Phinoo Vattathara, Deputy Team Leader

Phinoo Vattathara

Deputy Team Leader

Aarvee Associates

البلد
الهند - كيرالا
التعليم
بكالوريوس, Electrical and Electronics Engineering
الخبرات
23 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 1 أشهر

Deputy Team Leader في Aarvee Associates
  • الهند
  • أشغل هذه الوظيفة منذ أبريل 2021

Project Management
(Initiation, Planning, Execution,
Control & close out)
Traction Substation &SLD Designs
Traction Simulations
Rail Depot Designs
Earthing and Bonding Designs
Stray Current mitigation designs
Cable Routing Designs
Third Rail Designs
OH catenary designs(ROCS, OCS)
Energy Auditing
Construction & change Management
• A competent Traction and management Professional with more than 20
years’ overall experience in Electrical field and with more than 15
years’ experience in the rail industry in DC traction third rail, APS and
Overhead catenary systems.
• Demonstrated abilities for with Designs requirement collection, planning
phases, on time delivery of deliverables, Executing and control of
deliverables, close of snags & hand over.
• An expert in the Traction Substation & SLD designs, Depot designs who
successfully completed three international projects (Dubai metro,
Bangalore Metro, Qatar Lusail LRT Tram) with 6 depots in his credit.
• An Expert in the Earthing & bonding designs with stray current
mitigation and monitoring.
• An Expert in the Main line and Depot cable routing designs.
• An expert in the Third rail and installation designs.
• Demonstrated abilities in the integrated testing and commissioning of DC
traction system with third rail, rolling stock.
• Highly skilled in the Energy Auditing.
• An Effective communicator with good Analytical, leadership,
interpersonal and problem solving skills
• Good Liaising skills with Clients, vendors and a good motivator.
• An effective team player with quick decision abilities in an agile
environment.
CORE COMPETENCIES
* Project Management
* DC Traction substations, main line and Depot Designs
* Earthing & bonding designs
* Stray current Designs
* Bill of Quantities preparation
* Cable routing designs
* Third rail designs

Senior Project Manager في ABB India Ltd
  • الهند
  • سبتمبر 2013 إلى ديسمبر 2015

BMRCL LRT project), Bangalore
Role - DC & Third rail Manager, Report to -

Senior Project Manager في ABB India Ltd
  • الهند
  • مارس 2010 إلى سبتمبر 2013

BMRCL LRT project), Bangalore
Role - DC System Expert, Report to -

Electrical Engineer في Mitsubishi corporation
  • الإمارات العربية المتحدة
  • أكتوبر 2005 إلى فبراير 2010

Dubai Metro project), Dubai
Role -

  • يناير 2005 إلى يناير 2010

TCOMP Training, Mitsubishi, Dubai Metro 1st
, 2nd
, 3rd
level,

Project Engineer في Kerala Industrial technical Consultancy Organization(KITCO)
  • يوليو 2004 إلى سبتمبر 2005

Handled responsibilities as the project Engineer at 110KV (25MVA) substation construction Site (Site- Cochin
special economic zone, Cochin) and supervised the testing and commissioning of different equipment’s in the
substation including the HV and LV cable testing.
* Experienced in the electrical design (Lighting, HT systems etc.), ring main system, estimation, rate analysis, tender
preparation, for different projects including the airport projects

Site Engineer في Neocon Engineers(P) Ltd
  • الهند
  • أكتوبر 2001 إلى يوليو 2004

Report to - Director Technical
RESPONSIBILITIES
* Handled responsibilities as the site engineer for different building electrification Projects. Coordination with all
consultants and checking of their drawings coordination between contractors, material selection and approvals with
regards to schedules/BOQ for services implementation. Site corrections and modifications on the drawings for the
correct adaptations and providing feedback to the design team on problems encountered in the field .Supervise
different electrical equipment installations at site.
* Handled responsibilities as the Shift engineer of 66 KV Substation, Njarakal and involved in the
operation/maintenance of 66 KV substations. Maintenance include the annual, preventive and breakdown
maintenance of the substation equipment’s like, Transformers, CTs, PTs, Isolators, vacuum circuit breakers, battery
panels etc.
* Conducted energy audits at

Assistant Service Engineer في Bharat Earth Movers Limited(BEML)
  • أكتوبر 2000 إلى أكتوبر 2001

Recruited through campus placement), Report to - Branch Manager
RESPONSIBILITIES
* Attending the day-to-day breakdown of 120-ton dumpers and ensuring minimal breakdown time.
* Identifying and analyzing the main breakdown problems and taking appropriate steps for reducing the breakdown
time.
* Meeting the spare parts requirements in the project

الخلفية التعليمية

بكالوريوس, Electrical and Electronics Engineering
  • في National Institute of TechnologyRECPMPProject Managemen
  • فبراير 2019

courses: Certified Project Management Professional (

ماجستير, Manufacturing Management
  • في BITSABB higher studies scholarship scheme
  • يناير 2013

(

Specialties & Skills

Light Rail
Electrical
ACCREDITED PROJECT MANAGER
AUTOCAD
CABLING
CHANGE MANAGEMENT
CONSULTING
CONTRACT MANAGEMENT
CUSTOMER SATISFACTION
DELIVERY

اللغات

الانجليزية
متمرّس
الهندية
متمرّس