Experience
36 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :36 years, 3 Months

Freelance Technical Advisor at Different companies
  • Bangladesh - Dhaka
  • My current job since October 2017

Provide technical support and design guidance’s to the various companies like Tao and Tao Consultants, Adobe Consultants, Beximco Engineering and various private entities for their various projects like Road & Bridge projects, 5-star Hotel complex, Glass factory, Housing complexes etc.

Structural Engineer (International) at EGIS International
  • Bhutan - Phuntsholing
  • March 2019 to March 2021

The project involves development of Bhutan’s largest commercial and industrial town Phuentsholing. The project will provide protection from floods and erosion, and construct smart urban infrastructure to allow phased urban expansion. A modem township will be developed on sustainable principles of equity, livability, and competitiveness, and it will be integrated into the fabric of the existing municipality and preserve Bhutan's unique architectural heritage. The project will also protect the existing and new town from floods and riverbank erosion which currently threatens lives and livelihoods and disrupts connectivity with nearby communities. The new township development also provides space for public services such as health facilities and schools, and commercial businesses. This will contribute to expansion of the country's services sector and diversify the economy from heavy reliance on hydropower.
Responsibilities include reviewing and advising on, and undertaking if necessary, stability calculations, the reinforcement, detailing for all structures to be constructed under the project in Phase 1 and planned in Phase 2. Structures include, concrete diaphragm walls, drainage culverts, elevated water retaining structures, river crossing road bridges etc.

Bridge / Structural Engineer (International) at Renardet S.A.
  • Philippines
  • October 2016 to September 2017

Consulting Services for the Detailed Engineering Design and Tendering of Projects under Asset Preservation and Road Improvement Components of the Road Improvement and Institutional Development Project (RIIDP) in Philipines.
The Government of the Philippines has received a loan from the ADB for the Road Improvement and Institutional Project (RIIDP), co-financed by the OPEC fund for International development (OFID). The components of the project are a) Asset Preservation (AP) which includes Civil Works of 9 road sections along 8 national roads located nationwide with a total length of about 255km, Detail Engineering Design (DED) for road section with total length of about 16.421km, Construction Supervision (CS) of 9 road sections, DED and tendering for 6 road sections located nationwide with a total length of about 366km, b) Road Improvement (RI) which includes DED and tendering for 8 road sections located nationwide with a total length of about 482km of which two road section need extreme rehabilitation / improvement instead of simple AP only and, c) Institutional Capacity Development (ICD).
As an international Bridge / Structural engineer responsibilities include co-ordination of investigation of existing bridge conditions, data and information collection and leading a design team of ten members in order to make detail engineering design of about 100 new bridges of short to long spans throughout the project areas.

Bridge Specialist / Structural Engineer (International) at Tera International Group, Inc.
  • Azerbaijan
  • February 2016 to August 2016

Consulting Services for Azerbaijan Second Road Network Development Program, Tranche 2: Construction Supervision of the Alat-Astara Highway, Jalilabad Intersection to Shorsulu Intersection (km 110+700 to km 80+600)
The Government of the Republic of Azerbaijan has requested the Asian Development Bank to provide financial assistance for the Second Road Network Development Investment Program under the proposed Multi-tranche Financing Facility (MFF). Part of the funding under the MFF is used for construction of the Alat - Astara Highway, from Jalilabad Intersection to Shorsulu Intersection. The consulting services are involve review of detailed design and approval of good for construction drawings, certification of all the works under the civil works contract for quality and quantity, civil works contract administration, and benefit monitoring and evaluation.
As an international bridge specialist / structural engineer, reviewed the detail design of bridges, underpasses, flyover, box culverts and other structures within the project (total 296m). Rendered guidance’s, instructions to the contractor for adjustment in the design and construction works of the bridges and structures as required. Supervised the day to day construction of the structures based on sound international practice. Assisted team leader in the preparation of inception report, monthly progress reports, alternate developed design and construction guideline reports and in the process of approval of design and construction of the structures etc.

National Transport Advisor (Structure) at Dhaka Transport Co-ordination Authority
  • Bangladesh
  • March 2014 to May 2015

Advise DTCA on planning and policy issues on urban transport sector for greater Dhaka area.
Advise Project Director of CASE project to manage the consultancy service of Bus network design study and detail design of BRT line 3, and other transport studies as needed including monitoring the timelines of execution, reviewing reports to ensure quality of the deliverables. Prepared feasibility study report along with detail structural design, quantity and cost estimate of a tunnel of length 1050m at Kakrail location which was initially proposed as flyover and the report is accepted by World Bank. Contribute major role in fixing criteria for topographical & utilities survey, geotechnical investigations, design criteria and review of structural design of a flyover of length 2150m and a tunnel of length 1050m along with numbers of other bridges, culverts, BRT bus stations, depots, terminals, underpasses and foot over bridges to access BRT stations under the project. Coordinate tasks with other members in the DTCA.

Senior Bridge Design Engineer at Dev Consultants Ltd.
  • Bangladesh
  • February 2013 to December 2013

Project : Eastern Bangladesh Bridge Improvement Project (Institutional part).

The institutional part of the project involves review of the existing Bridge Maintenance Management System (BIMMS), Review of RHD Bridge Condition Survey Manual, Improve design of Bridge Condition Survey (BCS) forms, Inventory and Condition survey of 4509 bridges and establishing Bridge maintenance standard and bridge maintenance manual. Responsibility included full co-ordination of technical part of the above matters and assisting Team Leader. The project was funded by JBIC.

Senior Structure and Bridge Design Engineer at Euroconsult Mott MacDonald
  • Bangladesh
  • July 2012 to February 2013

Project : Sustainable Rural Infrastructure Improvement Project. Bangladesh.

The project is undertaking by the Local Government Engineering Department and financed by the Asian Development Bank. The project involves selection of roads which need to be developed at 21 districts of 3 divisions in Bangladesh, identify probable bridges and culverts to be constructed, replaced or repaired on those selected roads, preparation of selection criteria for important rural roads and structures on rural roads, selection of Growth center markets & jetties for development and construction. As a Sr. Structural Engineer of the Project responsibilities include to select probable new bridges and culverts & identify damaged structures which needed to be replaced within the project area; making of detail structural design of bridges whose probable total length is 3273m. The total allocation for the project is US$ 109million.

Wharf and Bridge Design Engineer at Sinclair Knight Merz, Australia
  • Australia
  • November 2011 to May 2012

Project : Transport Sector Development Project, MID, Solomon Island.

A consolidated CPIU established within MID’s existing Transport Infrastructure Management Services Department. The responsibilities of the CPIU are implement and manage all transport sector activities, whether funded by the Project or other resources. The CPIU is staffed by existing MID personnel and supplemented by consultants to provide the required expertise to implement the NTP. The Project also undertakes a range of capacity development initiatives for MID staff through coaching and on the job training.
Responsibilities included carry out scoping work of the sub-projects; carry out feasibility studies with respect to engineering, investigation and engineering design of wharves, bridges and other structures. Responsibility included making of condition inventory of 37 Wharves and 26 Bridges. Recommended necessary action to be taken for the wharves, prepare design criteria, preliminary design, design reports, technical specifications, BOQ and detail cost estimates for 10 major bridges (total length 579m) and other structures and also capacity building of the existing MID engineers.

Senior Structural Engineer at Hifab International AB
  • Bangladesh
  • August 2011 to September 2011

Project : South-Western Bangladesh Rural Development Project. Bangladesh

Was responsible for planning, structural design and drawing preparation of 484m bridge over Arial Khan river at Sadar, Madaripur,

Design Engineer. at MCCC (No-4)-SEL-UDC JV.
  • Bangladesh
  • May 2011 to July 2011

Project : Operation & Maintenance of 4800m long Bangabandhu Bridge over river Jamuna.

The project involves operation and maintenance of 4.8km long Bangabandhu Bridge over river Jamuna at Bhuapur, Tangail. Responsibility included making of guideline for Bridge Health Monitoring and supervise the whole monitoring activities includes cracks appeared on the deck slab of the bridge. But as the operator failed to make arrangement for installation of sensors required for health monitoring, left the project.

Senior Construction/Design Specialist at Bangladesh Bridge Authority, Ministry of Communication.
  • Bangladesh
  • February 2011 to May 2011

The project involved land development, construction of resettlement satellite town for the effected people at Bakherkandi (southern end of proposed 6.15km span Padma Bridge) which includes 529plots with all urban facilities like internal paved roads, connecting bridges, school buildings, power substation, mosque, market, medical centre, community centre, water supply, drainage and sanitation systems etc. As a Senior Construction Specialist duties include final checking quality of design, drawings and documents, overall construction management, supervision of civil works, checking of technical specification, final bill of quantities, tender documents of the contract, preparation of monthly progress, statement of completed work etc.
As an additional duty, planned and designed of all structures like school, mosque, madrasa, community clinic, community centre, market of new resettlement site near Janjira construction yard.

Senior Structural Engineer at DevConsultants Limited
  • Bangladesh
  • January 2009 to February 2011

From May 2010 to 7Feb 2011, (9 months)
Project: Eastern Bangladesh Bridge Improvement Project.
Client: Roads and Highways Department
Funding Agency: Japan Bank for International Co-operation.
Consultant: Oriental Consultants Co. Ltd (Japan), CES Pvt. Ltd (India), DevConsultants Ltd (Bangladesh).
Position in the Project: Sr. Bridge Engineer.

The project involved replacement of 68nos existing old, substandard, deteriorated and damaged bridges by new standard bridges (total length 3484m) at the eastern part of Bangladesh which includes Dhaka, Chittagong and Rajshahi division. Responsibilities included assesing and selecting the damaged structures, collection of field datas required for structural design, fixing bridge geometry, design criteria, bridges length and span arrangement, structural design of the bridges.


From Jan 2009 to April, 2010, (17 months)
Project: Road Network and Improvement Project - II
Client: Roads and Highways Department
Funding Agency: Asian Development Bank.
Consultant: Roughton International (UK), DHV BV (Holland), DevConsultants Ltd (Bangladesh), Desh Upodesh (Bangladesh).
Position in the Project: Sr. Bridge Engineer.

The project involved implementation of construction, rehabilitation, reconstruction and improvement of the existing damaged roads and road drainage structures in Dhaka, Chittagong and Rajshahi Zones. Responsibilities include review, redesign and construction monitoring of bridge and other drainage structures of the project which includes 12 bridges (total length 600m) and culverts of different arrangement.

Senior Structural Engineer at BST Gulf, UAE
  • Other
  • May 2008 to November 2008

As a Senior Structural Engineer responsibilities included checking of design of structures and coordination of projects.

Activities performed:
Checked structural design of 150m VVIP and 90m Horses Tunnel under Proposed Development and Construction of the New Training Tracks 1 at Nad Al Seba, Dubai, Parcel ID 600-7589 project for Meydan LLC and made comments on design and suggested for necessary revision.
Checked structural Design of 6storied club house and multipurpose hall at Tangier, Morocco.
Worked as an Infrastructure Design Coordinator of Proposed Meydan City Development and Construction at Bu Kadra, Dubai, Parcel ID 611-122 project for Meydan LLC, which includes 7nos prestresses box girder bridges (total 285m), Tunnel, Roads and Retaining walls etc. Responsibility included co-ordination of data collection, conceptual design of bridges and monitoring of works done by the sub-consultants.

Reason for leaving this job: United States immigration visa issued on Nov’08. To keep alive immigrant status amicably discontinued contract with the employer. Visited united states to get green card and returned back to home country.

Senior Structural / Bridge Engineer at ACE Consultants
  • Other
  • August 2006 to April 2008

Emergency Disaster Damage Rehabilitation Project.
Bridge Design Engineer-1
Made structural design of 6nos bridges of total length 344m.

Bangladesh Railway Sector Improvement Project
Senior Bridge Design Engineer.
The project involves doubling of the Tongi-Bhairab Bazar down line (64km) with the existing Meter Gauge line together with upgraded signaling, with embankment and bridges conforming to the Broad gauge Main Line Standards. As a short time Consultant duties involved checking of existing superstructure drawings supplied by the Bangladesh Railway (BR) and making of a report about the drawings whether those are structurally sound to use for the new structures or not .

Consultancy Services for Design and Construction Supervision for Rehabilitation of Phase-II Roads, Package-B, Chattishgarh State Road Sector Development Project in India.
Deputed as Senior Design Engineer for SMEC India Pvt. Ltd.
The project involved upgrading the State highways from 1lane to 2lane and assessment of the existing road and road drainage structures for rehabilitation, improvement and reconstruction in Chattishgarh, India. The project is undertaking by the Public Works Department, Chattishgarh and financed by ADB. Responsibilities included guide the local engineers to finalize the structures need to be reconstructed or widened and to fix the proper structure locations, opening required for each structure, span arrangement, finished road level at structure location and founding levels for the 78 nos. structures (total length 1565m) of the project.

Chittagong Port Trade Facilitation Project
Senior Design Engineer.
As a Senior Design Engineer responsibilities include to organize the collection of information necessary for design, determining the best suitable alignment, selection of suitable structural system and making detail design of the 978.05m long elevated roadway and 63.15m elevated bridge at nearby service road.

Senior Design Engineer at Development Design Consultant
  • Bangladesh
  • May 1999 to July 2006

Road Network Improvement and Maintenance Project-1
Senior Design Engineer
Made review and redesign of 7nos bridges (352m) as per comment of the Roads and Highways Department on preliminary design.

Emergency Flood Damage Rehabilitation Project
Bridge Design Engineer
Made inventory of structures (bridges/culverts) damaged caused by floods, structural design, drawing preparation and quantity estimate of 61nos RCC and PSC bridges (2286m) and numbers of Culvert.

Consultancy services for detail engineering design and construction supervision for Dapdapia Bridge over Kirtonkhola River on Barisal- Patuakhali road.
Sr. Design Engineer at Dhaka office
As a member of design team designed 1330m bridge over Kirtonkhola River.

Bridge Replacement Project
Sr. Bridge Design Engineer
Duties involved design of bridges & culverts (total span 364m) on National & Regional highways in Barisal zone.

Project Preparation Consultant Services for Rural Transport Improvement Project.
Sr. Structural Engineer
made detailed structural design of 398nos (Total span=1160m) selected structures.

Detail Design of KEANE Bridge over river Surma at Sylhet.
Sr. Structural Engineer
Designed 2 parallel (each 304m long & 2 lane) bridges (named KEANE Bridge) over Surma River at Sylhet.

Feasibility Study and Detailed Design of 3 Nos. Bridges under
KFAED financing
Bridge Design Engineer
TAs a member of design team designed (i) 708m 3rd Buriganga Bridge at Bashila (Simply supported PSC Box girder type), (ii) 1072m 2nd Shitlakhya Bridge at Demra and (iii) 1590m Dhaleswari Bridge at Muktarpur

The Study on Construction of the Bridge over the River Rupsa in
Khulna (Phase II)
Bridge Design Engineer
Duties involved structural design of superstructure & substructure 1360m bridge and two canal bridges of 90 m & 30m at 12km-approach road.

Flood Damaged Restoration Project
Bridge Design Engineer
Designed 11nos. RCC and Prestressed bridges of total length 391m.

Design Engineering Consultant at Transtec, Arcadis Bowinfra, Femconsult (Join Venture)
  • Bangladesh
  • January 1998 to May 1999

Project : Integrated Food Assisted Development Project.
Position : Design Engineering Consultant
The Project was designed to integrate food-aid with financial resources and technical assistance. Duties involved planning, structural design, drawing preparation, bar bending schedule and quantity estimate of 22 nos. RCC and Prestressed bridges of total length 710.5m for the Growth Center Connecting roads (GCCR) at different places in Khulna and Rajshahi division. Also involved conducting training course on analysis and design of bridge and on AutoCAD for engineers of LGED. The project was undertaken by the Local Government Engineering Department and financed by European Commission.

Design Engineer / Dr. Design Engineer at Development Design Consultant
  • Other
  • August 1994 to January 1998

Second Rural Roads and Markets Improvement Projects
Sr. Bridge Engineer
Duties involved structural design, preparation of drawings, cost estimate, bar-bending schedule of 20 nos. bridges of total length 320m on Feeder Roads type “B” at different places in Bangladesh. The Project was undertaken by the Local Government Engineering Department and financed by World Bank.

PL-480, Large Bridges and Culverts Project, Title-III
Sr. Design Engineer
Duties involved planning, structural design, drawing preparation, bar bending schedule and quantity estimate of 56 nos. RCC and Prestress bridges of total length 3645m at different places in Bangladesh. Responsibilities also included construction monitoring and provide engineering solution of construction difficulties which arose during the period of construction. The project was undertaken by the Local Government Engineering Department and financed by USAID.

Review and Redesign of Road Structure Manual
Sr. Structural Engineer
As a senior member of design team was responsible for structural design, preparation of drawings, cost estimate, bar bending schedule of about 1100 components of road structures which includes superstructures of Slab & T-Beam Bridge of different length with different loading and their substructure of different height with open and pile foundation, culverts of single to multiple cell with different arrangements, width and loading etc.

PL-480, Large Bridges and Culverts Project, Title-III
Design Engineer
Duties involved planning, structural design, drawing preparation, bar bending schedule and quantity estimate of 120 nos. RCC and Prestressed bridges of total length 7230m at different places in Bangladesh.

Design Section of DDC Ltd.
Design Engineer
Designed Bangladesh Bank Building at Barisal.
Designed 3nos Laboratory buildings of Bangladesh Soil Resource Development Institute at Comilla, Rajshahi and Khulna.

Design Engineer cum Programmer at The Designers Collaborative Ltd.
  • Bangladesh
  • June 1991 to July 1994

Worked as a Project Manager for the construction of Training & Resource Center Complex at Madaripur for Madaripur Legal Aid Association. Was responsible for structural analysis and design of structures and overall management of the projects.

Worked as a Project Engineer for the construction of 8 storied Head office building at Dhaka, 2 storied Regional office building at Khulna, Steel trussed Silk industry complex at Modhupur, 16nos School building at different places in Bangladesh for CARITUS, Bangladesh. Was responsible for structural design, drawing, estimate, preparation of tender documents, tendering, overall construction supervision of all structure.

Also worked as a Design Engineer-Programmer and was responsible for design of structures of all projects undertaken by the organization and to develop computer software for structural analysis and design.
Was responsible for structural design of 8nos. RCC simply supported and balanced cantilever bridges at different places in Tangail and Mymensingh district for GCCR Appurtenant Structure Scheme for LGED financed by WFP. The total length of the bridges was 290m.

Was responsible for structural design of 9 nos. simply supported Bridge and 4 nos. Culvert at different places in Chittagong division for Directorate of Relief and Rehabilitation under FFW structure program (FY 1989-91). The project was financed by US AID and the total length of the bridges and culverts was 257m.

Designed 3nos. RCC simply supported and balanced cantilever bridges at Manikgonj and Nawabgonj for LGED under Large Bridges and Culverts Project as turnkey basis in association with Mostafa & Associates Ltd. The total length of the bridges was 189m.

Made structural design of seven storied garments building at Kalabagan. About 20 nos. residential buildings were designed at different places in Bangladesh for individual clients.

Junior Engineer at Prakalpa Upodeshta Ltd.
  • Other
  • January 1988 to April 1991

Worked as an Office Engineer in USAID FFW Structure Program (FY. 1988-90, 1987-89) of DRRB From September 1, 89 to April 30, 91. During the period render all assistance to the Project Manager in preparing monthly progress reports, checking bills etc., also responsible for preparation of quantity estimates, bar-bending schedule, checking of structural drawings.

Worked as a Site Engineer From January 1, 88 to August 31, 89. Was responsible for construction supervision of 45m bridge and 60m bridge at Dhamrai & Sharishabari respectively under USAID FFW Structure Program (FY. 1986-88) of DRRB.

Site Engineer at Prakaushali-O-Nirmata Ltd.
  • Bangladesh
  • December 1986 to December 1987

Worked as a Site Engineer and responsibility was to supervise the construction of Residential building complex & other ancillary facilities for BAARI Regional Office at Hobigonj under CIDA assistance.

Education

Bachelor's degree, Civil Engineering
  • at Institute of Engineers, Bangladesh
  • September 1986

Specialties & Skills

Computer programming
Structural Design

Languages

English
Expert

Memberships

Institution of Engineers
  • Fellow-5255
  • January 1990

Training and Certifications

Diploma in programming with Fortran (Certificate)
Date Attended:
February 1990
Valid Until:
March 1990