Gerry  Zapata, Site Engineer

Gerry Zapata

Site Engineer

MUNICIPALITY OF SAN PASCUAL

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Industrial Engineering
Experience
11 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 5 Months

Site Engineer at MUNICIPALITY OF SAN PASCUAL
  • Philippines
  • March 2017 to August 2017

Community Based Monitoring System Accelerated Poverty Profiling
* Project Role:
Act as a Field Editor who received data which was being analyzed,
edited, organized and send to the data based for compilation of
gathered data. Organize meeting to update status and provides
planning that will be basis in the creation of program for the
municipalities. Prepares reports and documentation for historical
data and directly reports to the Municipal Admin and planning
department of the Municipality.

HUC Engineer at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Angola
  • July 2015 to November 2016

The Mafumeira Sul project offshore
Angola involves the design, fabrication and installation of five new
platforms. Located 15 miles (24 km) offshore Cabinda province in 200 feet
(60 m) of water, the $5.6 billion Mafumeira Sul project is the second stage
of development of the Mafumeira Field located in Block 0. The project
scope includes 50 wells, two wellhead platforms, a central processing and
compression facility and approximately 75 miles (121 km) of subsea
pipelines.
Main contractor is Daewoo Shipbuilding & Marine Engineering
(DSME) with the client of CHEVRON
* Project Role:
HUC ENGINEER TO SITE SUPERVISOR
Prepares schedule and coordinates assigned engineering work,
acting as technical adviser on subcontractors, crafts people by means of
reviewing drawings received from clients ensuring all materials used and
work performed are as per project specification on Mechanical Discipline.
Acting supervisor in the final stage of the construction phase to hand
over remaining equipment to the commissioning stage and clear out all
punch items and remaining work including the power turbine and gas
generator installation.

Quantity Surveyor at Atlantic Gulf & Pacific Co of Manila (AG&P)
  • Korea (South)
  • August 2014 to March 2015

Project overview:
Prepalnning team mobilize to DSME korea prior to HUC stage for palnning and preparation of material and tools.
Project Role
Involve as Quantity surveyor to Prepares work volume, job register, manhour estimate and histogram.

Site Supervisor at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Philippines
  • March 2013 to July 2014

Fabrication and construction of LNG plant located in Curtis Island
Gladstone in Queensland Australia consist of 2 trains equivalent to 111
modules-ISBL (cryogenic, chiller and propane) and OSBL module.
Construction site is at the Batangas Heavy Fabrication Yard located in
Batangas Philippines under the management and supervision of BECHTEL
INTERNATIONAL INCORPORATED Projects.
* Project Role:
Act as a SITE SUPERVISOR responsible for monitoring and
supervising construction operation which consist of scheduling work as per
priority requirement & material availability, review and assessment of crafts
accomplishment and ensures that plans are executed according to target
goal as well as dealing with the clients requirement at site. Maintains and
ensure compliance with the company core values and Zero accident policy.

Site Supervisor at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Australia
  • July 2011 to November 2012

GORO NICKEL project New Caledonia. Production of nickel and
other minerals was already ongoing when there is incident that most of the
tank does not function properly due to design and actual operational
situation. Team was mobilize to repair, reconstruct and install latest design
as per project specification and recommendation. The nickel plant was live
and operational at that time that requires permitting to penetrate and
execute work. The project was under management of Vale Inco group.
* Project Role:
Act as a SITE SUPERVISOR on area 250, 260, 270, 290, responsible
for execution of the reconstruction of damaged facilities, installation of
additional platform and extension of the processing plant. Act as a
modification team to determine the site requirement during operation and
ensure all as built is successfully constructed to meet the design standard
during operational stage. Maintains and ensure compliance with the
company core values and Zero accident policy.

Project Supervisor at BILFAL HEAVY INDUSTRIE Jubail Industrial City
  • Saudi Arabia - Jubail
  • August 2010 to January 2011

Design, manufacture, fabrication and supply of pressure vessel,
reactors, spheres, storage tank, high and low pressure piping, evaporators,
construction and assembly of storage tanks, spheres, onshore and offshore
modules and structure.
* Project Role:
As a PROJECT SUPERVISOR assigned on project basis usually
performs supervision and monitoring of construction, assembly and
installation of piping, structural and mechanical works ensuring that the
scope of work is being deliver at the right quality and time. Implementation
of safety among work groups and resolve issue concerning work and
personnel.

Site Engineer at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Philippines
  • August 2009 to August 2010

Prepares schedule and coordinates assigned
engineering work, acting as technical adviser on subcontractors, crafts
people by means of reviewing drawings received from clients ensuring all
materials used and work performed are as per project specification on both
Structural and Piping Discipline.

Site EngineerS/Supervisor at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Australia
  • July 2007 to December 2008

GORO NICKEL project New Caledonia . Installation and Assembly
of the modules, pipe racks, equipment and all accessories to establish the
Goro nickel mining plant in New Caledonia. This also includes hook up and
commissioning up to the operational stage.
* Project Role
Scheduling, technical adviser on subcontractor and craftsmen, monitor ans supervise construction operation.

Site Engineer at ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P)
  • Philippines
  • August 2006 to June 2007

Modularization of GORO Nickel Processing Plant in New Caledonia
consisting of 283 Pre-assembled Module Units - PAUs, Pipe racks (PARs),
Steam Condenser Tanks, Waste Heat Boilers (repair works), Overland
Conveyors (wharf and stockyard); Structural and Piping Stick built; Built-up
Sections; Process Equipment, Bulk Storage Tanks; Pipe Spools, Piping
Pre-fabrications (CS, SS, Duplex/Super Duplex SS). Shop/Detailed
drawings, engineering, partial supply and full supply of materials and other
tertiary items, material management (free issues), fabrication, surface
preparation and painting, yard erection, insulation, galvanizing,
testing/inspection (with PED compliance for CE markings of tanks), pre-
commissioning, export packing and crating, and load out FAS AG&P
marine bulkhead/pier.
* Project Role:
SITE ENGINEER
Prepares schedule and coordinates assigned engineering work,
acting as technical adviser on subcontractors, craftspeople by means of
reviewing drawings received from clients ensuring all materials used and
work performed are as per project specification on both Structural,
Mechanical and Piping Discipline.

Technical Trainer/QC Inspector at MECHATRONICS ASSEMBLY INCORPORATED
  • Philippines
  • July 2004 to July 2006

Manufacture/Assembly of Photocopier machine, Fax machine
directly supplied to PANASONIC incorporated.
* Project Role
Prepares training program, trains newly hired employee, conducts seminar and performs quality control inspection.

Education

Bachelor's degree, Industrial Engineering
  • at University of Batangas
  • April 2003

BACHELOR Of Science in Industrial Engineering

Specialties & Skills

Management
Planing
Navisworks
Microsoft Office Applications
CUSTOMER RELATIONS
MATERIALS MANAGEMENT
MECHANICAL
MICROSOFT WORKS
PERSONNEL
PROGRESS
QUALITY CONTROL
SCHEDULING
SPECIFICATION

Languages

English
Expert