Senior Projects Manager
Cenomi
مجموع سنوات الخبرة :8 years, 4 أشهر
• Leading daily client engagements and strategy discussions.
• Developing and implementing project schedules, milestone maps and deliverable requirements to ensure that projects timelines are met.
• Working in partnership with teams to ensure efficient and effective delivery of initiatives and outcomes
• Reviewing design drawings to guarantee that the quality is up to the standard and that there is harmony with the overall space.
• Overlooking construction project activities to discuss and resolve issues such as work procedures and construction methods.
• Regularly removed roadblocks to ensure projects were delivered on time.
• Managed design developments and the supervision of numerous projects across the region, including MOC Offices in JAX, Riyadh and Red Sea Film Festival 2022 that took place in Albalad, Jeddah.
• Spearheaded several design competitions across the kingdom.
• Took projects from original concept through final implementation. Interface with all areas affected by the project including client and end users.
• Prepared tenders for all projects.
• Set up department structure for the organisation including designating employee roles and responsibilities and creating an effective approach in order to facilitate a more coherent way of working.
• Led multi-disciplinary teams by fostering positive environment and boosting employees’ confidence.
• Created a new communication system and folder structure that increased efficiency by giving designers more time to spend on design.
Managed several facilities in King Abdulaziz International Airport Development Project with the following main responsibilities:
• Understood the objectives and requirements of the stakeholders in order to implement them alongside the client’s goals.
• Monitored site progress by visiting the site on a daily basis to verify project schedules and critical milestones.
• Coordinated between other trades, contractor and sub-contractors to prevent technical conflict in the future.
• Reviewed RIWs (Request Inspection for Work) and as-built transmittals in accordance with design and technical documents to ensure the specified outcome of works.
• Issued punch lists to ensure that the quality of works is achieved as per project specification.
• Led to create a new system division for all as-built transmittals in collaboration with the IT department that was implemented across more than 45 countries.
Managing all facilities in King Fahd International Airport Airbase Project with the following main responsibilities:
• Inspected mock-ups for all elements in order for all Architects to follow the same standards and quality.
• Resolved all major concerns from the client, stakeholders and contractor.
• Crafted policies and procedures for all Architects to follow.
• Integrated process improvements to increase overall workflow.
• Scheduled and chaired quality review meetings to review effectiveness of performance, mitigating risk and improving throughput.
• Supervised for Al Slam Palace Marina project that consisted of nineteen new buildings and the renovation of three which were both residential and commercial areas. Main responsibilities were: finishing works and handover to the stakeholders.
• Spearheaded architectural activities for Al Slam Palace Complex that consists of constructing five new buildings and renovating five existing buildings. This included the creation of a concept design for all the buildings’ interior and exterior, tender preparation, supervision of demolition and infrastructure works.
• Designed for Ubhur Hospital project which included conducting a site analysis study and concept design for the entire exterior layout of the buildings, hardscape and landscape.
• Analysed BOQ for Sewage Treatment Plant in Jubail.
• Contributed to waterproofing rectification of main pump room for Jeddah Fountain.
• Designed a private residential house in coordination with regulation requirements.
• Monitored Shatti Duplexes project which were four duplexes near the sea. This involved inspecting MEP works, ceiling and lighting design, full interior furniture layout and smart system selection.
• Supervised Fraser Suites project that consisted of a five-star hotel and a mixed-use building including the review for the dewatering system and shoring setup as a consultant Site Engineer.
• Initiated and launched a “Branding and Marketing department” and performed related tasks to establish the division such as hiring and managing employees.
• Developed a complete facelift of the company’s corporate identity and launched its official website to reflect the offerings in order to attract more customers.
Renovated the lieutenant’s private residence in Al Slam palace by developing a plan for the interior renovation alongside a lead Interior Architect.
Developed several design alternatives for airports in different cities across Saudi Arabia.
Rotated between departments including architecture, interior design, illustration, 3D digital modelling and physical model making whereby a variety of skill sets were obtained through working on design concept development, technical works, and site visits.
Supported lead architect in designing and revitalising an existing residential property.
Supported designers to furnish and decorate a private residence.
Foundation