Total Years of Experience: 16 Years, 7 Months
May 2017
To Present
Project Procurement Manager
at Rashid trading and Contracting
Location :
Saudi Arabia - Hofof
November 2015
To February 2017
Senior Electrical Engineer
at Alrajhi For Buildings & Construction
Location :
Saudi Arabia - Abha
February 2013
To October 2015
1-Senior Electrical Site Engineer for SAUDI OGER LTD
at SaudiOger
Location :
Saudi Arabia - Jeddah
* SAUDIARABIA
1-Senior Electrical Site Engineer for SAUDI OGER LTD From February 2013 Till Now At: -
• KING ABDULLAH BIN ABDUL AZIZ DEVELOPMENT OF SECURITY CENTERS .
Client : Ministry Of Interior (MOI)
ESTIMATED CONTRACT SUM: 7, 619, 419, 851 SR
For Power & Light current systems
1-Senior Electrical Site Engineer for SAUDI OGER LTD From February 2013 Till Now At: -
• KING ABDULLAH BIN ABDUL AZIZ DEVELOPMENT OF SECURITY CENTERS .
Client : Ministry Of Interior (MOI)
ESTIMATED CONTRACT SUM: 7, 619, 419, 851 SR
For Power & Light current systems
April 2010
To January 2013
1- Electerical Site Engineer for MEDCOM
at Misr Engineering Development Company (MEDCOM)
Location :
Egypt - Cairo
* EGYPT
* 1- Electerical Site Engineer & MEP Coordinator Engineer for MEDCOM From April 2010 January 2013
MEP COORDINATOR (Managing all components of a construction project related to the mechanical, electrical and plumbing)
* For the following Mega projects: -
*NILE UNIVERISTY UB2
* FIRE FIGHTING STATION (B 11) AT MAADY SMART ZONE
*EGYPTIAN EXCHANGE (B135) AT SMART VILLAGE
For the following systems
Power systems
(Lighting, Power)
Light current & control systems
- Building Management System (BMS)
- Access Control & security
- IP CCTV
- Fire Alarm.
- Telephone& Date.
- Master Antenna TV (MATV)
CONSULTANT ECG Consultant Group.
* 1- Electerical Site Engineer & MEP Coordinator Engineer for MEDCOM From April 2010 January 2013
MEP COORDINATOR (Managing all components of a construction project related to the mechanical, electrical and plumbing)
* For the following Mega projects: -
*NILE UNIVERISTY UB2
* FIRE FIGHTING STATION (B 11) AT MAADY SMART ZONE
*EGYPTIAN EXCHANGE (B135) AT SMART VILLAGE
For the following systems
Power systems
(Lighting, Power)
Light current & control systems
- Building Management System (BMS)
- Access Control & security
- IP CCTV
- Fire Alarm.
- Telephone& Date.
- Master Antenna TV (MATV)
CONSULTANT ECG Consultant Group.
March 2009
To April 2010
Electrical Site Engineer
at AL Tawheed Construction Office
Location :
Egypt - Cairo
* From March 2009 till April 2010 for the following projects: -
Electrical Site and Technical Office Engineer for the following projects
* The Main Building of Smart Village B2401
Termination of main electrical rooms And routing the building risers composed of 160 electrical panels.
CONSULTANT ECG Consultant Group.
* MARVEL CITY (Residential Compound)
Working for interior (Lighting, sockets, Power, sockets Ac and low current TV, Telephone, Intercom systems) and exterior power networks (medium voltage for 2 transformers and low power networks and street lighting) and low current network (Master Antenna Systems For Each building, Main PBX for compound, Main Intercom Networks) For 152 block unit
CONSULTANT AUG Consultant Group.
* UNITED BANK DOKKI BRANCH
Working for installation of all networks (Fire Alarm, Date, Telephone Systems)
CONSULTANT INTER DESIGN Group.
* POLARIS INDUSTARIL PARKS
Working for installation of medium networks and low tension networks for 30 km cables and working in electrical and distributor rooms.
CONSULTANT Shaker Consultant Group.
* Palm Parks Phase 1 (PALM HILLS)
Working for Preparing and Reviewing Electrical (Lighting, power, power for Feeders) and Low Current Drawings (Triple play systems Data Telephone, TV), Materials submittals, Inspection Requests RFI and all what related to technical office working.
Electrical Site and Technical Office Engineer for the following projects
* The Main Building of Smart Village B2401
Termination of main electrical rooms And routing the building risers composed of 160 electrical panels.
CONSULTANT ECG Consultant Group.
* MARVEL CITY (Residential Compound)
Working for interior (Lighting, sockets, Power, sockets Ac and low current TV, Telephone, Intercom systems) and exterior power networks (medium voltage for 2 transformers and low power networks and street lighting) and low current network (Master Antenna Systems For Each building, Main PBX for compound, Main Intercom Networks) For 152 block unit
CONSULTANT AUG Consultant Group.
* UNITED BANK DOKKI BRANCH
Working for installation of all networks (Fire Alarm, Date, Telephone Systems)
CONSULTANT INTER DESIGN Group.
* POLARIS INDUSTARIL PARKS
Working for installation of medium networks and low tension networks for 30 km cables and working in electrical and distributor rooms.
CONSULTANT Shaker Consultant Group.
* Palm Parks Phase 1 (PALM HILLS)
Working for Preparing and Reviewing Electrical (Lighting, power, power for Feeders) and Low Current Drawings (Triple play systems Data Telephone, TV), Materials submittals, Inspection Requests RFI and all what related to technical office working.
February 2008
To March 2009
Electrical Technical Office Engineer
at Safi - National Co. For Producing & Bottling Natural Water
Location :
Egypt - Cairo
• Spending My Military Service At Engineering Management Department Responsible to Follow ISO 9001-2000 Requirements.
• Responsible For Follow Production Lines Requirements & Maintenance Processes.
• Responsible For Follow Production Lines Requirements & Maintenance Processes.
August 2007
To January 2008
Electrical Site Engineer
at ENCO Company
Location :
Egypt - Cairo
CONSULTANT ECG Consultant Group.
* 3- Electrical Site Engineer for ENCO Company
From August 2007 till January 2008
* Project: Golden pyramids plaza project city stars star centers mall phase 2 (Car Show)
Installation of power networks and low current networks working as Quality Control Engineer.
CONSULTANT Shaker Consultant Group
* References will be produced upon request.
* 3- Electrical Site Engineer for ENCO Company
From August 2007 till January 2008
* Project: Golden pyramids plaza project city stars star centers mall phase 2 (Car Show)
Installation of power networks and low current networks working as Quality Control Engineer.
CONSULTANT Shaker Consultant Group
* References will be produced upon request.