Bahri SAVCI, Area Manager

Bahri SAVCI

Area Manager

DOGUS ONUR JOINT VENTURE

Location
Qatar
Education
Master's degree, Design and Construction Management
Experience
30 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :30 years, 8 Months

Area Manager at DOGUS ONUR JOINT VENTURE
  • Qatar - Doha
  • My current job since October 2017

POST: Al Rayyan Road Project P007 C2 R5 Area Manager - Responsible to the Project Directorate

Field of activities and experience:

All construction activities of Roundabout - R5 including
Totally 736 meters length and 2x4 lanes of two post-tensioned bridges, Totally 580 meters of reinforced earth walls and 290 meters of retaining walls,
Totally 932 meters length and 2x4 lanes of Vehicle Underpass,
Totally 100 meters of Pedestrian Underpass
Totally 39.130 meters of pressurized and non-pressurized utilities including 131 items of chambers and substations. The total cost of this Package exceeds 302.000.000 USD. (Total project Value is 1.205.000.000 USD)

Site Manager at BECHTEL - ENKA JV
  • Georgia
  • April 2015 to June 2016

POST: Site Manager - Responsible to the Project Manager
Field of activities and experience:

Georgia section of South Caucasus Pipeline Expansion (SCPX) Project.
Fulfillment of the Early Works and Temporary Site Facilities as full Package scope in the main contract. The total cost of this Package exceeds 205.500.000 USD.

Department Manager at ÇAMLICA CONSTRUCTION COMPANY (KAR GROUP)
  • Türkiye - Ankara
  • January 2004 to April 2015

POST: Department Manager - Responsible to the General Manager

Field of activities and experience:

Hydroelectric Power Plant (HEPP) Projects:
• Construction of gravity water conveying systems and penstock installations (GRP and steel) including weir and head pond (excluding electro-mechanic applications) in HEPP Projects. Generally penstock installations are between 700 mm and 2000 mm in dia. and gravity water pipelines between 1800 mm and 3300 mm.
The names and the locations are; Defne HEPP (Duzce), Ilkenerji HEPP Projects (Sinop), Kaletepe HEPP (Erzurum) and Sirakonaklar HEPP (Erzurum). The total cost of these projects exceeds 119.700.000 USD.
• Construction of gravity water conveying systems of 26 HEPP Projects. The total cost of these projects exceed 85.800.000 USD
Highway Projects:
• Construction of all drainage works including stormwater, pipe culvert and box culvert systems of 9 city pass projects, 4 highway projects and 7divided road projects belong to the General Directorate of Highways in Turkey and other international road projects in abroad. The total cost of these projects exceeds 34.600.000 USD.
Stream Rehabilitation Projects:
• All construction and civil works of stream rehabilitation system in Iraq-Erbil. The total cost of these project exceeds 8.300.000 USD

Department Manager at NOVAPLAST PLASTIC INDUSTRY INC.(KAR GROUP)
  • Türkiye - Istanbul
  • August 1996 to January 2004

POST: Department Manager - Responsible to the General Manager

Field of activities and experience:
In-house Projects:
Construction of Vesbo manufacturing factory located in İzmit - Kullar and Nigde. The total cost this projects exceeds 31.100.000 USD
Organized Industrial Area Projects:
• Construction of storm water and sewerage systems of 7 Organized Industrial Area in Turkey. The total cost of these projects exceeds 17.400.000 USD
Urbanization Projects:
• Construction of partial sewerage systems in 8 Metropolitan Municipality in Turkey. The total cost of these projects exceeds 19.200.000 USD.

Project Manager at ER-YA CONSTRUCTION COMPANY
  • Türkiye - Ankara
  • June 1992 to August 1996

Post: Project Manager

Field of activities and experience:
• Rehabilitation of Siyavuşpaşa Stream, Bakırköy Municipality and all temporary and accurate calculations thereof. The total cost of these projects exceeds 7.200.000 USD.
• Construction of Selçuk - Pamucak (T. R. Minister of Tourism, Bank of Development, South Mediterranean Project) Potable Water Project together with pumping stations, water supply, water tanks and water networks, the total cost of these projects exceeds 7.300.000 USD.
• Construction of Muğla - Sarıgerme (T. R. Minister of Tourism, Bank of Development-South Mediterranean Project) waste water collector and discharge systems after waste water treatment as well as pumping stations and all kind of financial calculations thereof. The total cost of the project exceeds 4.600.000 USD.
• Construction of Antalya - Belek (T. R. Minister of Tourism, Bank of Development-South Mediterranean Project) waste water collector and discharge systems after waste treatment as well as pumping stations and all kind of financial calculations thereof. The total cost of the project exceeds 9.700.000 USD.
• Construction of İller Bankası Kars - Merkez Potable Water Project together with pumping stations, water supply, water tanks and water networks. The total cost of the project exceeds 27.200.000 USD.

Education

Master's degree, Design and Construction Management
  • at Istanbul University, Business Administration Institute Istanbul
  • July 1992

Istanbul University, Business Administration Institute gives master's degree and management abilities to the Engineers.

Bachelor's degree, Civil Engineering Technology and Construction
  • at Istanbul Technical University
  • June 1991

Istanbul Technical University is one of the third most prestigious university in Turkey, especially in engineering science.

Specialties & Skills

Pipeline Building
Construction Management
MICROSOFT WORKS
NETWORKING
FINANCIAL
GENERAL MANAGEMENT
MICROSOFT WINDOWS 2000
RESEARCH
AUTOCAD
BRIDGES
ENTRENAMIENTO

Languages

English
Intermediate

Training and Certifications

IOSH Managing Safely (Training)
Training Institute:
Kaya Safety
Date Attended:
March 2018
Duration:
22 hours