Systems Design engineer
Mouchel
مجموع سنوات الخبرة :29 years, 11 أشهر
Flood Water Drainage
through some of the contracts concluded between the
of the Water drainage and flooding rains project
ــ west of Khalidiya district in Onaizah ــ (Qassim) ،
through the contract for supervision the implementation
of the project concluded between the Secretariat of the
Qassim region with (Arab Group Engineering Consultant
office).
Work tasks
1- Follow-up to the project and quality control of
materials used in construction included in the project,
and prepare daily reports on the projects.
2 - Follow-up to the achievements of projects, compare
these achievements with the schedule of the project and
prepare monthly reports on the achievements supported
by statistics, charts, graphs and photographs.
4- Verification of the application of the conditions and
technical specifications on all construction works
5- Review Abstracts and Bills of Quantities executed on
the ground provided by the contractor and compare them
with the amounts provided for contract.
public administration for projects
management (girls' education) in the Ministry of
Education in Riyadh and through the contract for
supervision the implementation of the project for
buildings and constructions (education departments
, health units, students hostels and sport halls) concluded
between the the
1- oversee the renewal of water supply systems and its
maintenance.
2 - Oversee the renewal of the network of sewage
systems and its maintenance .
3- Overseeing the implementation of some swimming
pools attached to the center of social and recreational
4 - Prepare monthly reports on project activities and
compliance schedules prepared in advance .
5 -prepare plans of architectural and construction
designs, conditions, specifications, bills of quantities And
price estimates for the projects .
6 - Audit plans by implementation and the final extracts
of the projects .
Taif Municipality (the Ministry of
Municipal and Rural Affairs)
Work tasks
1 - prepare plans of architectural and construction
designs, conditions, specifications, bills of quantities And
price estimates for the project (Housing cleaners in Taif)
and consequently residential units, restaurant, mosque,
elevated, ground water tanks and the head offices of the
General Directorate department, house accommodation
for Director-General, landscaping and the concrete fence
surrounding the city residential and gated entry and exit.
2 - oversee the implementation of concrete and metal
installations of the municipality and receive their
business in accordance with the conditions and
specifications of engineering and architectural assets.
3 - survey to produce topographic maps and cadastral
Maps and cadastral maps for many sites.
4 - check engineering plans for the facilities and buildings
and the application of building permits on their own
nature and the preparation of technical and engineering
reports for sites such permits .
Egyptians Company for
Trading and Contracting in Cairo.
Work tasks
1 - Review plans of architectural and construction
designs, conditions, specifications, bills of quantities And
price estimates for some projects in Tenth of Ramadan
City and Sixth of October.
2 - oversee the implementation of residential towers
owned by the Company in Tenth of Ramadan City,
Sixth of October city and
of Engineering Management in Egyptians
Company for Trading and Contracting in Cairo.
Work tasks
1-Follow-up and duties of the engineers in sites and
preparation of schedules for projects that
are implemented by the company.
2- Follow-up implementation of projects in
accordance with the conditions and technical
specifications.
3 - Review plans of architectural and construction
designs, conditions, specifications, bills of quantities And
price estimates for some projects in Tenth of Ramadan
City and Sixth of October.
1- Subscribe to surveying and construction of upper civil
metal bridges implemented by the armed forces
2 - Subscribe to the measurement of Drop in facilities and
buildings on the path of underground tunnels in Cairo.
3- survey to produce topographic maps and cadastral
maps for many sites.
4- Calculating of drilling and filling quantities, and
preparing necessary sections . For several roads in cairo.
5- Preparation of technical reports for some buildings in
terms of vertical and orientation and settlement.
Egyptians Company for Trading and
Contracting in Cairo.
Work tasks
oversee the implementation of several projects belonging
to the Enterprise (self-sufficiency in food)in Bilbeis desert
region which is a facility for the manufacture of animal
feed.
public administration for
studies and designs, the secretariat of Riyadh region,
and through the contract For the implementation
of the project for the cadastral studiesand and
determine levels of the streets in Riyadh (Phase XI)
concluded between the Secretariat and Nizar Kurdi
engineering consultant Office .
Worktasks
1- Design of storm drainage network for different
areas in Riyadh.
2- Preparation of studies and detailed reports
on citizens' requests for the issuance of
building permits or fencing on the land they own.
3- Checking the paths through the valleys and
coral some areas in Riyadh and prepare the
necessary studies to disarm Ladtha of their owners
and financial compensation
4 - Checking of storm water drainage network
studies submitted to the Secretariat which designed
by the consultant offices for plans required approval
for development.
5 - preparation of contracts and specifications of the
work required for storm water drainage networks
projects (studies, design and constructions).
6 - Study of daily transactions to resolve citizens'
complaints from the sites gatherings rain water.
7- Preparation conditions and technical
specifications and the contract for the development
and rehabilitation of the head offices of the General
Directorate of Studies and Designs.
Second,
of the project ( oversee the work of the asphalt
project for roads and Residential neighborhoods in
Buraida) through the contract for supervision the
implementation of the project concluded between the
Secretariat of the Qassim region with the Advisory Group
(Office of Zuhair Yassin full solidarity with the Office of
the orbit of the survey) .
Work tasks
1- Follow-up to the project referred to Efficiency in terms
of the quality control of materials used in construction of
roads included in the project .
2 - receiving the survey plans and audit data .
3 - Receipt and approval of the layers of backfilling and
pavement used in construction of roads.
4- Follow-up and adoption of the results of field and
laboratory experiments conducted at the layers of rubble
and asphalt constituents of the road according to the
conditions and technical specifications.
5 - Prepare monthly reports on project activities and
compliance schedules prepared in advance .
in