya Inspection and Supervise all above area mentioned with different team respectively

Insulation Inspector ( On Behalf of PT Perdana Karya Persada) at Santos Ltd
  • Indonesia - Jakarta
  • March 2018 to August 2018

Hot Insulation Pre-Fabricated for Small Bore Pipe at Maleo Producer Use MG Wire Blanket with water repellent CUI CAmpaign at OPF Grati conducting Cold and Hot Insulation replacement and Installation of window check on suspicious thin plate

Painting Inspector (On Behalf of PT.NeoGenesa International) at PT. Indo RX
  • Indonesia - Serang
  • January 2016 to January 2017

-Inspection test during production Blasting and painting of structure ( walls, beams, columns, roof and stairs ) applied by Rust Bullet / single paint product.
- for static machine shoe factory, application of floor water borne epoxy system using product FLowcrete

Painting Inspector (On Behalf of PT.NeoGenesa International) at PT Cikarang Listrindo Tbk
  • Indonesia - Cikarang
  • January 2016 to March 2016

Clarifier A Re-Painting

Assistant PFP Inspector (on Behalf of PT Gearindo Prakarsa) at PREMIER OIL NATUNA SEA B.V.
  • Indonesia - Jakarta
  • June 2015 to July 2015

Anoa Platform PFP Construction

Insulation Inspector (On behalf of PT.BAHAS Rekasatya) at Santos Ltd
  • Indonesia - Surabaya
  • April 2015 to July 2015

Onshore Processing Facility Grati
• Construction of Cold Insulation on various process pipe from chiller as result of condensing from process gas to inline metering pipe. ( Polyurethane Rigid Pipe cover)
• Constuction of Hot Insulation Pipe size 2 and 4 for Gas Engine Generator Compressor / Suction compressor from Wortel and Oyong Well caused decrease of natural gas flow

Painting Inspector ( On Behalf of PT. BinaRasano Engineering) at PT PGN LNG Indonesi
  • Indonesia - Surabaya
  • December 2014 to January 2015

CP 19 PGN Project, Pipelines 12, 5 Km (Immersed Pipe) length from Otsuka pocari sweat Kejayan Plant to Purwosari Intersection Road. Pipe OD 10.
• Check All activities ( Sa 2 1/2 and roughness not less than 65 microns and apply heat shrinkable Epoxy sleeves /HTLP 80.
• its around 1.400 joint

Painting Inspector (on Behalf of PT.NeoGenesa International) at PT. Sentra Usahatama Jay
  • Indonesia - Serang
  • February 2014 to December 2014

Repainting Maintenance Campaigns include these equipment :
• Chimney 72 meter Height
• Demin Area
• Clarifier and condensate Tank
• Water Treatment Pond using the product Rust Bullet trademark with single paint system / the revolutionary product

Insulation Inspector (On Behalf of PT.NeoGenesa International at Santos Ltd
  • Indonesia - Jakarta
  • August 2013 to September 2013

Maleo Booster Train 3 Compressor construction hot insulation on exhaust compressor

Assistant technical Operator - Commissioning Software (On Behalf of PT. Karya Energi) at Santos Ltd
  • Indonesia - Jakarta
  • April 2013 to July 2013

PM-CMS Software gives Explanation and data entry of :
• a tree tags model of equipment, component and system
• Libraries of ITR test sheets and allows these to be assigned to components of the Plant
• Linking back of scans in completed Checksheets
• Drag and drop linking of documents from the documents library to the Tags Tree model
• Auto assigning of check sheets for tags based on tag types
• Reports status, progress, work outstanding, anomalies etc
• Punch Lists tracking and management.
• Integrated XL stripper with data mapping for fast importing of Tag Data.
• Integrated bulk planning feature for setting dates for check sheets with built in progress SCurves.
• Prioritises & Orders Systems for Start Up
• Holds set-points, trips, inhibits, spades, overrides

PFP and Insulation Inspector (On Behalf of PT.NeoGenesa International) at Santos Ltd
  • Indonesia - Jakarta
  • June 2012 to September 2012

• Construction of Acoustic Insulation in Engine Room and Clinic MOPU (ceiling deck and wall partition) using product Rockwool thickness 25 mm with density 60 kg/m3 covering with glass cloth to comply with COSHH regulations.
• Hot Insulation Construction on Booster Compressor Train 3 on Maleo Producer MOPU (Mobile Offshore Producing unit Using Calcium Silicate with density 120 Kg/m3 and thickness 50 mm. Jacketing SS 304 thk 0.6 m.
• Apply Chartek-7 (Intumescent Epoxy PFP) on fire Wall the function is the worker can easily to evacuate if possible hydrocarbon fire explosion near the well

Painting Inspector (On Behalf of PT. NeoGenesa International JO PT. Eltama Prima Indo) at CNTIC- CI (China National Technical Imp. & Exp. Corporation)
  • Indonesia - Padang
  • January 2011 to February 2012

Painting of Glass Flake type on water intake Pipe OD 56 - 60. for cooling water from sea water to turbine of Coal Fired power plant 2 x 112 MW

Painting Inspector ( On Behalf of PT.NeoGenesa International) at PT. KILANG PERTAMINA BALIKPAPAN
  • Indonesia - Balikpapan
  • December 2010 to January 2011

Turn Around (TA) Project
• Check during all Activities to relative requirements ( Cleanliness Sa 3 ISO 8501 or BGAS 7079 pt A, Roughness 75 - 115 Microns, Wet film and dry film with requirement thickness 5 - 10 mm. product from Henkel ( Brushable ceramic Grey) resistance up to 1000 deg Celcius (Heat Exchanger Vessel)

PFP Inspector ( On Behalf of PT.NeoGenesa International) at PT. KALIRAYA SARI
  • Indonesia - Balikpapan
  • November 2009 to December 2009

Chevron Sphere leg Propane A And Buthane B Tank PFP Refurbishment Chartek-1709

PFP Inspector ( on Behalf of PT.NeoGenesa International) at PT. KALIRAYA SARI
  • Indonesia - Balikpapan
  • November 2008 to July 2009

Tunu Phase 12&13 A Development Project for Total Final Elf Indonesie
- Check all Activities during application, various range thicknesses from 2.55 mm to 24.5 mm ( 8 Vent LIne, Wall Cabin (Electrical room), Skid KO Drum Vessel, 12 Producing line from Well to GTS) Chartek-7 Product

PFP Inspector ( On Behalf of PT.NeoGenesa International) at PT Gunanusa Utama Fabricators
  • Indonesia - Serang
  • June 2008 to September 2008

• Tunu Phase 11 for Total Indonesie
• Inspection Test
• Various Specification H30, H60, H90, H120 JF 120

Painting Inspector ( BL and BG Well Connection modification Platform) at PT. Nippon Steel Construction Indonesi
  • Indonesia - Balikpapan
  • February 2008 to May 2008

• Conduct blotter test if any visible oil and water as per ASTM D 4285
• conduct test of Cleanliness and Roughness of Profile, key or amplitude of Blasting result referring to Specification
• Monitoring and measurement of Ambient Temperature (Dry Temp, Wet temperature, Dew Point Temp and Relative humidity) and Steel Temp before application of Painting
• Complies to Painting System Client Total Elf Indonesie - GS Cor 350
• Check Wet film thickness at which applying Paint and Dry FIlm thickness as a final result as per specification
• check any defect of painting and conduct repair
• monitor and reporting to Deputy Manager if any sequences of the jobs do not conformance as per spesification
• conduct holiday test in Mud tank if any pinholes detected and do repair / stripe coat
• reporting daily, weekly and Monthly Report

Painting / Coating Inspector at NeoGenesa International
  • Indonesia - Jakarta
  • October 2007 to January 2008

I have conduct in supervise and inspection of all aspect are required by client to achieve specification which has been stated.
my last experience in past 15 years are Passive Fire Proofing, Insulation, and Blasting Painting

PFP Inspector (on Behalf of PT.NeoGenesa International) at Santos Ltd
  • Indonesia - Surabaya
  • October 2007 to October 2007

• Secured additional projects for Passive Fire Proofing (PFP) and other prospective coating inspections.
• Conducted meticulously inspected fireproofing coatings at WHP Oyong
• Performed comprehensive fireproofing coating inspections for Santos Sampang Pty Ltd
• Maintained stringent quality control standards for fireproofing application processes.

PFP Inspector ( On Behalf of PT. NeoGenesa International) at Santos Ltd
  • Indonesia - Jakarta
  • September 2007 to September 2007

Apply PFP (intumescent Epoxy System) on ESD (Emergency Shutdown) Valve at Pig receiver line through gas Producing from Oyong And Maleo Field

Field PFP Assistance ( on Behalf of PT.NeoGenesa International) at Labroy Shipbuilding and Engineering Pte Ltd.
  • Indonesia - Jakarta
  • August 2007 to August 2007

• Scheduling and Handling material with proper logistics as required from Manufacturer PFP (Intumescent Epoxy) eg Chartek-7.
• meet the clients needs Santos Ltd in order with the specification H120 JF 60
• Conduct Mock up test it has been witnessed Technical Paint Manufacturer - International Paint, Labroy Shipment Ltd - FSO Fabricator, Santos Ltd - Client

Painting Inspector at PT. CitraBara Mandiri
  • Indonesia - Batam
  • February 2007 to February 2007

Education

Bachelor's degree, Social Welfare And Business Management
  • at University Education of Indonesia
  • February 2024
Bachelor's degree, Bachelor's degree
  • at Universitas Pendidikan Indonesi
  • January 2006
High school or equivalent, social Science
  • at SMA 5 Balikpapan
  • January 2001

Specialties & Skills

Insulation
Inspection
Offshore Operations
Supervising
PAINTING
AGENDA (MEETING)
BULLET (SOFTWARE)
CLEANLINESS
WATER TREATMENT
CONSTRUCTION
CALIBRATION
DATA MAPPING
HYDROCARBON

Languages

English
Intermediate

Training and Certifications

Painting Inspector Grade 2 (Training)
Training Institute:
BGAS CSWIP
Date Attended:
December 2023
Duration:
100 hours