Manager
Own Businesses
Total years of experience :40 years, 0 Months
Fishing Shop)
Drazz Anglers Enterprise, K-6414, Jalan Kuantan Kemaman,
Taman Sri Geliga,
Prepared all related document for Pre-Comm and
Commissioning for Carigali Petronas BAGSF Project
* Perform all project execution such equipment installation, N2
Purging and leak testing.
* Ensure all document for system completion handover to client
as per requirement.
)
Project Involved:
Besar Drilling Platform
Andra-A
Duties and responsibilities:
* Monitoring and update daily progress report to Project Manager
* Ensure all working environment/sea condition and work place as
per client requirement.
* Conduct Daily Tools Box morning meeting with
workers/client/subcontractor/vendor.
* Monitoring Daily Progress Measurement and KPI with each
disciplines Engineer/Planner to meet the daily target.
* Ensure Tools, Equipment and Consumables (TEC)
sufficient/available as per specification/client requirement.
* Ensure all disciplines Manpower Mob/Demob from/to Offshore as
per schedule bot run via AHTS/FCB.
* Ensure all TEC updated from Onshore/Offshore METCO and
equipment/basket backload from Offshore as per planning.
* Monitor Offshore Daily Progress Report (DPR) updated from
Planner.
* Ensure all discipline Engineer liaise and communicate with vendor
follow Vendor Call Out Plan.
* Ensure Mechanical Completion (MC) as per target schedule/plan.
* Ensure all Commissioning Stage will perform as per plan.
* Ensure Construction/Commissioning Checksheet ITR-A/B/C
proper fillup via OCMS and documented/filing.
* Ensure all workpack/procedure as per client accepted and approved.
* Ensure work condition/perform as per safety requirement.
, Solaris Dutamas 1,
Jalan
Saudi Kayan industrial complex located at Jubail Industrial City
with an annual production capacity exceeding 4 million metric tons of
petrochemical and chemical products.
Saudi Kayan industrial complex will add some specialized chemicals to
the Saudi marketplace that will be produced in Saudi Arabia for the
first time. These products include aminoethanols, aminomethyls,
dimethylformamide, choline chloride, dimethylethanol,
dimethylethanolamine, ethoxylates, phenol cumene and
, polycarbonate which will provide wide opportunities
for downstream industries.This is in addition to ethylene, propylene,
polypropylene, ethylene glycol, butene-1 and other products.
Olefins plant consist:
Hot Section:
-Utillities
-Etahne Feed System
-Butane Feed System
-Furnaces
-Quench Tower
-DOX Unjt
-Process Condensate Stripper
-DMDS Dosing
-Charge Gas Compressor (CGC)
-Caustic WashTower
-Gas and Liquid Dryers
-Depropernizer
-Acetylene Reactor
-Incinerators
Cold Section:
-Chilling Train
-Demethanizer
-Cold Box
-Expender Compressor
-PSA Unit
-Deethanizer
-C2 Splitter
-Ethylene Refrigerention and Product
-MAPD Reactors
-C3 Splitter
-Upper and Lower C3 Splitter
-C3 Splitter Compressor
-Prophylene Refrigerention
-Debutanizer
-C4 Hyrogenation Reactor
-C2 Storage and BOG Compressor
-C3 Storage amd BOG Compressor
Benzene Unit:
-GHU 1st. Reactors
-GHU stabilizer
-GHU Deoctanizer
-GHU 2nd. Stage Reactor
-GHU Depentanizer
-HDA Reactor
-HDA Stabilizer
-HDA Recycle Compressor
-Clay Treater
-Benzene Tower
-Recycle Tower
-Pyrolysis Gasoline Storage
Responsible on:
* Provide effective support to the shift operations activities, such as monitoring of facilities and
equipmenst; start-up and shutdown.
* Responsible for the daily operations of plant including trouble shooting.
* Conduct daily TBM meeting with shift team members.
* Be aware of all documents about equipment, it’s function, operation, location and it’s criticality,
emergency shutdown procedure, area of its effect
* Monitors the safe conduct of the work and ensuring the work permit safety conditions are being
met. Applies standard safety measures to all work. Reviews the needs for any special precautions
to be taken
* Be aware of all documents about primary technical documents throughout the Start Up, (P& IDs
etc.) and making them available whenever needed.
* Be aware of all documents about SOP, MSDS, safety shower, fire hydrant, MCP, fire detector
and all emergency phone numbers
* Preparation of Plant punch list and to follow up
* Understand and also help in development of systemization, activity list, detail activity list, test
plan, and flaw integration during CSU development stage.
Monomer plant consist: (A) F-UNIT
(Formal dehyde plant)
-Pre vaporizer
-Vaporizer
-Reactor
-Absober No. 1
-Absober No. 2
(B) TOX UNIT
Department : Production (Ethylene Process)
Ethylene plant consists: -Feed Treatment Section (Remove CO2)
-Pyrolysis Section (Ethane Cracking)
-Quench Tower and process Water
-Stripper section (condenses heavy oil/steam and makes dilution steam)
-Charge Gas Compressor Stage 1, 2 &3 (compress gas to increase
pressure)
-Acid Gas Drying and Charge gas Compressor.
-Stage 4 sections. (Remove CO2 & H2S)
-Chilling section (cold down gas & H2 separation)
-Demethanizer section (Remove CH4)
-Deethanizer section & Acetylene (Separate C2’S, C3’S)
-Ethylene Fractionation section (Separate C2H4 & C2H6)
-Prophylene refregerent
-Ethylene refregerent
Responsible on : -Daily Operation of Plant including Trouble Shooting
-DCS (TDC 3000- Honeywell) operation.
-Emergency countermeasure, emergency drill and
Fire fighting handling
-Check plant Operating condition and advise any
abnormalities.
-To ensure proper house keeping and safety measure are carry out.
Attached to Sitt Tatt industrial
Water Operation
Water treatment plant including :
-Industrial water system
-D.R Scrubbing water system
-Indirect cooling water system
-Fire hydrant/Hose reel system
-Boiler Feed water & dehydrators system
-Potable (drinking) water system
-Water treatment plant CCM#3
Responsible on -Checking and correction for mechanical equipment as above system
-Communication and reports to other section.
-Water sampling/testing and Jar Test
-Emergency drill and countermeasure.
-Plant safety and trouble shooting
up to second years
:
courses: Passed Standard Six