Pankaj  Kumar, Senior Project Leader/Team Lead

Pankaj Kumar

Senior Project Leader/Team Lead

Wipro Arabia Ltd

البلد
المملكة العربية السعودية - الخبر
التعليم
الثانوية العامة أو ما يعادلها, Electronic & Instrumentation Engineering
الخبرات
11 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 3 أشهر

Senior Project Leader/Team Lead في Wipro Arabia Ltd
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ ديسمبر 2018

• Smartplant Lead
• Played the Role of Project Lead
• Updating As-built SPI drawings from existing Smartplant SPI database.
• SPID drafting and quality check as per Saudi Aramco standards.
• Requirement Analysis and deduction of implementation strategies.
• Interaction End to End Coordination with Aramco.
• Resource’s Management and Man Hours Estimation as per the Project Schedule
• Ensuring to provide the deliverables on time
• CRM calculations for the resources Management

SmartPlant Administrator في L&T Technology Services
  • الهند - مومباي
  • أبريل 2015 إلى نوفمبر 2018

• SmartPlant Lead
• Documentum analysis for HX-GN and NON HX-GN.
• Creation Naming convention for SPI, SPPID & SPEL as per project scope.
• Upgraded SPI v2009 to v2013.
• Integration of Smartplant tools (SPI, SPPID SPEL & SP3D) with SPF.
• Smartplant Fusion Configuration.
• Extraction of Instrument Tags from the P&ID Inputs drawings
• Gap Analysis between Inputs tags to existing SPI Instrument Tags
• Creation of Instrument Index, IO List, cable schedule and Instrument loop drawings
• Import data to SPI in Import Module as well as in Oracle backend.
• Successfully handed over SPF Server & SP tools Server to GASCO.
• Successfully Completed SAT on GASCO Office (Abu-Dhabi)
• Project Lead and Integration specialist.
• Requirement Analysis and deduction of implementation strategies.
• Publishing and retrieving activities in an integrated SmartPlant environment.
• Custom relationship creation between TEF and Non-TEF Data.

Smartplant Engineer في Rolta India Ltd
  • الهند - مومباي
  • فبراير 2013 إلى فبراير 2015

• Installed and Configured VTL system (Validation transformation & Loading) tool.
• Installation of SmartPlant Foundation for on-site remote deployment.
• Configuration of SPF v2009 SP4, v2014, v2018 R1.
• Configuration of SPF like Creation of Menu, Method, quick find, Class, Interface, property defs etc.
• Configured Security Model.
• Mapping of OOTB properties to SPF.
• Formulated of FRS, FDS, and DDS Documents.
• Integration of SmartPlant all tools like (SPI, SPPID, SPEL and SP3D) with SPF.
• Published of SPI, SPPID, and SPEL & SP3D Data to SPF in an integrated environment.
• Backup & restoration of SPI, SPP&ID, SPEL, SP3D & SPF.
• Tag and Document naming convention creation as per Project requirement.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Electronic & Instrumentation Engineering
  • في Annamalai University
  • يناير 2012

to

بكالوريوس, Electronic & Instrumentation Engineering
  • في Annamalai University
  • يناير 2010

Electronic & instrumentation Engineering

Specialties & Skills

SmartPlant 3D
Instrumentation
Oracle, SQL
SmartPlant Foundation, SmartPlant Owner Operator, Smartplant instrumentation, PID, SP3D, PDS, PDMS
SmartPlant Foundation, Smartplant instrumentation, PID, SP3D, PDS, PDMS
CUSTOMER RELATIONS
DOCUMENTUM
DATABASE ADMINISTRATION
DOCUMENT MANAGEMENT

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متمرّس
الهندية
متمرّس