Senior Project Leader/Team Lead
Wipro Arabia Ltd
Total years of experience :11 years, 2 Months
• Smartplant Lead
• Played the Role of Project Lead
• Updating As-built SPI drawings from existing Smartplant SPI database.
• SPID drafting and quality check as per Saudi Aramco standards.
• Requirement Analysis and deduction of implementation strategies.
• Interaction End to End Coordination with Aramco.
• Resource’s Management and Man Hours Estimation as per the Project Schedule
• Ensuring to provide the deliverables on time
• CRM calculations for the resources Management
• SmartPlant Lead
• Documentum analysis for HX-GN and NON HX-GN.
• Creation Naming convention for SPI, SPPID & SPEL as per project scope.
• Upgraded SPI v2009 to v2013.
• Integration of Smartplant tools (SPI, SPPID SPEL & SP3D) with SPF.
• Smartplant Fusion Configuration.
• Extraction of Instrument Tags from the P&ID Inputs drawings
• Gap Analysis between Inputs tags to existing SPI Instrument Tags
• Creation of Instrument Index, IO List, cable schedule and Instrument loop drawings
• Import data to SPI in Import Module as well as in Oracle backend.
• Successfully handed over SPF Server & SP tools Server to GASCO.
• Successfully Completed SAT on GASCO Office (Abu-Dhabi)
• Project Lead and Integration specialist.
• Requirement Analysis and deduction of implementation strategies.
• Publishing and retrieving activities in an integrated SmartPlant environment.
• Custom relationship creation between TEF and Non-TEF Data.
• Installed and Configured VTL system (Validation transformation & Loading) tool.
• Installation of SmartPlant Foundation for on-site remote deployment.
• Configuration of SPF v2009 SP4, v2014, v2018 R1.
• Configuration of SPF like Creation of Menu, Method, quick find, Class, Interface, property defs etc.
• Configured Security Model.
• Mapping of OOTB properties to SPF.
• Formulated of FRS, FDS, and DDS Documents.
• Integration of SmartPlant all tools like (SPI, SPPID, SPEL and SP3D) with SPF.
• Published of SPI, SPPID, and SPEL & SP3D Data to SPF in an integrated environment.
• Backup & restoration of SPI, SPP&ID, SPEL, SP3D & SPF.
• Tag and Document naming convention creation as per Project requirement.
to
Electronic & instrumentation Engineering
URL removed due to policy violation. Please contact support for further information.