DESIGN ENGINEER
PERI
مجموع سنوات الخبرة :10 years, 7 أشهر
(HONG KONG) LIMITED
The main task is to develop cost efficient formwork and falsework solutions for Hong Kong clients.
To prepare designs/drawings (from Autocad) for various structures, perform static analyses to
ensure optimal design and prepare client presentations.
One of the biggest projects done was the Façade Scaffolding for the Hong Kong
Boundary Crossing Facilities of the Hong Kong-Zhuhai-Macao Bridge.
-ASIA PHILIPPINES, INC
The Designer’s main task is to develop the most cost-efficient formwork, shoring or scaffolding
solutions for various kinds of concrete construction projects. These solutions are based on PERI’s
30 standard product systems that range from straight wall formwork for retaining walls to
sophisticated self-climbing systems.
Some featured projects are: Coping Beam Supports for Metro Manila Skyway 3 Extension and
Control Tower Formwork, Climbing Access Beam and Slab Supports for New Bohol International
The main task is to supervise team members in providing safe, cost-effective designs of formworks
and shoring arrangements. Coordinates with the key personnel in Hong Kong via online
conferences, calls and emailed instructions. Checks prepared presales and erection drawings and
calculations done by team members.
One of the featured projects during this period is the Express Rail Link Contract 810A project.
The main task is to provide safe, cost-effective design of formworks and shoring arrangements
including drawings, calculations, and materials take-off for the assigned projects. Also compiled
visual perception and engineering support to assist sales and enable customers to use RMDK
products in safe and efficient manner.
courses: SKILLS • Licensed Civil Engineer (PRC No. 117766)