محمد سلامة, Project Manager

محمد سلامة

Project Manager

Al Sweidi & Shams Contracting Company

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Architecture
الخبرات
17 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 1 أشهر

Project Manager في Al Sweidi & Shams Contracting Company
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ ديسمبر 2019

at VVIP, VIP Villas (Al Ain - Al Faqaa).
2- Construction Manager at Marina Rise Tower Project (AL Reem Island).
* Direct Construction Project from Conception to completion.
* Study work order, scope of work, issued drawings and spec sheet.
* Review all aspects including bill of quantity & estimated cost for budget to request.
* To review, study design with shop drawings and insure it matches site condition and control and follow
up house production units, subcontractor’s plants to insure it works parallel with approved project’s
work program, shop drawing details, approved samples, completion date, and to the limit of quality
standard.
* Plan, organize and identify resources needed.
* Visit site regularly, coordinate with production plant, determined requirements and changes in
advance.
* To monitor project cost, budget limit and arrange to procure project’s needed
* to ensure that master general project’s program is followed and in the right direction and to request
for regular quality and completion inspections in coordination with other departments to insure
methods, work quality and work co-ordinations are matching project final image and to the limit of
quality standard.
* materials and equipment’s in scope and insure availability and delivery schedule to match work
program and to the limit of budget
* Coordinate direct construction workers and Sub-Contractors.
* Review the work progress and daily basis.
* Analyze, manage and mitigate risks.
* Ensure quality construction standards and the use of Proper construction techniques.
* Plan with PM activities for daily/weekly look-ahead program.
* To make, forward and discuss projects status reports during weekly board meetings with the direct line
manager and the Director.
* Co-ordinate with the consultant engineers in order to resolve quality related problems and to share in
resolving other contractual day by day problems.
* Assign tasks of subordinates as per requirements.
* Assign individuals and responsibilities due to scope, confirm individuals to understand project activities.
Ensure project documents are completed and organized. Manages day-to-day operational aspects,
arrange progress meetings regularly, Oversee and coordinate plant production, work quality and
subcontractors work in progress. insure that it follows scheduled work orders, work drawings details,
completion date, work program and to the limit of quality standard.
* Responsible to follow up with material /shop drawings approval such as (GRC - Marble - Steel
structure -Roof clay tiles -Paint-ceiling-aluminum).
* Coordinate with QA/QC department to make all required tests in third party material labs
* Follow up with client and Clint's representatives, to finalize and prepare necessary documents to
handover project on time and in a proper way.
Achievement:
1- Marina Rise Tower
* Located: Al Reem Island Opposite of Leaf Tower.
* Construction of: (2Basement + GF + 2Podiums + 24 Floors Residential + Roof + Top Roof).
* Cost Value: 144, 000, 000 AED.
* Client: Ishraq.
* Project Management/Consultant: Khatib & Alami.
2- Construction of VVIP Villas 1 No & VIP Villas 3 No.s.

Construction Manager في Sarh Consulting & engineering
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ مايو 2008
Project Manager
  • ديسمبر 2016 إلى ديسمبر 2019
في ALSHAFAR ENGNIEERING Company
  • أبريل 2014 إلى ديسمبر 2019
Acting Project Manager
  • يونيو 2015 إلى ديسمبر 2016
Architect
  • الإمارات العربية المتحدة
  • أبريل 2014 إلى يونيو 2015

Study work order, scope of work, issued drawings and spec sheet.
* Review all aspects including bill of quantity & estimated cost for budget to request.
* Plan, organize and identify resources needed.
* Visit site regularly, coordinate with production plant, determined requirements and changes in
advance.
* To monitor project cost, budget limit and arrange to procure project’s needed.
* materials and equipment’s in scope and insure availability and delivery schedule to match work
program and to the limit of budget.
* Assign individuals and responsibilities due to scope, confirm individuals to understand project activities.
Ensure project documents are completed and organized. Manages day-to-day operational aspects,
arrange progress meetings regularly, Oversee and coordinate plant production, work quality and
subcontractors work in progress. insure that it follows scheduled work orders, work drawings details,
completion date, work program and to the limit of quality standard.
* To make, forward and discuss projects status reports during weekly board meetings with the direct line
manager and the Director.
* Follow up with client and Clint's representatives, to finalize and prepare necessary documents to
handover project on time and in a proper way.
* To review, study design with shop drawings and insure it matches site condition and control and
follow up house production units, subcontractor’s plants to insure it works parallel with approved
project’s work program, shop drawing details, approved samples, completion date, and to the
limit of quality standard.
* to ensure that master general project’s program is followed and in the right direction and to
request for regular quality and completion inspections in coordination with other departments to
insure methods, work quality and work co-ordinations are matching project final image and to the
limit of quality standard.
* Co-ordinate with the consultant engineers in order to resolve quality related problems and to share
in resolving other contractual day by day problems.
* Check all tender drawing of project and coordinate structural, architectural layouts and
perspective & Generate architectural, structural proposals and details.
* Provide site with all needed shop drawing s for construction process and issue work packs to site
engineers.
* Responsible to follow up with material /shop drawings approval such as (GRC - Marble - Steel
structure -Roof clay tiles -Paint-ceiling-aluminum).
* Coordinate with QA/QC department to make all required tests in third party material labs.
* Responsible for a full mock up villa with all activates to be guide for site engineers.
Achievement:
1- Construction of Development of Emirates Transport Service Center (7 Building).
* Located: Al Qouz Dubai, UAE.
* Consultant: (ACE) International Consulting Engineers.
* Client: Emirates Transport.
* Cost value: 94, 000, 000 AED.
2- Construction of Commercial Building B+G+1+R.
* Located: Ras Al Khor Ind. Second Dubai, UAE.
* Consultant: Arab Experts Eng. (AREX).
* Client: Mr. Majid Almuhaideb.
* Cost value: 27, 000, 000 AED.
3- Construction of LUXURY VILLA G +1+ Roof.
* Located: Jumeirah one Dubai, UAE.
* Consultant: (APG).
* Client: EO
* Cost value: 105, 000, 000 AED.
4- Construction of (3B+G+14) IVORY GRAND HOTEL APARTMENT.
* Located: Al Barsha

Technical Architect في S.S.LOOTAH Contracting Company
  • الإمارات العربية المتحدة
  • أبريل 2012 إلى أبريل 2014

Check all tender drawing of project and coordinate structural, architectural layouts and
perspective & Generate architectural, structural proposals and details.
* Provide site with all needed shop drawing s for construction process and issue work packs to site
engineers.
* Prepare progress reports (daily -weekly &monthly) and monitoring time line program.
* Responsible to follow up with material /shop drawings approval such as (GRC - Marble - Steel
structure -Roof clay tiles -Paint).
* Working with two separate consultants (two contracts).
* Review sub contracts submittals.
* Coordinate with QA/QC department to make all required tests in third party material labs such as
(Aluminum -GRC) Wooden battens.
* Responsible for a full mock up villa with all activates to be guide for site engineers.
* Represents my company in technical meetings with consultant &client.
Achievement:
- Construction of 2 Buildings G +4+roof
* Located: Palm Jumeirah Dubai, UAE.
* Consultant: Dar Al-Handasah.
* Client: Nakheel.
* Cost value: 105, 000, 000 AED.

Project Engineer في Delta Emirates Contracting Company
  • الإمارات العربية المتحدة
  • أبريل 2008 إلى أبريل 2014

Supervise site organization with a multi -discipline work force and execute the work as per construction
program, method statements and contract requirements.
* Raise RFIS and monitor responses
* Plane for procurement, raise requisition, monitor &follow of procurement tracking.
* Liaise with management on allocations of resource.
* Mange all subcontract on your section impose all contract requirements with respect of quality scope,
program and budget maintain total written records and correspondence of all events liaising with
contract administration engineering procurement as necessary.
* Preparing all necessary daily, weekly and monthly reports as per the Performa’s and conducting
regular meeting with the internal department.
* Monitoring site progress Vs construction schedule, timely and accurate site reports and implementing
corrective steps for improvement.
* Supervise the activities of all project including determining schedules, schedules of values,
subcontract selection and submittal approval.
* Implementing system like QA, QC and cost control practices are in place.
Achievement:
- Construction of 12 Buildings from G+9 to G+15 & 500 Villas G+1.
* Located: Al Barari Dubai, UAE.
* Cost value: 1, 884, 000000 AED.

Site Engineer في Four Season Company
  • أبريل 2007 إلى مارس 2008

Achievement:
- Construction of Villas at 24, 25 floor and 26, 27 floor.
* Cost value: 21, 000, 000 USD.

الخلفية التعليمية

بكالوريوس, Architecture
  • في Helwan University
  • يونيو 2006

Fine Arts Faculty

Specialties & Skills

BUDGETING
PROGRESS
QUALITY
QUALITY CONTROL
CONSULTING
CONTRACT MANAGEMENT
COST CONTROL
CUSTOMER RELATIONS
DELIVERY
DIRECTING

اللغات

العربية
متمرّس
الانجليزية
متمرّس