Total Years of Experience: 26 Years, 1 Months
December 2014
To January 2018
project Head
at Prasad group,
Location :
India - Kolkata
Currently working as project head with Rare earth project a high rise residential with prasad group in kolkata. Job is review of all drawings, construction coordination with all stack holders, consultants and execution of work. Day to day monitoring, review the progress and site team coordination. Overall project incharge including site management, contract management, contractors bill submissions etc complete. The current project is about to finish by June'2018 and looking for career opportunity.
July 2011
To July 2012
General Manager
at Lodha healthy constructions ltd
Location :
India
Presently working as General Manager ( construction management) in Lodha healthy constructions ltd (lodha group, Mumbai), for Lodha Belezza project in Hyderabad, India. Handling 20 lakh sqft consisting of 6 towers each of having 2 basements + podium level + ground floor + 40 + floors + helipad ( on 3 towers only) . Currently all slabs (40 floors) were casted with mivan shuttering ( with slab cycle of 9/10 days) and Helipad work in progress at 150 mts level from ground floor.Finishings are at different stage. The project is expected to finish by Dec '13 to handover to customers.
FROM JuLY '2011-JULY 2012.: Peninusula land ltd, Mumbai, in as Asst. General Manager (Projects): headed the projects located in Hyderabad 1) Ashok heights a multistoried residential towers proposed in Hyderabad.s a huge cluster of 34 towers each of 24 floors + 2 podium floors + 2 basements. The total built up area is 16 lakh sqft with premium flats, club house along with all infrastructure for gated community. The work is under progress.
FROM JuLY '2011-JULY 2012.: Peninusula land ltd, Mumbai, in as Asst. General Manager (Projects): headed the projects located in Hyderabad 1) Ashok heights a multistoried residential towers proposed in Hyderabad.s a huge cluster of 34 towers each of 24 floors + 2 podium floors + 2 basements. The total built up area is 16 lakh sqft with premium flats, club house along with all infrastructure for gated community. The work is under progress.
March 2007
To January 2011
Asst. General Manager
at KEI Group
Location :
India
Since March '2007-2011: KEI Group as Asst. General Manager (Projects), Hyderabad, india.
S.No Project title Built up area in Sqft Duration of the project Cost of the project
1 Sky dome " residential towers (2B+G+11F), banglore, india 9.00 Lakh 2007-2010 Rs 130.00 Crores
2 International block, Apollo Hospital, Hyd (4B+G+8F), india 4.00 lakh sqft 2009-2011 Rs 90.00 Crores
S.No Project title Built up area in Sqft Duration of the project Cost of the project
1 Sky dome " residential towers (2B+G+11F), banglore, india 9.00 Lakh 2007-2010 Rs 130.00 Crores
2 International block, Apollo Hospital, Hyd (4B+G+8F), india 4.00 lakh sqft 2009-2011 Rs 90.00 Crores
October 2005
To November 2007
Spearheading all project management functions
at Development Corporation
Location :
India
Oct' 05 -Nov' 07: Andhra Pradesh Health and Medical Housing and Infrastructure Development Corporation as Deputy Executive Engineer Andhra Pradesh, india.
Role: ◆ Spearheading all project management functions
◆ from the grounding the work as per the GFC drawings received from the head quarters, cross checking the actual quantities as per the GFC drawings and with the quantites enclosed with work order. If any discrepancy noticed, preparation of necessary revised BOQ and seeking the ratification duly explaining the reasons for such deviation from the competent authority for construction of Hospitals, & housing for staff of Medical department, etc.
◆ Monitoring of execution of works, progress, quality check, billing, follow up on time lines, achieving the target dates, ensuring timely completion and preparation of revised estimates, and timely submission of vendor bills, quality reports, progress reports of weekly, fortnightly and monthly, project schedule delay if any. Preparation and submission of completion report and completion drawings.
◆ During my tenure in this organization, within span of 2 years, the total no of completed works area 6 out of which 3 are big Hopitals and the rest of works housing infra works for the staff. The total built up area for these works was about 4.00 lakhs.
Role: ◆ Spearheading all project management functions
◆ from the grounding the work as per the GFC drawings received from the head quarters, cross checking the actual quantities as per the GFC drawings and with the quantites enclosed with work order. If any discrepancy noticed, preparation of necessary revised BOQ and seeking the ratification duly explaining the reasons for such deviation from the competent authority for construction of Hospitals, & housing for staff of Medical department, etc.
◆ Monitoring of execution of works, progress, quality check, billing, follow up on time lines, achieving the target dates, ensuring timely completion and preparation of revised estimates, and timely submission of vendor bills, quality reports, progress reports of weekly, fortnightly and monthly, project schedule delay if any. Preparation and submission of completion report and completion drawings.
◆ During my tenure in this organization, within span of 2 years, the total no of completed works area 6 out of which 3 are big Hopitals and the rest of works housing infra works for the staff. The total built up area for these works was about 4.00 lakhs.
June 2000
To October 2005
Divisional Engineer/Deputy Executive Engineer
at Tourism and infrastructure dept
Location :
India - Hyderabad
As Divisional Engineer/Deputy Executive Engineer, APTDC: Jun '2000 - Oct' 05
Role: ◆ Played pivoted role starting from taking over of prime properties duly liaison with Govt officials,
◆ Actively involved in finalizing concept.
◆ Coordination with management and team of architects/consultants for finalizing concept drawings, presentation to the management, finalization of schematic drawings and getting the sign off from the competent authority. Review of BOQ, rate analysis, DBR (design brief report), planning schedule and resource planning and allocation etc.,
◆ Review of DBR, BOQ and technical work for all engineering works including rate analysis, preparation of specifications, preparation of tender documents.
◆ Notification of tenders, conducting pre-bid meetings, evaluation of bids for both technical and commercials, meeting on techno commercials, negotiations and finalization of bids and awarding contract. (all are L.S contract)
◆ Communication of all required GFC drawings, BOQs considered, constraints during the project, planning schedule to the field engineers.
◆ Monitoring the progress on day-to day basis, resolving the field engineering difficulties, guilding the executing staff, review of the progress, daily, weekly, monthly progress reports, resource re allocations, necessary feed back for the ancillary works, MEP works, follow up etc
◆ Ensuring the timely completion of the project, obtaining the approval for revised sanction, completion drawings, completion certification and occupation. The following major project projects were completed apart from another 25 small to medium range projects.
S.No Project title Built up area in Sqft Duration of the project Cost of the project during that time Cost of the project as per current construction cost.
Role: ◆ Played pivoted role starting from taking over of prime properties duly liaison with Govt officials,
◆ Actively involved in finalizing concept.
◆ Coordination with management and team of architects/consultants for finalizing concept drawings, presentation to the management, finalization of schematic drawings and getting the sign off from the competent authority. Review of BOQ, rate analysis, DBR (design brief report), planning schedule and resource planning and allocation etc.,
◆ Review of DBR, BOQ and technical work for all engineering works including rate analysis, preparation of specifications, preparation of tender documents.
◆ Notification of tenders, conducting pre-bid meetings, evaluation of bids for both technical and commercials, meeting on techno commercials, negotiations and finalization of bids and awarding contract. (all are L.S contract)
◆ Communication of all required GFC drawings, BOQs considered, constraints during the project, planning schedule to the field engineers.
◆ Monitoring the progress on day-to day basis, resolving the field engineering difficulties, guilding the executing staff, review of the progress, daily, weekly, monthly progress reports, resource re allocations, necessary feed back for the ancillary works, MEP works, follow up etc
◆ Ensuring the timely completion of the project, obtaining the approval for revised sanction, completion drawings, completion certification and occupation. The following major project projects were completed apart from another 25 small to medium range projects.
S.No Project title Built up area in Sqft Duration of the project Cost of the project during that time Cost of the project as per current construction cost.
January 2001
To January 2003
at Crores
Location :
India
2001-2003
Rs 30.00 Crores.
100.00 Cr
4 25 nos resorts, budget hotels in all over A.P for Tourism dept, in Andhra Pradesh, India. 10.00 lakhs (for all 25 places) 2000-2003 Rs 80.00 crores. 300.00 Cr
The annual average built up area achieved was 4.00 lakh area and the total built up area is 22.00 lakhs within span of 5 years.Apart from this some innovative project like lake conservative projects, river jetties, reburshiment of old monument works were also successfully done. The Govt of Honoured with cash award and commendation letter.
Rs 30.00 Crores.
100.00 Cr
4 25 nos resorts, budget hotels in all over A.P for Tourism dept, in Andhra Pradesh, India. 10.00 lakhs (for all 25 places) 2000-2003 Rs 80.00 crores. 300.00 Cr
The annual average built up area achieved was 4.00 lakh area and the total built up area is 22.00 lakhs within span of 5 years.Apart from this some innovative project like lake conservative projects, river jetties, reburshiment of old monument works were also successfully done. The Govt of Honoured with cash award and commendation letter.
December 1989
To June 2000
Junior Engineer/Assistant Engineer
at APSRTC
Location :
India
Dec' 89 - Jun '2000: APSRTC as Junior Engineer/Assistant Engineer ( Hyderabad, India)
◆ Executing civil constructions for building large Bus depots, Bus stations, Workshops, Housing for staff, etc.
◆ Preparing estimates, BOQ& rate analysis, drafting specifications, draft contract laws, preparation of tender documents, framing of eligibility criteria of contractors, obtaining technical sanction from the competent authority, notification of tenders, conducting post bid commercial meetings, finalization of contract, awarding contract, communication of all technical data and GFC drawings to field engineers, monitoring the weekly, fortnightly progress reports, review on delays, issue of notices on delays etc and completion of the works including obtaining revised tech sanction,
ACADEMIA
◆ Executing civil constructions for building large Bus depots, Bus stations, Workshops, Housing for staff, etc.
◆ Preparing estimates, BOQ& rate analysis, drafting specifications, draft contract laws, preparation of tender documents, framing of eligibility criteria of contractors, obtaining technical sanction from the competent authority, notification of tenders, conducting post bid commercial meetings, finalization of contract, awarding contract, communication of all technical data and GFC drawings to field engineers, monitoring the weekly, fortnightly progress reports, review on delays, issue of notices on delays etc and completion of the works including obtaining revised tech sanction,