April 2025 - till date
How United Services
Senior QA/QC Engineer
Qatar Shell Pearl GTL - The Main Contractor Works PGTL Master Plan (Phase 2), at Ras lafan Industrial City
• Quality assurance, Quality Control & Reporting
• HVAC, chilled water, Electrical, Fire Alarm, Low Current, Firefighting, Plumbing and Drainage system works for Main Canteen building and Plant Support building including Chilled water pump room, Fire pump room, Domestic water pump room, and Substations.
August 2024 - March 2025
How United Services
Senior QA/QC Engineer
Wathnan Racing - Wathnan Equestrian Development, Phase 1A (Infrastructure networks & Pump room Works).
• Quality assurance, Quality Control & Reporting
• HVAC, chilled water, Electrical, Fire Alarm, Low Current, Firefighting, Plumbing and Drainage system works for external works and MEP pump room including Chilled water pump room, Fire pump room, Domestic water pump room, Irrigation pump room and Substations.
August 2023 - July 2024
How United Services
Senior QA/QC Engineer
Tower 121 project 3rd, 4th and 24th floor fit out works.
• Quality assurance, Quality Control & Reporting
• HVAC, chilled water, Electrical, Fire Alarm, Low Current, Firefighting, Plumbing and Drainage system works for 3rd, 4th and 24th floor fit out works.
Responsible for Quality of whole Project incompliance with project specification, Standards and Quality procedures. Responsible for preparing Quality procedures like Project Quality plan, Inspection & Test plan, Method statement, Testing & commissioning procedures with the coordination of respective site engineer and Specialist/Sub-contractor. Responsible for assuring that the quality of the work meets or exceeds the project's contractual requirements. Perform onsite field observation of installed work. Review quality of all materials at site, ensure compliance to project specifications, approved Submittals, collaborate with department for all material procurement, and maintain quality of materials. Any non-conformances identified in materials or site activities will be formally issued to the construction team to prompt corrective actions in accordance with the project specifications and approved method statements. Leading the Site QA/QC Inspectors to complete the Inspections with Contractor & client representatives as well. Responsible for Conducting the MEP Equipment inspections with Engineers from main contractors and consultant Engineers. Responsible for giving feedback or quality status to the relevant departments/ suppliers. Assist with employees to ensure knowledge of all quality standards and ensure compliance to all quality manual and procedures and collaborate with contractors and suppliers to maintain quality of all systems. Analyze all products and non-conformance processes and evaluate all documents to ensure maintenance of optimal quality and prepare monthly reports to evaluate performance. Monitor an efficient system and record for all project activities and analyze all processes to ensure all work according to quality requirements. Manage all work methods, maintain knowledge on all quality assurance standards, monitor continuous application for all quality assurance processes, and recommend corrective actions for all processes. Assisting Project team to complete the ISO audit for Site operation and QA/QC documents. Responsible for ensuring the established QMS procedure continuously maintained for project work activities. Reports to the Project Manager & Quality Manager to overview and compliance of all MEP services.
- Company industry:
- Construction & Building
- Job role:
-
Construction and Building