Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mark Roman, Construction Manager

Mark Roman

Construction Manager·Arabian Construction Company

United Arab Emirates

Bachelor's degree, Civil Dept

Work experience

Total years of experience: 13 years, 2 months

Construction Manager

March 2017 - Present

Arabian Construction Company

Dubai, United Arab Emirates

March 2017 - Present

LINK BRIDGE in front of Address Residences Fountain Views - Emaar:
Description: A Link bridge Connect between the FV towers and the Dubai Mall constructing on life road \{Downtown Dubai's Mohammed bin Rashid boulevard Street\} _ The Bridge contains of three floors_1st is Retails and 2nd & 3rd for cars pass way

Company industry:
Construction & Building
Job role:
Construction and Building

Project

December 2015 - February 2015

2018 - AL Shafar JV KIER Contracting

December 2015 - February 2015

Residential buildings, Townhouses, Landscape & Mosque
Client: Meraas Development

Job role:
Engineering

ENGINEER

June 2013 - December 2013

AL Shafar General Contracting

United Arab Emirates

June 2013 - December 2013

Role and Responsibilities:
•Site Management responsibilities including all aspects of project from initial consultation with the client, planning and follow up the designing and obtaining approvals and construction permits.
• Attend weekly and other progress meetings held at the site as required Identify constraints and recommended corrective measures.
•Analyze survey reports, drawings, blueprints and RFIs
•Review the contractor’s progress time by time and coordination their schedule and method of works.
•Direct engineering activities ensuring compliance with environmental, safety and other governmental regulations.
•Continuous inspections and consultation including the preparation of written and oral reports on contractual and procedural matters.
•Review inspector’s daily reports and preparation of engineer’s daily diary and general oversight of activities of work assignments.
•Follow up and handling all the finishing works requirements and following the new systems the erection PODS (working with UniPods and Modulor company of ready pods units

Company industry:
Construction & Building
Job role:
Engineering

Project

May 2009 - August 2009

Maraasi Development - Egyp

May 2009 - August 2009

Job role:
Engineering

Project ENGINEER

August 2009 - June 2009

Arabian Construction Company

United Arab Emirates

August 2009 - June 2009

Role and Responsibilities:-
•Conveying management’s instruction to contractors.
•Revision with municipal affairs for all stages.
•Creating & estimating all finance programs and prepare future forecasting.
• Checking out the approved sufficient materials to carry the projects without delay.
•Coordinating with the contractors to ensure that the work is running according to the required specification.
•Leader ship for all the staff and the subcontractors.

Company industry:
Construction & Building
Job role:
Engineering

Senior Site Engineer

June 2006 - May 2009

AL Shafar General Contracting

United Arab Emirates

June 2006 - May 2009

Role and Responsibilities:
•Reporting to Section engineer and CM
•Concrete and Finishing works for 16 villas
•Doka Publishes for columns and for the slabs formwork Dokaflex Eurex
•Coordination with Company Labors and the sub contactors Labors.

Company industry:
Construction & Building
Job role:
Civil Engineering

SENIOR PROJECT

-

-

A proven record of success achieved through diligence, hard work, attention to details, and my belief in a consistent application of the fundamentals. Responsible for executing construction documents, Taking Corrective actions when needed, Ensuring the quality of work and ensuring a good communication with the labors.
•Coordinator: Coordinating with the Consultant, Sub Contractors, QA/QC and all disciplines of the project.
•Site Manager: Responsible to assist the project manager to prepare Variations, claims and progress reports.

Job role:
Management

Consultant

-

Khatib & Alami

United Arab Emirates

-

Company industry:
Business Consultancy Services
Job role:
Information Technology

Site Engineer

-

-

Role and Responsibilities:
•Reporting to Section engineer and CM
•Form, Steel, Concrete works for the whole 3 buildings
•Finishing works
•During the project period we used the following systems _ Cup lock Scaffolding system for the slabs and Paschal formwork shutter for columns and retiring walls
•The project slabs were pour strip and solid slabs
•Sika Water proofing system
•Form, steel and concrete for raft, strap beams and pile caps


Third Project: Bay Square @ Dubai Business Bay:
Description: The project consist of 12 Residential buildings and Hotel including (5 Basements + G.F +Mezzanine + 10 Floors

Job role:
Civil Engineering

Consultant

-

DSA Architects International

United Arab Emirates

-

Company industry:
Architecture
Job role:
Information Technology

Second Project

-

Golden Mile Palm Jumeirah

-

The project consist of 10 buildings including (3 Basement + G.F. + Mezzanine +2 podium + 6 Residential floor)
Client

Job role:
Engineering

Site Engineer

-

Dok

-

Role and Responsibilities:
•Reporting to Section engineer and CM
•Form, Steel, Concrete works for 45 floors
•Finishing works
•During the project period we used the following systems:

Company industry:
Other Healthcare Services
Job role:
Civil Engineering

Consultant

-

Design & Architecture Bureau (DAR)

United Arab Emirates

-

Company industry:
Architecture
Job role:
Information Technology

Project

-

Emirates Crown Tower

-

The project consist of 2 basements + 4 floors podium + 60Residential floor + 2 service floors) in Dubai Marina

Job role:
Engineering

Consultant

-

Turner/Engineering Consulting Group

-

Job role:
Information Technology

Consultant

-

Adnan Saffarini Engineering Consultan

-

Role and Responsibilities:-
•Preparing cost sheets and method of statements. Reporting with Construction Manager
•Form, steel and concrete work for the whole building
•Finishing work and Façade Aluminum Cladding.
•Snagging and de-snagging.
•Steel structure for the tower dome with (Tiger Steel Engineering Company LLC)
•During the project period we used the following systems:
Doka Jumping Hydraulic system for outside vertical, Grocon system of the core wall, Doka table system for typical slabs and Cup lock Scaffolding system for service slabs.
•The project slabs were post tension and solid slabs


Second Project: The Strategic Water Storage and Recovery Project

Company industry:
General Engineering Consultancy
Job role:
Information Technology

Consultant

-

Dornier consulting GIZ

-

Reporting to Section engineer and CM
•Concrete and Finishing works for pump station
•Execute of Well Chambers / Air Valves & Watch out Chambers
•Infiltration basin/recovery well system known as aquifer storage and recovery, which features water pipe lines, HV transmission lines, pump stations.
•Execute Sip tick, Isolation, Hypo and Scheme tanks.

Company industry:
Business Consultancy Services
Job role:
Information Technology

Project

-

250km south west of

-

Job role:
Engineering

Consultant

-

Adnan Saffarini

United Arab Emirates

-

Company industry:
General Engineering Consultancy
Job role:
Information Technology

Second Project

-

The Onyx

-

T1 (16 floors), T2 (25 floors) & T3 (14 floors)
Client: Ishraqah For Development

Company industry:
Hospitality & Accomodation
Job role:
Engineering

Engineer

-

DEWA

United Arab Emirates

-

Role and Responsibilities:-
•Understanding the credits of the Pearl Community and Building Rating Systems.
•Managing and revision for daily operation on the site.
•Guiding the required integrated development process.
•Supervising time schedules and revision the daily operation on the site.
•Communicated with

Company industry:
Public Administration
Job role:
Engineering

Consultant

-

Hyder

Bahrain

-

Company industry:
Business Consultancy Services
Job role:
Information Technology

Consultant

-

Mirage

Qatar

-

Company industry:
Hospitality & Accomodation
Job role:
Information Technology

Representative

-

Turner Construction International LLC

Pakistan

-

Monitoring & Coordination between all Subcontractors \{Eversendai Eng. LLC_ Steel Structure and Folcra Beach _Cladding and Daktronics_ LED Screen works.
•Built Steel structure, Concrete, Finishing works, Façade Aluminum Cladding and Large LED Screen installing.
•Preparing Manpower Distribution, cost sheets and method of statements. Reporting with Project, Construction & Consultant Manager.
•The project slabs were Deck Sheet slabs
•Review inspector’s daily reports and preparation of engineer’s daily diary and general oversight of activities of work assignments.
•Direct engineering activities ensuring compliance with environmental, safety and other governmental regulations.
•Administration of contraction contract works and prompt exchange of correspondence, submittals and RFIs to all contractors.
•Leader ship for Site Engineering and the subcontractors Supervisor.
•Attending weekly progress meetings for each of MEP and Construction held at the site as required Identify constraints and recommended corrective measures.

Company industry:
Construction & Building
Job role:
Sales

Site Engineer

-

-

Role and Responsibilities:
•Reporting to Section engineer and CM
•Form, Steel, Concrete works for the whole 3 buildings
•Finishing works
•During the project period we used the following systems _ Cup lock Scaffolding system for the slabs and Paschal formwork shutter for columns and retiring walls and Slip Form Hydraulic jumping system for the core wall
•The project slabs were pour strip and solid slabs for the basements floors and then post tension slab up of the grand floor
•SIKA Water proofing system
•Form, steel and concrete for raft and pile caps

Job role:
Civil Engineering

Education

Alexandria University

May 2006

May 2006

Bachelor's degree, Civil Dept

Egypt

a rate of appreciation GOOD, And Project-grade {EXCELLENT} [Ports Engineering]. •PMP & PMI Studied

Skills

PMP
Expert
PMP
Expert
Project Engineering
Expert
Project Engineering
Expert
CUSTOMER RELATIONS
Expert
CUSTOMER RELATIONS
Expert
MANAGEMENT
Expert
MANAGEMENT
Expert
PERL
Beginner
PERL
Beginner
SUPERVISORY SKILLS
Expert
SUPERVISORY SKILLS
Expert
AUTOCAD
Intermediate
AUTOCAD
Intermediate
CONSULTING
Expert
CONSULTING
Expert
DESIGN
Intermediate
DESIGN
Intermediate
ENGINEERING
Expert
ENGINEERING
Expert
ESTIMATING
Expert
ESTIMATING
Expert
FEATURES
Beginner
FEATURES
Beginner
PMP
Expert
PMP
Expert
Project Engineering
Expert
Project Engineering
Expert

Languages

English

Expert

Urdu

Expert

Arabic

Native Speaker

Hobbies and interests