Electrical Engineer
Fichtner
مجموع سنوات الخبرة :4 years, 8 أشهر
• Verifying Request for inspection report coming from the contractor.
• Supervising Material inspection reports.
• Joining in the LV, MV and HV installation, testing and commissioning activities at the site performed by the contractor.
• Reporting to Lead discipline engineer.
• Supervised the implementation of the electrical installations LV, MV and HV. Operation, maintenance and troubleshooting of
electrical equipment. Electrical and instrumentation work at the sites in the industrial field.
• Reviewed documents, electrical list, Instrument and control device list, signal list and electrical diagram design, interconnection
diagram electrical, instrument, control and PLC to ensure that they follow correctly.
• Ensured that the work follows the client’s standards and specifications.
• Participated with the work team in troubleshooting
• Assisted senior electrical engineer and electrical section head in coordinating the preparation and implementation of
execution plans in various and electrical engineering works location.
• Meet with client to understand customer satisfaction levels and review daily progress.
• Submitted report, and final dossiers for electrical and instrumentation works to the clients.
Electrical installations include:
MV/LV Transformer, MV Switchboard - Zigzag Transformer, Auxiliary Services Transformer, Circuit Breaker Distribution Panel,
Distribution Board, 3 Phase Auxiliary, Main Distribution Board (MOB), RMP (Relay and Metering Panel), Relay Emergency, UPS
Distribution Panel, UPS Control Cabinet, UPS Junction Box, Analog Junction Box, Digital Junction Box, Power Distribution Center,
Battery Bank, Capacitor Bank, Control Voltage Feeders, Outgoing Feeder, Power Feeder, Start Warning Feeder, PLC Panels, MCC PLC IO
Cabinet, Turbine, Frequency Converter. Power Cable, Control Cable, Signal Cable and Other cables. Motors, Motor Control Center (MCC),
Variable Frequency Driver (VFD) Panel, Breaking Resistor VFD, Induced Draft Fan (ID Fan), E Stop Push Button Switch, Start and Stop
Push Button, Temp Transmitter, Vibration Sensor, Air Blaster, Flow Promoting Device Solenoid Valve, Rotary Sluice Motion Deflector,
Throttle Valve Actuator, Preheater Outlet Pressure, Port Mobile Hopper, Local Panel Fans, Local Control Push Button, DC Start Panel,
Pumps, Emergency Oil Pump, Chemical Cleaning Pump, and Other Electrical Installations.
Key achievement:
Created new plans for improve the efficiency of the electrician’s team work. Increased electricians team productivity efficiency by 35% over
previous plans.
Projects:1- Yanbu Cement Company - Yanbu Cement Plant- Line 4 Upgrade.
Location: Yanbu, Saudi Arabia.
2- the Durrah Advanced Development Company - Building a Sugar Refining Plant.
Location: Yanbu industrial, Saudi Arabia
3- Arabian Cement Company - Arabian Cement Plant - Rabigh Plant Expansion - Line 6 Upgrade. Location: Rabigh, Saudi Arabia
4- Southern Province Cement Company SPCC - Bishah Cement Plant - Line 1 Upgrade.
Location: Bishah, Saudi Arabia
5- Saudi Cement Company - Saudi Cement Plant - Upgrade.
Location: Al-Ahsa, Eastern Province, Saudi Arabia
I am in Electrical Engineer Trainee in the Electrical Engineers Training Program.
I am familiar with:
- Electrical Power System.
- Grounding for Engineers.
- Transformer Operation and Maintenance.
- UPS AC, UPS DC and Batteries (Operation, Maintenance and Troubleshooting).
- Power Electronics.
- Electrical Motors and Applications.
- Electrical Controls and Drawings.
- Arc Flash Analysis.
- Safe Operation and Maintenance of Circuit Breaker and Switchgear.
- On Grid Small Solar PV System.
- Power System Protection.
Responsibilities:
Installation connectors, Installation of circuit breakers 8 to 10 per transformer, Installation 8 fuse with 1 MCB on a board per transformer, connecting wires and Installation transformer parts. 40 hours of hard work I’ve been producing 10 transformers per
week.
Production of transformers for the customer of the Saudi Electricity Company and the Saudi Aramco company.
Training on:
- Electrical systems in electronic cabins and mobile site in fixed and mobile maintenance department.
- Administrative support work and preparing the final report in Technical Buildings Management Department.
- Check battery voltage and cooling fan and write report about electrical equipment and electrical devices.
- The check includes on D.C. power supply, plant volts and amps, battery voltage, battery condition, rectifier ampere, earth cables, fire alarm battery charge volts and amps . Check batteries in per in electronic cabin and mobile site.