Quality Control Engineer
SAG Consulting group
Total des années d'expérience :13 years, 10 Mois
• Quality Control Engineer at SAG consulting group
(June 2020-present)
PROJECT
- Central park at New Administrative capital (Green river)
- Contractor: Arab contractors
- Consultant: Dar El handsa
• Key Responsibilities:
- Review work shop drawing and coordinate with all trades before submitting to consultant.
- Guarantee the proper quality of the materials, methods of execution maintain guidelines of the standards and make sure work progresses according to it.
- Review quality of all materials at the site and ensure compliance with all project specifications and quality and collaborate with the department for all material procurement and maintain a quality of materials.
- Supervise the effective implementation of all test and inspection schedules and ensure adherence to all procedures and coordinate with various teams to perform quality audits on processes.
- Assist with employees to ensure knowledge of all quality standards and ensure compliance to all quality manual and procedures and collaborate with contractors and suppliers to maintain the quality of all systems.
- Manage all work methods and maintain knowledge on all quality assurance standards and monitor continuous application for all quality assurance processes and recommend corrective actions for all processes.
- Develop a method statement for the activity including Test Plan and Checklist based on specifications of the project.
- Liaise the Technical Engineer for submission of material submittals to Consultant.
- Coordinate with the consultant’s representative and Site In-charge for inspection.
- Report to the QA/QC Manager, control, and monitor all activities related to Quality.
• Resident Mechanical Engineer at Euro get d’invest
(October2019 - Present)
PROJECT
Nine hospitals for the Government of Ghana: (500 bed military hospital in Kumasi for the Ministry of Defense, two regional hospitals in Wa and Kumasi South and six district hospitals in Kumasi Manhyia, Accra Madina, Konongo Odumasi, Salaga, Twifo Praso and Tepa
I am responsible for the Mechanical work for Twifo Praso 60 bed hospital.
• Key Responsibilities:
Manage & supervise sub-contractor for executing of Installation and operation of:
- Central air conditioning systems and ventilation (Chilled water system) including chilled water station including three air cooled chillers 150 T.R each & 3 pumps 380 GPM each with all related accessories and hookup, 55FCU, 11AHU, BMS SYSTEM AND CONTROL WORKS OF FANS AND AIR HANDLING UNITS.
- Pump station including fire protection system, Irrigation & Domestic booster pumps
- Plumping &Fire protection& Irrigation & Domestic Pipes layout & internal Networks.
- Water Treatment Plant.
- Sewage Treatment Plant.
Maintains daily diaries of events associated with the work on site.
Ensure implementation within agreed timescales.
Study drawing, specification and contractual obligations, keeping abreast of all revisions.
Ensure that work practices are compliant with policies and procedures.
Record /input into data collection systems, produce standard reports to ensure project delivery.
Produce weekly programs, method of statements and as built information.
Monitors, reviews, comments and reports on progress payments, quality control.
Assist the construction manager /resident engineer in preparing the monthly progress reports.
Review and approves the as built drawings for final approval by construction manager / resident engineer
Assists in preparing the final acceptance and completion reports.
Review and presents the contractors valuation payments for final approval by construction manager /resident engineer.
Witnesses and supervises commissioning and start-up activities.
Studies and gives comments on the contractor's claims
Checking the shop drawing and materials in quarries before receiving, and also checking all material operations on site to ensure that it is according to specs.
Preparing technical reports -minutes of meetings, and reviewing method of statements, material approval.
Supervising and keeping the time table and checking on the contractor progress to avoid losing the project time limit.
• Quality Control Engineer at COOLINK GH LTD
(April2019-August2019)
• Key Responsibilities
Central air condition, Ventilation & Refrigeration Design.
Installation and operation of central air conditioning systems and ventilation (DX or chilled water).
Design of air distributor duct work and chilled water piping network.
Load calculation of air conditioning and ventilation.
Studying central air conditioning Tender projects:
o Selection of required equipment as per project specification.
o Preparation and pricing for the projects Bill of quantities.
o Manage and supervise subcontractors to assure that works done in proper way.
o Comply with the projects specifications.
o Mailing Suppliers for All Equipment that are needed for a Project.
o Following up jobs related to sites including material supply, work progress.
o Assuring that works meet the timeline as per the work schedule.
• Resident Mechanical Engineer at SAG CONSULTING GROUP ( April 2016 - present )
PROJECT
Nine hospitals for the Government of Ghana
(Main Contractor: Euro get De-Invest Company)
I am responsible for the Mechanical work for 100 bed hospital
including :
Manage & supervise sub-contractor for executing of Installation and operation of central air conditioning systems and ventilation
(Chilled water system)
Manage & supervise sub-contractor for executing & Installation of chilled water station including three air cooled chillers 150 T.R each & 3 pumps 380 GPM each with all related accessories and hookup
• Manage & supervise sub-contractor for executing & Installation of BMS SYSTEM AND CONTROL WORKS OF FANS AND AIR HANDLING UNITS
Manage & supervise sub-contractor for executing of Fire Protection System
Manage & supervise sub-contractor for executing of water tank & pump room
Manage & supervise sub-contractor for executing of all Plumping & Irrigation & Domestic Pipes layout & internal Networks
Manage & supervise sub-contractor for executing of Water Treatment Plant
Manage & supervise sub-contractor for executing of Sewage Treatment Plant
Manage & supervise sub-contractor for executing of Medical gases network
Maintains daily diaries of events associated with the work on site.
Ensure implementation within agreed timescales.
Study drawing, specification and contractual obligations, keeping abreast of all revisions.
Ensure that work practices are compliant with policies and procedures.
Record /input into data collection systems, produce standard reports to ensure project delivery.
Produce weekly programs, method of statements and as built information.
Monitors, reviews, comments and reports on progress payments, quality control.
Assist the construction manager /resident engineer in preparing the monthly progress reports.
Review and approves the as built drawings for final approval by construction manager / resident engineer
Assists in preparing the final acceptance and completion reports.
Review and presents the contractors valuation payments for final approval by construction manager /resident engineer.
Witnesses and supervises commissioning and start-up activities.
Studies and gives comments on the contractor's claims
.
Checking the shop drawing and materials in quarries before receiving, and also checking all material operations on site to ensure that it is according to specs.
Preparing technical reports -minutes of meetings, and reviewing method of statements, material approval.
Supervising and keeping the time table and checking on the contractor progress to avoid losing the project time limit.
PROJECT
- METROPOLITAN INTERNATIONAL SCHOOL Phase 1 & 2
- Project Consultant is ECG
Key Responsibilities:
Installation & Operation of the Fire Protection Pump Set including Three pumps (Electric & diesel & jockey pump).
Installation & Operation of the Irrigation & Domestic pump sets with all accessories for the pumps.
Installation & Operation of Three Submersible Pump Set with all Accessories for the Pumps.
Manage & supervise sub-contractor for executing of Installation and operation of central air conditioning systems and ventilation including (100 concealed units - 6 Air handling units - computer room air handling unit - 10 smoke fans - 28 Exhaust fan - 3 fresh air fans).
Manage & supervise sub-contractor for executing of Fire Protection System including sprinklers, fire cabinet, fire hydrant, fire department connection, CO2 & FM 200 Gas System.
Manage & supervise sub-contractor for executing of BMS SYSTEM AND CONTROL WORKS OF FANS AND AIR HANDLING UNITS
Manage & supervise sub-contractor for executing of all Plumping & Irrigation & Domestic Pipe Networks
Manage & supervise sub-contractor for executing of Two Swimming Pools (SKIMMER & OVERFLOW) and Installation of All Equipment of pump room & Balance tank
• Mechanical Engineer at Mechano Egypt HVAC CONTRACTORS
(January 2013 - July 2014)
Key Responsibilities:
Central air condition, Ventilation & Refrigeration Design.
Installation and operation of central air conditioning systems and ventilation (DX or chilled water).
Design of air distributor duct work and chilled water piping network.
Load calculation of air conditioning and ventilation.
Studying central air conditioning tender projects.
- Dealing with subcontractors.
- Mailing Suppliers for All Equipment that are needed for a Project.
- Following up jobs related to sites.
PROJECTS:
Installation of new chillers, pumps & chilled water pipe network system for Vodafone -10th of Ramadan - (Chilled Water System).
Design & Execute of central air conditioning & Ventilation for CIB -Kafr Elshiekh-(DX system).
Execute of central air conditioning, Ventilation & Fire Fighting system Ahli United Bank - Sky Plaza- (Chilled water system).
Design & Execute of central air conditioning & Ventilation for CIB -Gesr El Suez-(DX system).
Execution of the new chilled water pipe network for Vodafone-october-(Chilled water system).
Installation of the new pumps & chilled water pipe network for Vodafone - Maadi- (Chilled water system).
Design & Execute of central air conditioning, Ventilation & Fire Fighting system for Air France/KLM -CFC- (chilled water system).
Design & Execute of central air conditioning & Ventilation for Eli Lilly (Pharmaceutical Company) -CFC- (chilled water system).
Design & Execute of central air conditioning & Ventilation for Mobinil-CFC- (chilled water system).
Execute of central air conditioning & Ventilation for Vodafone C3 SOC Room - Smart Village - (Chilled water system).
Execute of central air conditioning & Ventilation for Cok Guzel -October- (DX system).
Execute of central air conditioning & Ventilation for Carrefour-Helwan- (DX system).
• Site Engineer at Tallat Mustafa Group ( Madinity Project ) (March 2012 -December 2012)
• Key Responsibilities:
Execute of External plumbing & water supply pipes Network and internal plumbing & water Supply pipes network for buildings.
Execute of firefighting main riser for each building and pipes network for Fire Cabinet for each
Floor.
Trainings and Internships
• Tallat Mustafa Group ( Madinity) Summer 2010
• Toyota car service Summer 2009
• Blaeem petroleum company Summer 2008
• Peugeot car service Summer 2007
Education: • University Degree: Bachelor of mechanical engineering (power department) Faculty of Engineering, Shoubra, Banha University, 2010. • Graduation Class: July 2010 • General Grade : Sufficient ( 64.51 % ) • Graduation project: “Experimental refrigeration cycle“ • Graduation project Grade: Excellent