Ponco Adi Winarto, Steam Flood Workover & Stimulation Team Lead

Ponco Adi Winarto

Steam Flood Workover & Stimulation Team Lead

Chevron

Location
Indonesia
Education
Master's degree, Business Administration
Experience
17 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 6 Months

Steam Flood Workover & Stimulation Team Lead at Chevron
  • Indonesia - Pekanbaru
  • My current job since June 2021

1. Managed 2 Workover-Stimulation Rigs (350 HP) in Steam Flood field with characteristic:
a. BLEVE (Boiling Liquid Expanding Vapor Explosion) kick potential
b. Unconsolidated sand formation with Sub-Surface Integrity risk
c. Heat map pattern (Active injection, Steam Chest and Mature zone)
d. Depleted reservoir formation with loss circulation zone
2. Supervised & provided direction for 20 Company Man, 120 Rig personnel and Service Companies personnel
3. Managed Rigs operation with Incident Free Operation, Reliable and meet all Compliance
4. Managed Rigs operation in many well types - Producer, Injector, Dual Injector, Observation, Disposal, Vertical, Directional & Horizontal trajectory
5. Managed Rigs operation in various job types - Completion, Revise Liner, Re-Completion, Injector Re-Configuration, Perforation, Pump Stuck, Lateral Clean Up, Acid & Solvent Stimulation, Bullhead Pumping Stimulation, Coiled Tubing Stimulation, Change Well Head, Plug & Abandon
6. Reviewed & Approved Workover, Stimulation & Completion design well program
7. Developed Workover Rigs contract Scope of Work
8. Reviewed and monitored Rigs contract budget and compliance along contract period
9. Worked with Engineering team, Rig Contractor & Service Companies to improve Workover, Stimulation & Completion operation to be safer, more reliable and efficient

Lead Drilling Performance at Chevron
  • Indonesia - Pekanbaru
  • October 2020 to May 2021

1. Managed Well Performance Plan, aid, and guidance to Drilling Engineering and Operation teams in analyzing data to identify opportunity for performance improvement and target setting
2. Facilitated lookback process, delivered Lesson Learned and Best practices to aim safer, more reliable, and more efficient Drilling operation
3. Facilitated lookback process as internalized knowledge to improve Drilling program and procedures
4. Performed data science and data driven analysis to identify opportunities for upcoming operations - Torque & Drag, Integrated Drilling Systems, Drilling Slide Sheet
5. Managed Drilling Scorecard/KPI and Performance report for all stakeholders (D&C, Assets Team, Government)
6. Facilitated Drilling Process Improvement in all areas - Safety, Compliance, Reliability, Loss Production Opportunity & Capital Avoidance
7. Supported delivery and preparation 4 Drilling Rigs (550-750 HP) to meet Drilling Rig Campaign Portfolio
8. Promoted digitalization initiative to simplify process and accurate data collection (Digital Dashboard, Power BI, i-Drilling, i-CCTV)
9. Representative in Chevron performance global processes, provide assurance including compliance, measurement, verifications, and self-audits
10. Mentoring and support development program for Performance Engineers

D&C Performance Engineer at Chevron
  • Indonesia - Pekanbaru
  • May 2017 to September 2020

1. Designed & reviewed well service, workover and initial completion program in various well types, OHGP, OH Meshrite, EOR steam injector, CH Perforated, Gas well, Oil producer, Water Injector, Water insitu injector, vertical, directional and horizontal well
2. Designed remedial cementing program, technique and CBL evaluation
3. Designed & reviewed fishing program & operation
4. Reviewed stimulation program, acidizing, lateral clean up, fracturing, solvent job
5. Champion of gas opportunity development in Sumatra, increased gas production and potentially delivered 37 BCF (6.2 MMBOE) to support internal gas supply by reactivated & converted oil/gas well
6. Delivered Lean Sigma project for ESP field installation process
7. Developed Management of Change (MOC) regarding safety issues during operation
8. Developed cost estimate (AFE) and project control budget
9. Worked in a team with Geologist, Petroleum Eng., Facility Eng., and Operation starting from Planning, Designing, Executing, and Look Back/Lesson learned the projects
10. Involved in project planning such as material procurement, develop and review contract, rig capability and availability
11. Facilitated RCA in engineering matter and shared the lesson learned

Workover/Well Service Supervisor at Chevron
  • Indonesia - Pekanbaru
  • June 2016 to April 2017

1. Managed completion and workover in offshore operation - Recompletion (Upper and Lower Completion), Plug abandon, artificial lift revision, thru tubing perforation & slick line operation
2. Managed completion and workover operation in various type of well at Heavy Oil - EOR Steam Flood operation, OHGP Producer, OH Meshrite, Ventury Choke, Dual String Injector and Plug Abandon (Vertical, Directional and Shallow Depth Horizontal)
3. Managed completion and workover operation in various type of well at Light Oil operation - EOR Water Flood operation, CH Perforated, CH Liner Producer, Water Injector, Insitu Injector, Gas well, Plug Abandon (Vertical, Directional and Horizontal)
4. Managed coil tubing in land & deep-water operation for Clean Out, Stimulation and Plug Abandon job
5. Supervised daily operation of rig contractor and service company personnel in safely manner
6. Worked with a team (Superintendent, Completion Eng., Geologist and Petroleum Eng.) executed well program in compliance with safety, environmental and government regulations, company standards, timelines, and budgets
7. Forecasted timeline and coordinate with service companies and resource teams to deliver service, logistics and transportation for rig operation
8. Prepared accurate Wellview Completion & Workover report
9. Complied with Wellsafe program to prevent any well control event & loss containment
10. Delivered Lean Sigma Initial Completion Cycle Time at Cased Hole Well Improvement

Drilling Supervisor at Chevron
  • Indonesia - Pekanbaru
  • April 2015 to May 2016

1. Managed drilling operation in various type of well at Heavy Oil - EOR Steam Flood operation, OHGP Producer, OH Meshrite, Injector and Observation (Vertical, Directional, and shallow depth 700 ft TVD Horizontal)
2. Managed drilling operation in various type of well at Light Oil operation, CH Perforated, CH Liner Producer (Vertical, Directional, and 6500 ft MD Horizontal)
3. Managed daily operation of rig contractor and service company personnel in safely manner
4. Worked with a team (Superintendent, Drilling Eng., Geologist and Petroleum Eng.) executed drilling program in compliance with safety, environmental and government regulations, company standards, timelines, and budgets.
5. Forecasted timeline and coordinate with service companies and resource teams to deliver service, logistics and transportation for rig operation.
6. Prepared accurate Wellview Drilling & Completion report
7. Complied with Wellsafe program to prevent any well control event & loss containment
8. Delivered Lean Sigma Project for Rig Offline Activity and Shallow Depth Heavy Oil Horizontal well

Sr. HES Specialist Drilling & Completion at Chevron
  • Indonesia - Pekanbaru
  • March 2014 to March 2015

1. Developing and applying documentation and systems to local situations including specific exercises such as Job Safety Analysis, Lifting Plan, Risk Assessments, Permit to Work
2. Providing training company safe working practices such as Hand Injury Prevention, Drops Object, Incident Investigation and Reporting
3. Coordinate with Manager/Superintendent for HES activities
4. Lead HES inspection and report findings to GM Drilling and Completion and HES Team Leader
5. Facilitate and/or lead incident and nearmisses investigation and reporting as requested
6. Review overall project HES performance report and report to respective Managers
7. Deliver the integration of Incident and Injury Free culture into Contractors work program
8. Lead Site Safety Leadership Team Meetings with Contractor

Lead Completion Engineer at Chevron
  • Indonesia
  • April 2013 to February 2014

1. Fit for purpose Completion Design, Workover procedures, Stimulation, Risk Assessments, Management of Change (MOC) and probabilistic cost estimating, along with capturing lessons learned and best practices
2. Prepare detailed completion procedures and contingency plans
3. Ensure government regulatory & company policy are followed
4. Lead and mentoring other Completion Engineer
5. Use Lean Sigma tool for Performance Improvement measurement
6. Look after the AFE document and Project Closed Out Report
7. Works with Asset, G&G and Drilling team to initiate new technology and optimize the Completion/Workover design and practices
8. SME and works with respective third party Service Contractors as appropriate to achieve Completion and Workover design goals
9. Develop material forecast, rig contracting plan and other rig support services
10. Champion for Steam Flood - Shallow Depth Horizontal Well Completion and Workover
11. Champion for Steam Flood - Slim Hole Injector Plug & Abandonment project
12. Delivered Lean Sigma project for Heavy Oil Routine Service Cycle Time with total potential savings $ 135 MM
13. Delivered Lean Sigma project for Improve Clean Out Sand Process in Heavy Oil operation

Drilling Supervisor at PT. Chevron Pacific Indonesia
  • Indonesia
  • January 2012 to April 2013

1. Managed drilling operation in various type of well at Heavy Oil - EOR operation, OHGP Producer, OH Meshrite, Injector and Observation (Vertical, Directional, and shallow depth 700 ft TVD Horizontal).
2. Managed drilling operation in various type of well at Light Oil operation, CH Perforated, CH Liner Producer (Vertical, Directional, and 6500 ft MD Horizontal).
3. Managed daily operation of rig contractor and service company personnel in safely manner.
4. Worked with a team (Drilling Supt, Drilling Eng, Geologist and Petroleum Eng) executed drilling program in compliance with safety, environmental and government regulations, company standards, timelines, and budgets.
5. Forecasted timeline and coordinate with service companies and resource teams to deliver service, logistics and transportation for rig operation.
6. Prepared accurate Wellview drilling report.
7. Delivered Lean Sigma Project for Rig Offline Activity and Shallow Depth Heavy Oil Horizontal well.

Workover & Well Service Supervisor at PT. Chevron Pacific Indonesia
  • Indonesia
  • January 2011 to December 2011

1. Managed completion and workover operation in various type of well at Heavy Oil - EOR operation, OHGP Producer, OH Meshrite, Ventury Choke, Dual String Injector and Plug Abandon (Vertical, Directional and Shallow Depth Horizontal).
2. Managed completion and workover operation in various type of well at Light Oil operation, CH Perforated, CH Liner Producer, Water Injector, Insitu Injector, Gas well, Plug Abandon (Vertical, Directional and Horizontal).
3. Managed coil tubing and rigless operation for Well Service, Stimulation and Plug Abandon job.
4. Supervised daily operation of rig contractor and service company personnel in safely manner.
5. Worked with a team (Wellwork Supt, Completion Eng, Geologist and Petroleum Eng) executed well program in compliance with safety, environmental and government regulations, company standards, timelines, and budgets.
6. Forecasted timeline and coordinate with service companies and resource teams to deliver service, logistics and transportation for rig operation.
7. Prepared accurate Wellview Completion & Workover report.
8. Delivered Lean Sigma Initial Completion Cycle Time at Cased Hole Well Improvement.

Completion Engineer at PT. Chevron Pacific Indonesia
  • Indonesia
  • July 2008 to December 2010

1. Designed & reviewed well service, workover and initial completion program in various well types, OHGP, OH Meshrite, EOR steam injector, CH Perforated, Gas well, Oil producer, Water Injector, Water insitu injector, vertical, directional and horizontal well.
2. Designed remedial cementing program, technique and CBL evaluation.
3. Designed & reviewed fishing program & operation.
4. Reviewed stimulation program, acidizing, lateral clean up, fracturing, solvent job.
5. Champion of gas opportunity development in Sumatra, increased gas production and potentially delivered 37 BCF (6.2 MMBOE) to support internal gas supply by reactivated & converted oil/gas well.
6. Delivered Lean Sigma project for ESP field installation process.
7. Developed Management of Change (MOC) regarding safety issues during operation.
8. Developed cost estimate (AFE) and project control budget.
9. Worked in a team with Geologist, Petroleum Eng, Facility Eng, and Operation starting from Planning, Designing, Executing, and Look Back/Lesson learned the projects.
10. Involved in project planning such as material procurement, develop and review contract, rig capability and availability.
11. Facilitated RCA in engineering matter and shared the lesson learned.

Production Engineer at Kondur Petroleum SA
  • Indonesia
  • January 2008 to July 2008

1. Analyzed production figure and shared lookback.
2. Designed and supervised production well testing operation.
3. Developed and evaluated contract and tender process.
4. Developed Risk Uncertainty Management regarding safety issues during operation.
5. Controlled and monitored project as per project schedule.
6. Commissioning and start up the project and shared lesson learned.
7. Prepared Closed out report.

Operation Engineer at Kondur Petroleum SA
  • Indonesia
  • December 2006 to December 2007

1. Supervised artificial lift (PCP) maintenance program.
2. Designed and supervised several project, Gas Engine Installation, Production Well Test and Production Dewatering.
3. Developed Risk Uncertainty Management regarding safety issues during operation.
4. Controlled and monitored project as per project schedule.
5. Commissioning and start up the project and shared lesson learned
6. Prepared closed out report.

Education

Master's degree, Business Administration
  • at Bandung Institute Of Technology
  • April 2020

- 1st Chevron Best in House Student Graduates - Cumlaude

Bachelor's degree, Mechanical Engineering
  • at Sepuluh Nopember Institute of Technology (ITS)
  • July 2006

- Mechanical Engineering with Energy Conversion Major - The best academic performance at 3rd - 5th semester consecutively - The 2nd best graduation of class 2002 - Scholarship from PT. Djarum and PT. Medco Energy Oil and Gas

Specialties & Skills

Six Sigma
well control
Drilling
Workover
Completion
Presentation Skill
Microsoft Office

Languages

English
Intermediate

Memberships

Indonesia Petroleum Association
  • Member
  • January 2009

Training and Certifications

IADC WellSHARP Drilling Supervisor Level (Surface Stack) (Certificate)
Date Attended:
August 2020
Valid Until:
August 2022
IADC WellCAP Workover & Completion Supervisor (Certificate)
Date Attended:
June 2013
Valid Until:
June 2015
Drilling Fluids Technology Course (Certificate)
Date Attended:
April 2012
Valid Until:
April 2012
Sand Control: Gravel Pack & Fracture Pack (Certificate)
Date Attended:
March 2012
Valid Until:
March 2012
Lean Sigma Green Belt Training (Certificate)
Date Attended:
February 2010
Valid Until:
February 2010
Primary & Remedial Cementing (Certificate)
Date Attended:
March 2010
Valid Until:
March 2010
Completion Design (Certificate)
Date Attended:
May 2010
Valid Until:
May 2010
Drilling Bit Training (Certificate)
Date Attended:
July 2012
Valid Until:
July 2012
Basic Reservoir Engineering (Certificate)
Date Attended:
December 2011
Valid Until:
December 2011
Solid Control & Waste Management (Certificate)
Date Attended:
April 2012
Valid Until:
April 2012
IADC WellCAP Drilling Supervisor Level (Certificate)
Date Attended:
July 2012
Valid Until:
July 2014

Hobbies

  • Footbal, Golf, Bike, Travelling, Listen to the music
    - Workover team top scorrer at Chevron league 2010 - Bicycle charity participation for orphanage