PRANAY GUPTA, Assistant  General Manager

PRANAY GUPTA

Assistant General Manager

Patanjali Ayurved Ltd.

Location
India - Delhi
Education
Bachelor's degree, all subjects of civil engineering
Experience
30 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 0 Months

Assistant General Manager at Patanjali Ayurved Ltd.
  • India - Delhi
  • My current job since July 2015

PROJECT ASSIGNED: Expansion of Patanajali Ayurved Ltd. Padartha Haridwar

Civil works of Various ware house Raw Material (244X114M), Semi Finish Godown (107X210M), Finish Goods (244X114M, 100mx200m), Monocarton Building(190000sqf), PET building (130000sqf) New Administration Block (124000sqf) RCC Road works 18000sqm Water Supply, OVERHEAD TANKS 600KLD Sanitary Installation, Drainage Development Works, Internal Electrical Installations substation of 220KVand 132KV, EOTs, Mechanical Works, HVAC System, Fire Fighting, Fire Alarms System, Substation building and Under Ground Sumps, ETP5MLD, WTP40cum,

Scope: - Cost 151crs including all services & allied works

PROJECT ASSIGNED: Establishment of Patanjali Ayurved Ltd (Tezpur Plant Assam) Total covered area 5200000 sqf with various ware house, Construction of STP, 5MLD ETP, & Administration Block of 60000sqf, Road work and Parking yard 1900000sqf including all services & boundary wall, of 7.4KM including all services works and allied works, Substation 400KV, OVERHEAD TANKS 600KLDX2NOS
Scope: Value of Project is INR 579.14 cores

Role: Being as a Assistant General Manager on above Projects
Coordinating with consultants (Process Owner/internal client, Structural and MEPs) for drawing release, approvals front & payment release.
Controlling the Project as per the schedule & Cost wise
Executing the Project as per the mile stone and achieving the targets. Tracking & coordinating for Bought out item.
Coordinating with other departments (internal and external) for smooth completion of Projects. Quantity survey, rate analysis for extra item, Planning, MIS to management Conducting review meeting with site and top management for Project performance and
Costing. Controlling the VENDORS and WO as per the budget & schedule.
Coordinating for material requirement like cement, steel and BOI.
Mobilization and Demobilization of resources, budgeting as per Project requirement.
Coordination with Internal & External Departments/Clients for Structure, MEP, and Utility includes HVAC, etc. for the Projects.
Repair and Maintenance of complete Plant

MIDDLE MANAGEMENT at Shapoorji Pallonji & Co. Limited
  • India - Delhi
  • November 2007 to June 2015

PROJECT ASSIGNED: Twin Tower Residential Accommodation for AWHO, Ph-IV, Greater Noida, UP. (From 14 Apr 2011 TO 30 JUN 2015)
Client: Army Welfare Housing organization
Scope: Value of Project is 151.52 cores (Lump sum Contract).
The Project is high rise twin tower building with 298 dwelling units in 28 story blocks(S+27) and a common basement and all internal and external services. Covered area 757504 sqt
PROJECT ASSIGNED: Construction of Residential Accommodation for JP Greens (CSMC), Greater Noida, UP. (From 23 July 2012 to 13 Apr 2014)
Client: Jay Pee Green Ltd (Branch of Jai Prakash Industries Ltd.)
Scope: Value of Project is 91.21crs (Cost plus Contract).
The Project having five high rise towers with 250 units in (S+19) story blocks and one common basement along with complete structure and finishing works. Covered area 697504 sqf.

PROJECT ASSIGNED: Grand Venezia Mall, Greater Noida, UP. (From 14 Apr 2011 TO 30 JUN 2015) Client: M/s Bhasin Infotech & infrastructure Pvt Ltd.
Scope: Value of Project is 163.21crs (Item Rate).
The Project is 23 storied commercial building along with 23 stories of hotel, & 5stories Shopping MALL with three basements.
Total Covered area 30Lac.sqf

PROJECT ASSIGNED: Tata Motors Pantnagar Project (from 27 Nov’2007 to 13 Apr’2011)
Client: Tata Motors Ltd.
Scope: Construction of ACE, NANO, VENTURE Project (initial valve was 123crs but as on 31.03.2011 the value was 214.00 excluding steel and cement) (Item rate Contract)
Major quantities executed as a team leader Excavation 3.6lac cum, Backfill 9.68lac cum,
Concrete 1.56lac cum, Brickwork 0.68lac cum, Plaster(Ext.& Int.) 2.9lac sqm, VDF 0.92lac Sqm, Road work 1.81lac sqm, Pipelines 112886RMT (DWL, IEL, DEL), Strom water line 18800Rmt 50kSTP, WTP17cum, Substation 400kv, &ETP8MLD,

Role: Being as a Project Manager on above Projects
Make construction strategies to control the profit, schedule and maintain the cash flow Organize the Manpower, construction equipment & stakeholder management Monitoring the master schedule with complete safety and
Quality Maximize the usage Ratio and minimize the wastages
To mentor and lead a skilled team of engineers & managers. Organize the, specialize Agencies and vendors. Conducting review meeting with site and top management for Project performance and costing.
Close monitoring of quantity tracking.
Controlling the sub-contractor and WO as per the budget & schedule
Recipient of incentive and promotion for wastage control & Project completed in time. Coordination of services & utility includes HVAC, Electrical, and Mechanical etc. for the Project

SENIOR ENGINEER at LARSEN & TOUBRO
  • India - Delhi
  • November 2002 to November 2007

With Larsen & Toubro Limited (UNDERGROUND)
PROJECT ASSIGNED: Subansiri Lower Hydroelectric Project (A.P), India
Client: National Hydroelectric Power Corporation

Scope: The Project was executed for constructing 2000 MW Subansiri Lower Hydroelectric Project.
Role: As Senior Engineer (Civil), involved in:
Excavation (with Road Header, Rock Cutter & Water Jet) and concerting of Adit & main Tunnels
8 No’s 9.5m dia, 630 to 1145m Long Horse Shoe Shaped head Race Tunnel excavated by Road header.
Construction of 8 no 8m-diameter circular steel lined Pressure shafts excavated by raise borer. Construction of Tailrace channel of width 206m joining to river.
Tunneling as per approved construction method (NATM)
Planning, monitoring and execution of construction related activities.
Preparing actual schedule of resources required based on achieved progress.
Reconciliation of materials & quantities and billing (Client as well as subcontractors)
Preparation of subcontractor’s bills & client bill on Monthly basis

PROJECT ASSIGNED: Purulia Pumped Storage Project (900MW), West Bengal Client: Taisei Corporation Japan
Role: As senior Engineer (Tunnel), involved in:
Planning, monitoring and execution of construction related activities.
a. Excavation and concerting
b. (RCC) of Inclined (46 degree) Penstocks (273m x 2 Nos.)
c. Inclined Cable Tunnel (32 degree) 284.38m long 6.5 mtr
d. Vertical Shaft (3 m dia x 39 m).
e. Diversion Tunnel Inlet Structure (2 X 200mtr RCC).
f. Billing of the subcontractors. Quantity survey, rate analysis for extra item, planning, MIS to management
g. excavation and steel Lining for Pen stock 8 X 2.5 m dia. & 32 m deep Reconciliation of material and Bills
Preparing MIS document for RO/ HO.
Tunneling as per approved construction method (NATM)
Verify PRW bills & ensure bill realization from the client. Checking and processing of bills with reconciliation statement.

LOWER MANAGEMENT at JAI PRAKASH INDUSTRIES LTD
  • India - Delhi
  • May 1994 to November 2002

PROJECT ASSIGNED: Baglihar Hydro Electric Project (450 MW), Jammu & Kashmir
Client: Power Development Corporation of J&K
Role: As Senior Field Engineer (Civil), involved in:
Worked as an In Charge for Excavation & Concrete Lining of 12.5 km Length Head Race (11.75mtr finish) Tunnel with CIFA Gantry FORM WORKS and having end to end responsibility
Excavation and Plugging of 4 Extra Adits associated with underground structures. Planning, & Execution of All under Ground construction related activities,
Preparing monthly client bill and get certifying, including making RECONCILIATION for processing the bills preparing sub-contractor bills, Preparing of DPR on daily basis to submit to RO/HO

Education

Bachelor's degree, all subjects of civil engineering
  • at UTTAR PRADESH TECHNICAL UNIVERSITY
  • July 2009
Diploma, diploma in civil engineering
  • at K.L.POLYTECHNIC ROORKEE
  • May 1994

Specialties & Skills

Stakeholder Management
Rate Negotiation
Leadership
Construction Management
Project Management
PROJECT MANAGEMENT
TEAMBUILDING
LEADER SHIP
M S PROJECT
vendor management