Senior Electrical engineer
Sudanese Thermal Power Generation Company
مجموع سنوات الخبرة :8 years, 10 أشهر
-visually inspected and tested machinery and equipment.
‐performing routine preventive maintenance.
-review technical documentation to complete equipment maintenance and repair.
- organized and directed maintenance shutdowns and startups.
-Coordinated with external contractors during major overhaul projects or specialized maintenance activities, ensuring alignment with organizational goals and regulatory requirements.
Developed and implemented a preventive maintenance program that reducing maintenance costs and increasing equipment uptime.
Assisted and directed a 10-person team in Overhauling 40MVA steam turbine generator reducing maintenance cost by 35%.
Managed and directed a team to test, repair and replace meduim and low voltage ( 33KV, 11KV, 6.3KV and 0.415KV) cables cutting downtime by 20% .
Structured a training program in upgraded meduim and low voltage switchgear operation for six operation engineers witch decreased power outage by 80% .
Enhanced plant safety by inspecting and maintaining electrical equipments ensuring compliance with standards and regulations.
-Testing and commissioning of electrical equipments ( generators, Transformers, motors, cables and switchgear).
Assisted in replacing the lighting infrastructures, upgrading them from outdated to energy-efficient lighting systems that reduced the power consumption by 25% .
Performed preventive and corrective maintenance program for high, medium and low voltage transformers increasing availability by 10% .
Collaborated with mechanical engineers to upgrade the drainage and waste pumps system that raised availability to 80%.
Directed and lead over five maintenance staff daily to undertook periodic maintenance on all electrical equipments.
Participate with overseas team to overhaul meduim and low voltage switchgear reducing cost by 30%.
Collaborated with external contractors in test, repair and rewinding 40MVA generator and meduim voltage motors.
Supervised and trained over ten operators to deal with meduim voltage switchgear resulting in precise and efficient operation.
Documented maintenance activities and confirmed compliance with relevant regulations.
Conducted root cause analysis for recurring equipment failure, implementing corrective actions to prevent future occurrences.
Participated in Maintenance and repair of all the electrical equipment in the distribution substation.
Testing and commissioning of meduim and low voltage Overhead lines and cables.
Testing and commissioning of all the electrical components in the distribution substation.
graduation project ( Three winding power Transformers)