Insulator
Abu Dhabi Ship building
مجموع سنوات الخبرة :15 years, 5 أشهر
• Insulation of all sizes of pipes, drums, exchanger, vessels that needs to be insulated from low temperature up to the last highest temperature and depending on the materials specifications.
• Preparation of the insulation materials will be kept in a safe and proper place and to avoid back jobs.
• Layout of insulation and sheet metal at site are done with a good quality for longer term purposes.
• All joints of sheet metal are properly sealed with a metal sealant so that evaporation of the moisture of the temperature are controlled.
• Insulation of turbines form first layer up to the last layer regarding the specification required.
• Insulation of power plant units are in form of a duct work so mostly of the installed are flat slab insulation.
• A plain GI sheets metal cladding for pipelines and a corrugated GI sheet materials for boiler unit.
Layout and installation of lagging pads.