Internal Security Forces Facilities Project (ISF). Client: ISF, Project Manager: QPM, Main Contractor: QD-SBG, Consultant: KEO, project value is 600 Million Qatari Riyals.
EPC of all MEP works relating to the project. The project contains 16 barracks buildings 17, 000 SQM the area of each barrack. In addition to infrastructure works serving the barracks.
Client: PDO, Oman; Contract value: USD 100 M
Position: Completion
Hook-up Project (
Mushaireb Project (Buildings), Sudan, Khartoum; Client: Qatari Diar; Contract Value: USD 100 M
New Saudi Embassy Project (High-Rise Building), Egypt, Cairo; Client: Saudi
(Oil & Gas), Habshan, UAE; Client: GASCO & Foster Wheeler; Contract Value: USD 600 Million.
), Azerbaijan; Client, BP; Contract Value: USD 450 M
Karachaganak Main Works Contract (
Supervise and installed electrical systems inside the existing plant.
•Coordinate with existing plant authorities for permit to work issuance prior to commencing any job.
•Coordinate with QC department for work inspections and corrective action.
A three level mall with a total built-up area of 248, 300 square meters, Over 350 units including anchor tenants, line shops, and entertainment areas such as cinema and Magic Planet A three level car park with a total built-up area of approximately 135, 000square meters, Approximately 5, 200 car parking spaces provided connected to the mall by bridges. Design and built of sewage treatment plant, MBR technology, 1300m3/day sewage capacity.
Project Value (MEP): AED 450, 000, 000.00
Hyder
The project is stage one for jumeirah open beach retail comprised of 37000 SqM of F&B shell & Core and 36500 Sq.M of Retail & Parking facilities. Infra Structure/External Works.
Project Value: AED 250, 000, 000.00