Planning Engineer
Yashaswi Engineering Consultant Pvt. Ltd.
مجموع سنوات الخبرة :12 years, 2 أشهر
• Project planning, baseline scheduling, monitoring, tracking, and reporting activities. Analyses and reports project economics including costs, operational budgets, staffing requirements, resources, and risk
• Prepare the project-wide master program reflecting the project phasing and packaging strategy and including engineering procurement construction handing over the project
• Track the delivery of long-lead materials into stage-wise requirements at the site, highlighting the priority of materials to the Project Manager, as per the agreed schedule
• Establish the delay analysis by capturing the delay analysis, notification and EOT claim accurately in line with the project requirements
• Prepare the Look-ahead schedules, KPI tracker, and progress updates based on the QC approval
• Setup presentation of the Progress updates, including Schematic layout illustration
• Collate and analyse reports from the site team to ensure that delays, stoppages, constraints, and deviations are being recorded in line with the project requirements
• Monitor and analyze Earned Value and associated Key Performance Indicator
• Project planning, baseline scheduling, monitoring, tracking, and reporting activities. Analyses and reports project economics including costs, operational budgets, staffing requirements, resources, and risk
• Prepare the project-wide master program reflecting the project phasing and packaging strategy and including engineering procurement construction handing over the project
• Track the delivery of long-lead materials into stage-wise requirements at the site, highlighting the priority of materials to the Project Manager, as per the agreed schedule
• Establish the delay analysis by capturing the delay analysis, notification and EOT claim accurately in line with the project requirements
• Prepare the Look-ahead schedules, KPI tracker, and the progress updates based on the QC approval
• Setup presentation of the Progress updates, including Schematic layout illustration
• Collate and analyse reports from the site team to ensure that delays, stoppages, constraints, and deviations are being recorded in line with the project requirements
• Monitor and analyse Earned Value and associated Key Performance Indicator
• Track and monitor major equipment
• Participate in project meetings and discussions with the clients as required
• Assists in preparing work program, cash flow, manpower histogram, S- Curve
• Manpower and equipment deployment chart
• Develop variance analysis and responsibility float consumption
• Reflect change order scope on schedule and perform variance analysis
• Link and modify linkages of proper sequence in planning software
• Track and monitor project manpower levels to include direct, indirect, support, and idle
• Assign cost components and cost types to create graphs to illustrate actual performance and project status
• Package the project into the scope of work
• Develop levels1 to 7 of the schedules
• Prepare weekly/monthly look-ahead plan, progress schedule, recovery plan, and accelerate plans
• Preparing the master program reflecting the project phasing and packaging strategy and including procurement, construction, commissioning, and handing over
• Update the program (baseline vs. updates), including cost and resource loading
• Demonstrable track record in the delivery of large multidisciplinary projects.
• Monitor construction progress and analyze earned value
• Prepare weekly and monthly reports and report to the project control manager any deficiency or non-compliance
• Attend weekly progress meetings and monthly meetings and participate in preparing the agenda
• Review and assess time aspects for extension of time claims
• Report weekly/monthly progress along with delays/slippages and provide resolution
• Monitor the status of all purchases and invoicing and delivery up to the closure of the project
• Prepared a detailed program of works in accordance with contract key dates
• Developed work breakdown structure and defined work packages and coding of the scheduled activity
• Identified and managed all interface, milestones, and major activities, the relationship between activities, and created budget estimates
• Coordinated in preparation of drawing submission schedule and followed up the delivery material as per the schedule
• Collected the soil samples from the project intended site using bores and test pits
• Conducted laboratory testing performed as per the relevant part of IS 2720
• Performed geotechnical analysis and study to assess construction sites based on substructure conditions revealed from field investigation
• Worked as a Site Engineer for a service provider of water and sewage projects- UGD construction works, municipal
• Managed supervision of civil works which involve excavation of trenches for laying water pipes, construction of break pressure tanks
B.E. (Civil Engineering) Sir MVIT College (Bangalore), VTU (Belgaum University), Karnataka
A grade
80 %