Associate Design Engineer I
Fluor Daniel India Pvt Ltd
Total des années d'expérience :6 years, 8 Mois
1. Reviewed licensor P&ID, PFD and other drawings with reference to client requirements.
2. Prepared datasheets for heat exchangers, pumps, compressors, miscellaneous items, etc.
3. Performed pump hydraulics for verifying the calculation performed by licensor and to validate the datasheet issued by licenor.
4. Performed control valve hydraulics to furnish pressure drop across control valves in rated, normal and minimum flows.
5. Performed line sizing for pumping and non pumping loops and validated the sizes provided by licensor.
6. Prepared catalyst & chemical consumption summary, effluent summary, Battery limit interface table.
7. Prepared line list for propylene oxide unit.
8. Generated process inputs for flow instruments, Control valves, pressure regulators, level instruments.
1. Performed pump hydraulic calculations.
2. Performed PSV orifice, inlet and outlet line sizing calculations for PSV's part of vessels, PD pumps, Heat exchangers by identifying applicable relieving scenarios.
3. Prepared Utility consumption summary.
4. Prepared Performance Test Procedure.
5. Updated Equipment datasheets.
6. Supported piping department in the Flow Induced Vibration Analysis (FIV) to find the maximum velocity and viscosity in different flow lines.
7. Prepared PSV datasheets.
8. Prepared operating manual.
9. Performed control valve hydraulics to estimate the pressure drop across the control valve at different flowrates (Min/Nor/Max) and verified the results against the Licensor calculation.
10. Prepared P&ID markups for DCS screen development.
1. Carried out steady state simulation using ASPEN HYSYS and prepared the simulation report. Also familiarized dynamic simulation, depressurization & blowdown study using HYSYS during internal training sessions.
2. Carried out pump hydraulic calculations, line sizing, relief load calculations and prepared respective reports.
3. Made a solid knowledge foundation for the guidelines specified in international codes like API, NORSOK, NACE, SHELL DEP, etc.
4. Prepared Equipment datasheets, Equipment list, Line list, Tie in list, TQs, TBEs, etc.
5. Sized two phase liquid-vapor separator and prepared the datasheet.
6. Updated process design basis.
7. Prepared pre-commissioning, commissioning and start-up procedure.
8. Prepared, reviewed and corrected engineering drawings like BFD, PFD, UFD and P&ID.
9. Checked documents of other departments as part of inter-disciplinary check and provided inputs.
10. Reviewed HAZOP recommendations as part of FEED verification study.
11. Checked and reviewed vendor documents of various equipments and package items.
12. Participated in project design review meetings, 3D model review meetings and weekly client conferences
1. Removal Of COD From Edible Oil Content In Water By Fenton Oxidation Process. 2. Synthesis Of Silica Aerogel From Rice Hull Ash Under Ambient Drying Conditions