Planning Engineer
Immensa
Total des années d'expérience :14 years, 4 Mois
Led the development and implementation of the Data Capture Units (DCUs) process, reducing tool misplacement and errors at client sites.
Managed a central repository for DCU-related documents, leading to a decrease in information requests.
Streamlined SharePoint structures for client and supplier folders, minimizing time spent and reducing errors.
Initiated project management templates, enhancing project delivery efficiency.
Developed a unified material tracking system for DCU, enhancing inventory accuracy and efficiency.
Advanced digital transformation with a Microsoft Teams channel, increasing team collaboration and project management efficiency.
• Updated the company's Nomenclature in the accounting system, working independently and training new employees.
• Coordinated with R&D for new product launches, ensuring timely launches and full support.
• Created, adjusted, and monitored BOM components in the ERP system, preventing additional production costs.
• Managed revision changes, improving cross-departmental communication and reducing product modification errors.
• Participated in PLM system implementation and MES system integration requirements.
• Enhanced service specifications' accuracy, improving customer service effectiveness.
• As a liaison between US and Russian teams, I managed technical requirements and work protocols, which led to
the successful implementation of new work protocols and enhanced cross-cultural collaboration.
• Gained authority for signing off production drawings and documents in 2019, a role in which I ensured compliance
and quality of engineering outputs, reflecting my commitment to exceptional work quality.
• Led the OFCR and OFAR Manufacturing Engineering Moscow team within the Interiors Responsibility Center (IRC), where I oversaw the creation of Assembly Detail Process Plans (ADPP) in CAPP. My work involved meticulous maintenance of a local database for current requirements and changes, and the revision of BOMs using PDM. My focus on detail and accuracy in developing precise assembly and installation plans significantly enhanced
production efficiency and accuracy.
• As a leader in task management and mentoring, I trained and mentored 4 engineers, improving team
performance. My ability to independently verify and close tasks demonstrated my high competence and
leadership skills within the team.
International Experience: Business Trips to the United States
• Participated in six business trips to Boeing's Everett facility in Washington, USA, playing a specialized role in Aerospace Manufacturing Engineering. My activities included acting as a liaison for the 777X IRC Crew Rest project, where I took part in crucial team meetings and discussions.
• This role entailed overseeing MBDC team assignments, handling technical requirements, scheduling tasks, and driving process improvements, which enhanced my understanding of the 777X program's workflow and significantly improved my cross-functional collaboration and project management skills.
• Witnessed Crew Rest manufacturing firsthand, providing me with the opportunity to clarify ME requirements and procedures for implementation back in Moscow.
• I was actively involved in customer introduction activities for the 777X program, contributing to the development of Itemized Work Statements and Commitment Development Schedules. This hands-on experience provided me with invaluable insights, further developing my professional skills in an international setting.
Collaborated within various 787 Final Assembly & Delivery sub-teams, encompassing Structures, Systems, and Interiors, such as Electrical Sub-systems, Wing, Fuels, Hydraulic, AMODs, Emergency Equipment, Partitions,
Galleys, and Lavatories. Gained extensive cross-functional experience, contributing to diverse aspects of the aircraft assembly process and enhancing team versatility.
• Developed comprehensive installation plans using DELMIA, CATIA V5, ENOVIA, and EPLAN, focusing on BOM stages, GRD, and shop work instructions. Enhanced production accuracy and efficiency, reducing engineering errors and facilitating smoother production lines.
• Led the AMOD and Emergency Equipment Installation teams, creating installation plans and revising BOMs. Implemented innovative verification processes for BOMs, significantly reducing material errors and saving company resources.
• Conducted detailed engineering research for aerospace component manufacturing, analyzing module histories and standard compliance. Streamlined the manufacturing process, leading to your recognition as a checker with authority over plan approvals.
Monitored and authorized credit applications, ensuring accuracy and compliance with the bank's policies. Promoted to manage complex credit refinancing applications due to exceptional performance.
Provided technical expertise in upgrading bank computer systems and collected financial data for strategic planning. Enhanced departmental efficiency by coordinating information flow among a team of 14 specialists.
Maintained and secured a sensitive client database, adhering to strict banking standards. Built expertise in testing methodologies and mastered team leadership and mentoring skills.
Specialized in technology analysis and selection for product manufacturing, focusing on process control and manufacturing technology for injection molding. Engaged in the production process of flexible molds and aesthetic analysis in product design. Developed skills in art design software for advertising and promotional materials. Gained knowledge in experimental techniques, scientific research fundamentals, and modern methods of art processing of metals. Dissertation: "Development, Design & Production Technology of Jewelry Sets for Exclusive and Mass Production Processes".