Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
HAKAN KIRCAL, SURVEY MANAGER

HAKAN KIRCAL

SURVEY MANAGER·TASYAPI-KORFEZDENIZ CONSTRUCTION

Türkiye

Bachelor's degree, Cartography And Surveying Engineering

Work experience

Total years of experience: 24 years, 4 months

SURVEY MANAGER

February 2021 - August 2021

TASYAPI-KORFEZDENIZ CONSTRUCTION

Sremska Mitrovica, Serbia

February 2021 - August 2021

TAŞYAPI CONSTRUCTION- KORFEZDENIZ CONSTRUCTION KUZMIN-RACA HIGHWAY PROJECT SURVEY MANAGER SR. RACA/SERBIA
CONSTRUCTION OF 2 REINFORCED CONCRETE BRIDGE PIER IN THE SAVA RIVER AND THE COFFERDAM STRUCTURE MADE OF STEEL PIPES FOR WATERPROOFING
Obtaining precise 3D coordinates by measuring and calculating the ground control (point of reference) points built on the riverside so that we can make precise point applications of the reinforced concrete bridge piers and the cofferdam structure in the field. Periodically checking the location of the ground control points and updating the coordinates due to daily, weekly and monthly elevation changes in the river water
As a result of the examination of the Kofferdam structure and the bridge piers, the determination of their location in the river and the preparation of detailed existing level plans of the river bottom by making bathymetry measurements in these regions.
Examining the projects of the cofferdam structure and reinforced concrete bridge piers to be made of steel pipes with a diameter of 82 cm and preparing the application projects and 3D application coordinates for the application in the field by 3D positioning
Applying the coordinates of the Kofferdam pipes to the field, making the applications of the pipes in 3D, taking the asbuilts of the pipes, and processing the final status of the pipes into the project and reporting on the final application status to the relevant units
By placing reflectors in the appropriate places of the steel pipes on the 4 sides of the Kofferdam structure, daily 3-dimensional monitoring of the deformation movements in the pipes and sharing them with the relevant units by making reports
Making the foundation excavations of the bridge piers and controlling the excavation level by making bathymetry measurements at regular intervals during the excavation and bringing the excavation to the project excavation level and making it ready for lean concrete casting
Making the necessary volume calculations in Autocad Civil 3D program from the 3D bathymetry measurements before and after the excavation we made on the river bottom, calculating the excavation amount and sending the report to the relevant units
After pouring some of the lean concrete and draining the river water in the cofferdam structure, the missing lean concrete is poured, the 3 dimensional coordinates required for the construction of the reinforced concrete foundation and piers of the bridge are prepared and applied to the site sensitively, ensuring that the bridge piers made in suitable location for the project
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level, GPS) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY MANAGER

November 2019 - July 2020

ITINERA-POLATYOL

Al Jahra, Kuwait

November 2019 - July 2020

ITINERA-POLATYOL CONSTRUCTION RA-243 MOTORWAY PROJECT SURVEY MANAGER KUWAIT CITY/KUWAIT
CONSTRUCTION OF ALL INFRASTRUCTURE AND SUPERSTRUCTURE OF THE KUWAIT RA-243 MOTORWAY PROJECT
Establishing a sufficient number of ground control (point of reference) points along the route where the highway will be built, calculating their 3D coordinates with GPS and other measurement and calculation methods, and checking these coordinates on the ground
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of the field existing ground levels and existing details with sufficient width and as a base for all projects, with the field measurements and office works, drawing the cross-section and profiles of the route where the highway will be built.
Preparing the 3D application coordinates required for the field application after examining all the infrastructure, superstructure and art structures projects to be made in the project, checking and approving their compliance with the data and details in the Tender projects
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
The volume calculations of the excavations and fillings made in all infrastructure and superstructures in the project are calculated in the Autocad Civil 3D program with the information coming from the measurement studies made on the project and in the field and transmitted to the relevant units for progress payment
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Lecel, GPS) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SENIOR SURVEY CHIEF

September 2018 - November 2019

TEKFEN-TURQUOISE CONSTRUCTION WLL

Doha, Qatar

September 2018 - November 2019

TEKFEN CONSTRUCTION-TURQUOISE CONSTRUCTION WLL AL KHOR HIGHWAY PROJECT SURVEY GROUP CHIEF DOHA / QATAR
CONSTRUCTION OF MSE WALLS AND ALL CONCRETE BARRIERS OF QATAR AL KHOR HIGHWAY PROJECT
Preparation of application work programs for the field by carrying out the necessary project studies in Autocad Civil 3D program of MSE concrete walls, New Jersey and various types of concrete barriers in the highway project
Preparing the 3D coordinates of the MSE concrete walls, New Jersey and various types of concrete barriers in the highway project by making the necessary coordinate generation studies in the Autocad Civil 3D program, giving them to the field surveying teams and performing the application studies.
Taking the as-builts of the concrete barriers whose production has been completed and processing them on the projects, calculating their quantities, and transmitting the data to the relevant units for progress payment work
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level, GPS) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

QUANTITY SURVEY CHIEF

November 2017 - July 2018

HDS ENGINEERING

Istanbul, Türkiye

November 2017 - July 2018

HDS ENGINEERING SILE DISABLED HOLIDAY VILLAGE PROJECT SURVEY CHIEF SILE/ISTANBUL
ACCOMMODATION VILLAS FOR THE DISABLED, SOCIAL FACILITIES BUILDINGS, SPORTS AND CULTURAL BUILDINGS MIXED HOLIDAY VILLAGE PROJECT
Making field measurement studies that will form the basis of progress payment works with Total Station and GPS devices.
Carrying out the necessary investigation studies in the application projects for which volume calculations will be made.
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad Civil 3D program
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely

Company industry:
Construction & Building
Job role:
Engineering

SURVEY MANAGER

May 2015 - August 2017

MAPA CONSTRUCTION WLL

Jeddah, Saudi Arabia

May 2015 - August 2017

MAPA CONSTRUCTION WLL AL RA'IDAH HOUSING COMPLEX PROJECT SURVEY MANAGER JEDDAH / SAUDI ARABIA
MASS HOUSING PROJECT WITH 4500 FLATS CONSISTING OF 74 APARTMENT BLOCKS
Establishing a sufficient number of ground control (point of reference) points in the project area where the residences will be built, calculating their 3D coordinates with GPS and other measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Calculation of the 3D coordinates of the bored piles in the project, making field productions with field measurement studies, taking the as-builts of the piles whose manufacture has been completed, and sending them to the relevant units.
Inspection of wall projects of residential blocks and preparation of 3D application coordinates for field fabrications
Examination of the exterior projects of the residential blocks and preparation of the 3D application coordinates for the field fabrications.
Examination of all the finishing projects of the residential blocks and preparation of the 3D application coordinates of the relevant details for field productions
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad Civil 3D program
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level, GPS) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

PROGRESS PAYMENT CONTROL AND SURVEY CHIEF

August 2012 - April 2015

PROYAPI ENGINEERING AND CONSULTANCY

Agdas, Azerbaijan

August 2012 - April 2015

PROYAPI ENGINEERING AND CONSULTANCY PROGRESS PAYMENT CONTROL AND SURVEY CHIEF BAKU/AZERBAIJAN
RECONSTRUCTION OF 145 KM STATE ROAD BETWEEN MUGANLI - YEVLAX CITIES IN AZERBAIJAN
Establishing a sufficient number of ground control (point of reference) points along the route where the highway will be built, calculating their 3D coordinates with GPS and other measurement and calculation methods, and checking these coordinates on the ground
Preparation of the field existing ground levels and existing details with sufficient width and as a base for all projects, with the field measurements and office works, drawing the cross-section and profiles f the route where the highway will be built.
Preparation of 3D application coordinates required for field application after examining all infrastructure and superstructure works projects coming from the designer, checking and approving the conformity of the data with the details.
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad Civil 3D program
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad Civil 3D) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level, GPS) and making the necessary calibrations

Company industry:
Management Consulting
Job role:
Engineering

SURVEY CHIEF

February 2011 - August 2012

DIA HOLDING

Baku, Azerbaijan

February 2011 - August 2012

DIA HOLDING - AZWIRT MMC - PROPLAN PROJECT MANAGEMENT SURVEY CHIEF BAKU/AZERBAIJAN
BAKU INTERNATIONAL HAYDAR ALIYEV AIRPORT NEW TERMINAL BUILDING, CONTROL TOWER, PRESIDENTIAL RECEPTION HALL, FIRE OFFICE BUILDING AND EXISTING TERMINAL BUILDING RENOVATION PROJECT
Establishing a sufficient number of ground control (point of reference) points along in the field where the new airport buildings will be built, calculating their 3D coordinates with GPS and other measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Precise application of the large anchors of the steel columns in the foundation in the new terminal building and approval of the concrete casting by checking the final position coordinates of the anchors before pouring the foundation concrete.
After the foundation concrete is poured, the final position coordinates of the steel column anchors are read, the position differences before and after the concrete are examined and determined and sent to the relevant company that will make the steel columns.
Making the assembly of the steel columns and transmitting the position coordinates of the columns after the assembly to the relevant units
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough and finishing construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad and Netcad program
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level, GPS) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level, GPS) and making the necessary calibrations
Follow-up of Ulusoy Engineering company, which carries out the field survey works in the project, and control and hand over of the measurement works in the field manufacturing

Company industry:
Construction & Building
Job role:
Engineering

SURVEY GROUP CHIEF

June 2010 - January 2011

AGAOGLU CONSTRUCTION

Istanbul, Türkiye

June 2010 - January 2011

AGAOGLU CONSTRUCTION INFRASTRUCTURE AND SURVEY TEAM CHIEF ATAŞEHIR/ISTANBUL
MY TOWERLAND HOUSING PROJECT
Establishing a sufficient number of ground control (point of reference) points along in the field where the residentces will be built, calculating their 3D coordinates with measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough and finishing construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Calculation of the 3D coordinates of the bored piles in the project, making field productions with field measurement studies, taking the as-builts of the piles whose manufacture has been completed, and sending them to the relevant units.
Inspection of wall projects of residential blocks and preparation of 3D application coordinates for field fabrications
Examination of the facade projects of the residential blocks and preparation of the 3D application coordinates for the field fabrications.
Examination of all the finishing projects of the residential blocks and preparation of the 3D application coordinates of the relevant details for field productions
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad and Netcad program
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY WORKS CHIEF

August 2009 - June 2010

IBK CONSTRUCTION

Izmit, Türkiye

August 2009 - June 2010

IBK CONSTRUCTION SURVEY WORKS CHIEF DILOVASI / KOCAELI
MMK ATAKAS FLAT STEEL MANUFACTURING FACILITIES CONSTRUCTION PROJECT
Establishing a sufficient number of ground control (point of reference) points along in the field where the factory buildings will be built, calculating their 3D coordinates with measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates required for field application after examining all infrastructure and superstructure works projects coming from the designer, checking and approving the conformity of the data with the details.
Precise (1 mm) execution of the foundation fabrication of factory buildings, the applications of the anchors in the foundations and in all other sections, and the anchorage assemblies.
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad and Netcad program
Taking the as-builts of the productions in the field, making 3D drawings in Autocad and Netcad program and transmitting them to the relevant units
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY WORKS CHIEF

June 2008 - August 2009

OZKA CONSTRUCTION

Tripoli, Libya

June 2008 - August 2009

OZKA CONSTRUCTION SURVEY WORKS CHIEF TRIPOLI/LIBYA
CONSTRUCTION OF TRIPOLI RESIDENCE (2000 FLATS) AND 2 BUSINESS CENTER BUILDINGS (40 FLOOR)
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough and finishing construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Inspection of wall projects of residential blocks and preparation of 3D application coordinates for field fabrications
Examination of the facade projects of the residential blocks and preparation of the 3D application coordinates for the field fabrications.
Examination of all the finishing projects of the residential blocks and preparation of the 3D application coordinates of the relevant details for field productions
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY WORKS CHIEF

January 2007 - May 2008

YESIL CONSTRUCTION

Istanbul, Türkiye

January 2007 - May 2008

YESIL CONSTRUCTION SURVEY WORKS CHIEF BEYLKDUZU/ISTANBUL
INNOVIA MASS HOUSING PROJECT 1ST PHASE
Establishing a sufficient number of ground control (point of reference) points along in the field where the residentces will be built, calculating their 3D coordinates with measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Calculation of the 3D coordinates of the bored piles in the project, making field productions with field measurement studies, taking the as-builts of the piles whose manufacture has been completed, and sending them to the relevant units.
Deformation monitoring of Bored Piles and pile cap beams and transmitting the results to the relevant units
Inspection of wall projects of residential blocks and preparation of 3D application coordinates for field fabrications
Examination of the facade projects of the residential blocks and preparation of the 3D application coordinates for the field fabrications.
Examination of all the finishing projects of the residential blocks and preparation of the 3D application coordinates of the relevant details for field productions
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad and Netcad program
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY WORKS CHIEF

July 2005 - January 2007

GOKCE CONSTRUCTION

Istanbul, Türkiye

July 2005 - January 2007

ORIJIN GROUP-GOKCE CONSTRUCTION SURVEY WORKS CHIEF ISTINYE/ISTANBUL
ISTINYE PARK SHOPPING CENTER AND RESIDENTIAL PROJECT
Establishing a sufficient number of ground control (point of reference) points along in the field where the shopping center will be built, calculating their 3D coordinates with measurement and calculation methods, and checking these coordinates on the ground
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for the rough construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors, after examining and checking the suitability of the shopping center superstructure projects and approval of the projects
Preparation of the 3D application coordinates of all circular and linear axes of the cassette type floors of the shopping center and making the applications
Preparing the 3D application coordinates of all steel roof anchors of the shopping center and performing the applications with a precision of 1 mm
Carrying out as-built and 3-dimensional field application studies related to the exterior of the shopping center and transmitting the asbuilt drawings to the relevant units
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY CONTROL ENGINEER

May 2003 - July 2005

ECZACIBASI - IS GYO

Istanbul, Türkiye

May 2003 - July 2005

ECZACIBASI-IS GYO SURVEY CONTROL ENGINEER LEVENT/ISTANBUL
LEVENT KANYON HOUSING-BUSINESS CENTER-SHOPPING AND ENTERTAINMENT CENTER PROJECT
Controlling the 3D coordinates of the ground control points (point of reference) established by the contractor measurement teams in the project area where the shopping center will be built, on the ground
Controlling the 3D application works of the contractor's field measurement teams in the construction of the rough and finishing works in all infrastructure and superstructure manufacturing of the shopping center and other structures ( bored piles, drainage, rough construction, facade, finishing works)
Controlling the applications of Bored Pile, pile cap beam and shoring manufacturing, monitoring the deformation and communicating the results to the relevant units
Checking the coordinates of precision applications of all steel roof anchors of the shopping center
Horizontal and vertical controls of all reinforced concrete columns and curtains in the residential entertainment center and 38-floor business center of the shopping center
Before the application of the exterior of the shopping center, taking the survey and controlling the 3D application studies, forwarding the as built drawings to the relevant units
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY GROUP CHIEF

September 2002 - May 2003

YAPI MERKEZI CONSTRUCTION

Istanbul, Türkiye

September 2002 - May 2003

YAPI MERKEZI CONSTRUCTION SURVEY GROUP CHIEF KURTKOY/ISTANBUL
KURTKOY NOVARTIS PHARMACEUTICAL MANUFACTURING FACILITIES PROJECT
Establishing a sufficient number of ground control (point of reference) points along in the field where the factory buildings will be built, calculating their 3D coordinates with measurement and calculation methods, and checking these coordinates on the ground
Preparation of the existing ground levels and existing details situation of the field, which will form the basis for the entire project, with field measurements and office work.
Examining the projects given by the employer and the technical details of the project, and conducting the necessary studies
Preparation of 3D application coordinates for rough and finishing construction works (column-curtain, elevator, staircase, mechanical electrical details) on the foundation and all floors after examining and checking the suitability of all infrastructure and superstructure projects given by the employer.
Precise (1 mm) execution of the foundation fabrication of factory buildings, the applications of the anchors in the foundations and in all other sections, and the anchorage assemblies.
Excavation and filling projects of the infrastructure and superstructure in the project by using the field existing levels and project details and transmitting them to the relevant units
For the volume calculations of excavations and fillings made in all infrastructure and superstructures in the project, obtaining the data on the project and with the work done in the field, calculating the volume amounts in Autocad and Netcad program
Taking the as-builts of the productions in the field, making 3D drawings in Autocad and Netcad program and transmitting them to the relevant units
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

SURVEY FIELD TEAM CHIEF

June 1996 - June 2002

CAGDAS SURVEYING ENGINEERING

Istanbul, Türkiye

June 1996 - June 2002

CAGDAS SURVEYING ENGINEERING SURVEY FIELD TEAM CHIEF ISTANBUL AND SURROUNDING PROVINCES
ALL FIELD SURVEY WORKS IN ISTANBUL AND SURROUNDING PROVINCES
Establishing a sufficient number of ground control (poınt of references) points in the project areas where the existing ground levels and existing ground details will be take, calculating their 3D coordinates with measurement and calculation methods and checking these coordinates on the ground
Preparation of the projects showing the current situation details and current land elevations of the project areas, which will be the base for various projects to be made, with field measurements and office studies.
Preparing the application coordinates of the corners of the parcels in the land development plans and making their applications in the field
Making field point applications in various construction projects, giving elevation, office and field application works
Application works of the piles in the sea in the Kadıköy sea port construction project
Taking the as-builts of the productions in the field, making 3D drawings in Autocad and Netcad program and transmitting them to the relevant units
Paying attention to work safety and other rules during our field and office works
Organizing office and field measurement teams so that all these works can be done on time and accurately, professional use of measuring devices (Total Station, Level) and cartography cad programs (Autocad, Netcad) and ensuring that field applications are carried out precisely
Following the calibration status of all the measuring devices we use (Total Station, Level) and making the necessary calibrations

Company industry:
Construction & Building
Job role:
Engineering

Education

Yildiz Technical University

July 1997

July 1997

Bachelor's degree, Cartography And Surveying Engineering

Türkiye

GPA (percentage): 66%

GPA (percentage): 66%

Skills

Microsoft PowerPoint
Expert
Microsoft PowerPoint
Expert
Microsoft Word
Expert
Microsoft Word
Expert
Microsoft Excel
Expert
Microsoft Excel
Expert
AutoCAD Revit & Civil 3D
Expert
AutoCAD Revit & Civil 3D
Expert
use of measuring instruments
Expert
use of measuring instruments
Expert
Total Station,Level and GPS
Expert
Total Station,Level and GPS
Expert
Land Survey Works
Expert
Land Survey Works
Expert
Autocad Civil 3d
Expert
Autocad Civil 3d
Expert
Office Works
Expert
Office Works
Expert

Languages

English

Expert

Training and Certifications

Training
AUTOCAD CIVIL3D
MYSELF
Jan 2015

Hobbies and interests

MOUNTAIN HIKES

NONE