مها مصطفي البربري البربري, Electrical Engineer

مها مصطفي البربري البربري

Electrical Engineer

Contractors Company (CCC)

Location
Oman - Muscat
Experience
11 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :11 years, 6 Months

Electrical Engineer at Contractors Company (CCC)
  • Egypt
  • My current job since February 2017
Electrical Engineer at Contractors Company (CCC)
  • Egypt
  • My current job since February 2017
Electrical Engineer at Contractors Company (CCC)
  • Egypt
  • My current job since February 2017
Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • November 2014 to April 2014
Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • November 2014 to April 2014
Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • November 2014 to April 2014
Commissioning Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2010 to August 2011

Key Projects:
Project: Ras Laffan Port Expansion Project (RLPEP)
Client: Qatar Petroleum (QP)
Consultant: CCC/EPSO
Project Value: 2.2 Billion USD.

Highlights:
• Nominated as punch list focal point Engineer for the Electrical Commissioning Department.

Responsibilities:

• Testing and pre-commissioning of Electrical Systems (lighting &small power distribution boards, grounding & lightning system, Transformers, LV & HV Switch Gear, RMU, UPS & Batteries, F&G system) according to inspection test plans specified to meet the full compliance of the existing Electrical Power systems in the project prior to commissioning.
• Organize and follow-up commissioning activities in the project with various system vendors and Client.
• Analyze, investigate the areas of concern and monitor the course of corrective action upon the delay in progress.
• Plan stepwise commissioning details according to the overall procedure and instruct commissioning crews and subcontractor for the necessary action.
• Ensure that the commissioning obligations of the project are carried out in accordance with the terms of contract, quality and schedule in conformance with good practice of commissioning standards.
• Reviewing all Electrical Engineering drawings and vendor documents to confirm and clarify the system’s parameter, specifications, ratings, and tagging etc. for all earthing, lightning, lighting, electrical ring grid, RMUs-if applicable, transformers, switch gears, distribution panels, UPS and batteries, switch boards...etc.
• Manage the documentation for the pre-commissioning & commissioning activities such as taking over certificates, as built drawings, manufacturer manuals and instructions, snagging lists, test procedures, risk assessment and method statement, end of commissioning reports.

Commissioning Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2010 to August 2011

Key Projects:
Project: Ras Laffan Port Expansion Project (RLPEP)
Client: Qatar Petroleum (QP)
Consultant: CCC/EPSO
Project Value: 2.2 Billion USD.

Highlights:
• Nominated as punch list focal point Engineer for the Electrical Commissioning Department.

Responsibilities:

• Testing and pre-commissioning of Electrical Systems (lighting &small power distribution boards, grounding & lightning system, Transformers, LV & HV Switch Gear, RMU, UPS & Batteries, F&G system) according to inspection test plans specified to meet the full compliance of the existing Electrical Power systems in the project prior to commissioning.
• Organize and follow-up commissioning activities in the project with various system vendors and Client.
• Analyze, investigate the areas of concern and monitor the course of corrective action upon the delay in progress.
• Plan stepwise commissioning details according to the overall procedure and instruct commissioning crews and subcontractor for the necessary action.
• Ensure that the commissioning obligations of the project are carried out in accordance with the terms of contract, quality and schedule in conformance with good practice of commissioning standards.
• Reviewing all Electrical Engineering drawings and vendor documents to confirm and clarify the system’s parameter, specifications, ratings, and tagging etc. for all earthing, lightning, lighting, electrical ring grid, RMUs-if applicable, transformers, switch gears, distribution panels, UPS and batteries, switch boards...etc.
• Manage the documentation for the pre-commissioning & commissioning activities such as taking over certificates, as built drawings, manufacturer manuals and instructions, snagging lists, test procedures, risk assessment and method statement, end of commissioning reports.

Commissioning Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2010 to August 2011

Key Projects:
Project: Ras Laffan Port Expansion Project (RLPEP)
Client: Qatar Petroleum (QP)
Consultant: CCC/EPSO
Project Value: 2.2 Billion USD.

Highlights:
• Nominated as punch list focal point Engineer for the Electrical Commissioning Department.

Responsibilities:

• Testing and pre-commissioning of Electrical Systems (lighting &small power distribution boards, grounding & lightning system, Transformers, LV & HV Switch Gear, RMU, UPS & Batteries, F&G system) according to inspection test plans specified to meet the full compliance of the existing Electrical Power systems in the project prior to commissioning.
• Organize and follow-up commissioning activities in the project with various system vendors and Client.
• Analyze, investigate the areas of concern and monitor the course of corrective action upon the delay in progress.
• Plan stepwise commissioning details according to the overall procedure and instruct commissioning crews and subcontractor for the necessary action.
• Ensure that the commissioning obligations of the project are carried out in accordance with the terms of contract, quality and schedule in conformance with good practice of commissioning standards.
• Reviewing all Electrical Engineering drawings and vendor documents to confirm and clarify the system’s parameter, specifications, ratings, and tagging etc. for all earthing, lightning, lighting, electrical ring grid, RMUs-if applicable, transformers, switch gears, distribution panels, UPS and batteries, switch boards...etc.
• Manage the documentation for the pre-commissioning & commissioning activities such as taking over certificates, as built drawings, manufacturer manuals and instructions, snagging lists, test procedures, risk assessment and method statement, end of commissioning reports.

Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2011 to February 2011

Key Projects:
Project: Dukhan Highway Project (DHP/BHP)
Client: Ashghal
Project Management

Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2011 to February 2011

Key Projects:
Project: Dukhan Highway Project (DHP/BHP)
Client: Ashghal
Project Management

Electrical Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • August 2011 to February 2011

Key Projects:
Project: Dukhan Highway Project (DHP/BHP)
Client: Ashghal
Project Management

Site Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • October 2008 to August 2010

Nominated as Field Interface coordinator with Ras Laffan owners and Operations (QP, Rasgas, RLIC, CSF)for all the permits work, site visits, presentation of our scope of work in the common working areas.
• Received an award and letter of appreciation in recognition of applying high level safety procedures of an equally hazardous free workspace.

Key Projects:
Project: Common Cooling Sea Water Cat2 (CCW2)
Client: Qatar Petroleum (QP

Site Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • October 2008 to August 2010

Nominated as Field Interface coordinator with Ras Laffan owners and Operations (QP, Rasgas, RLIC, CSF)for all the permits work, site visits, presentation of our scope of work in the common working areas.
• Received an award and letter of appreciation in recognition of applying high level safety procedures of an equally hazardous free workspace.

Key Projects:
Project: Common Cooling Sea Water Cat2 (CCW2)
Client: Qatar Petroleum (QP

Site Engineer at Consolidated Contractors Company (CCC)
  • Qatar
  • October 2008 to August 2010

Nominated as Field Interface coordinator with Ras Laffan owners and Operations (QP, Rasgas, RLIC, CSF)for all the permits work, site visits, presentation of our scope of work in the common working areas.
• Received an award and letter of appreciation in recognition of applying high level safety procedures of an equally hazardous free workspace.

Key Projects:
Project: Common Cooling Sea Water Cat2 (CCW2)
Client: Qatar Petroleum (QP

Site Engineer at Petroje
  • Egypt
  • April 2008 to September 2008

Key Projects:
Project: PDH/PP Project
Client: UHDE ThyssenKrupp / EPPC
Project Value: 100 Million USD.


Responsibilities:

• All electrical and Instrument installation supervision with sub-contractors.
• Quantity surveying based on engineering drawings and material issuance in liaison with the client.
• Actively associated with preparation of invoices as per work done and budgeting.
• Applying all aspects of earthing and lightning works of the project.
• Temporary project site facilities, PDH camp work related to supply of electrical power.

Site Engineer at Petroje
  • Egypt
  • April 2008 to September 2008

Key Projects:
Project: PDH/PP Project
Client: UHDE ThyssenKrupp / EPPC
Project Value: 100 Million USD.


Responsibilities:

• All electrical and Instrument installation supervision with sub-contractors.
• Quantity surveying based on engineering drawings and material issuance in liaison with the client.
• Actively associated with preparation of invoices as per work done and budgeting.
• Applying all aspects of earthing and lightning works of the project.
• Temporary project site facilities, PDH camp work related to supply of electrical power.

Site Engineer at Petroje
  • Egypt
  • April 2008 to September 2008

Key Projects:
Project: PDH/PP Project
Client: UHDE ThyssenKrupp / EPPC
Project Value: 100 Million USD.


Responsibilities:

• All electrical and Instrument installation supervision with sub-contractors.
• Quantity surveying based on engineering drawings and material issuance in liaison with the client.
• Actively associated with preparation of invoices as per work done and budgeting.
• Applying all aspects of earthing and lightning works of the project.
• Temporary project site facilities, PDH camp work related to supply of electrical power.

Site Engineer at Petroje
  • Egypt
  • June 2007 to April 2008

Client: Holding Company for Silos and Storage (EHCSS

Site Engineer at Petroje
  • Egypt
  • June 2007 to April 2008

Client: Holding Company for Silos and Storage (EHCSS

Site Engineer at Petroje
  • Egypt
  • June 2007 to April 2008

Client: Holding Company for Silos and Storage (EHCSS

at Majid Al Futtaim Properties (MAF)
  • United Arab Emirates
  • to
Consultant at Archimid- RTKL-WSP -Shaker Consultancy Group
  • Egypt
  • to

Generally responsible for implementations and monitoring of all electrical related works at site.
• Installation of Low Voltage and Medium Voltage Networks including Step Up & Down Transformers, Switch Gears, RMU’s, Generators, indoor and outdoor Bus Way, MV/LV Cables etc.
• Monitoring and controlling project execution with respect to time, cost and quality.
• Review & submit weekly progress valuation of MEP work, Daily work report, inspection requests and all applicable monitoring reports on regular basis
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local or international standards.
• Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
• Participate in client Progress meetings & Interface with other disciplines within the MEP team for coordination.
• Assigns work tasks/ activities to Site Engineers, foremen & subcontractors.
• Liaising with QC Engineers & Owner representative regarding work progression and hold point inspections.

Consultant at Atkins - Parsons
  • to

Dukhan - Qatar.
Project Value: 2.5 Billion USD.

Highlights:

• Nominated as an Focal Point engineer for the coordination/Meetings/Inspections for all the MEP related works including liaise with all the end-users

Responsibilities:

• Site surveys, preparation of shop drawings, finalization of Subcontractors and Suppliers for all MEP related items by evaluating in both technical and commercial aspects
• Interface & Coordination works between Kahramaa’s various departments.
• Preparation and installation of temporary road lighting including design.
• Ensuring the execution of work activities within the allocated time frame.
• Assigns areas of responsibilities to Site Engineers.
• Preparation of Material take-off and work procedure, MAR, substation technical packages, TQ’s, QCP-ITP for client approval etc.
• Supervision of Pumping Stations, Tunnel & Utility Buildings complete MEP related works
• Supervision for installation of kahramaa substations including Dry & Oil Transformers, Switch Gears, Ring Main units (RMU’s), Feeder Pillar’s, F&G system etc.
• Installation of 11 KV cables, pilot cables, street lighting poles, high mast columns, and street lighting feeder Pillars, Earthing networks etc.
• Preparation of project closeout documents like, O&M manuals, As built drawings, Warranty certificates, etc.
• Demolition & diversion of existing high voltage over headlines, cables &high masts etc.

Project at KEO
  • United Arab Emirates
  • to

LMH (Lusail Multi-purpose Hall)
Client: Qatar Olympic Committee (QOC)
Project Management: ASTAD
Consultant:

Consultant at Technip
  • Qatar
  • to

Project Value: 700 Million USD.

Responsibilities:

• Supervision during installation of various Electrical and Instrumentation equipment’s like MV Package substation, MCC switchboards, DCS, F&G system, MOV’s, UPS, HVAC Controls, Lighting, Field Instrumentation, Ultrasonic Flow meters, Analyzers, Fiber optic network etc.
• Site survey for existing facilities and clashes identification and preparing reports for engineering consultant (Technip).
• Pre-Commissioning and testing activities and Commissioning follow-up with various vendors on site.
• Overall responsible for site planning, material availability, manpower & equipment control.
• Monitoring project quality plan and ensuring operational activities are in line with the safety objectives. Communicating safety polices standards, and procedures to the operational staff and advising them on practical solutions to minimize risks.
• Plan and execute works according to project schedules; prioritizing activities; forecasting, evaluating, monitoring and submitting weekly progress reports of the same to the senior management.
• Material take-off, sourcing, preparation of comparison sheets and placing order along with procurement department.
• Preparation of various project documentation like Work procedures, MAR, TQ’s, QCP-ITP, updating drawings for client approval etc.
• Punch lists clearance, as-built documentation and final handing over to client.
• All electrical power works for mobilization of labor camp and site facilities including design for fire alarm system and its interface.

Consultant at ABB
  • United Arab Emirates
  • to

Cimbria (Denmark)
Project Value: 11 Million USD.

Responsibilities:

• Installation of Medium and low Voltage Switch gear (

at Majid Al Futtaim Properties (MAF)
  • United Arab Emirates
  • to
Consultant at Archimid- RTKL-WSP -Shaker Consultancy Group
  • Egypt
  • to

Generally responsible for implementations and monitoring of all electrical related works at site.
• Installation of Low Voltage and Medium Voltage Networks including Step Up & Down Transformers, Switch Gears, RMU’s, Generators, indoor and outdoor Bus Way, MV/LV Cables etc.
• Monitoring and controlling project execution with respect to time, cost and quality.
• Review & submit weekly progress valuation of MEP work, Daily work report, inspection requests and all applicable monitoring reports on regular basis
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local or international standards.
• Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
• Participate in client Progress meetings & Interface with other disciplines within the MEP team for coordination.
• Assigns work tasks/ activities to Site Engineers, foremen & subcontractors.
• Liaising with QC Engineers & Owner representative regarding work progression and hold point inspections.

Consultant at Atkins - Parsons
  • to

Dukhan - Qatar.
Project Value: 2.5 Billion USD.

Highlights:

• Nominated as an Focal Point engineer for the coordination/Meetings/Inspections for all the MEP related works including liaise with all the end-users

Responsibilities:

• Site surveys, preparation of shop drawings, finalization of Subcontractors and Suppliers for all MEP related items by evaluating in both technical and commercial aspects
• Interface & Coordination works between Kahramaa’s various departments.
• Preparation and installation of temporary road lighting including design.
• Ensuring the execution of work activities within the allocated time frame.
• Assigns areas of responsibilities to Site Engineers.
• Preparation of Material take-off and work procedure, MAR, substation technical packages, TQ’s, QCP-ITP for client approval etc.
• Supervision of Pumping Stations, Tunnel & Utility Buildings complete MEP related works
• Supervision for installation of kahramaa substations including Dry & Oil Transformers, Switch Gears, Ring Main units (RMU’s), Feeder Pillar’s, F&G system etc.
• Installation of 11 KV cables, pilot cables, street lighting poles, high mast columns, and street lighting feeder Pillars, Earthing networks etc.
• Preparation of project closeout documents like, O&M manuals, As built drawings, Warranty certificates, etc.
• Demolition & diversion of existing high voltage over headlines, cables &high masts etc.

Project at KEO
  • United Arab Emirates
  • to

LMH (Lusail Multi-purpose Hall)
Client: Qatar Olympic Committee (QOC)
Project Management: ASTAD
Consultant:

Consultant at Technip
  • Qatar
  • to

Project Value: 700 Million USD.

Responsibilities:

• Supervision during installation of various Electrical and Instrumentation equipment’s like MV Package substation, MCC switchboards, DCS, F&G system, MOV’s, UPS, HVAC Controls, Lighting, Field Instrumentation, Ultrasonic Flow meters, Analyzers, Fiber optic network etc.
• Site survey for existing facilities and clashes identification and preparing reports for engineering consultant (Technip).
• Pre-Commissioning and testing activities and Commissioning follow-up with various vendors on site.
• Overall responsible for site planning, material availability, manpower & equipment control.
• Monitoring project quality plan and ensuring operational activities are in line with the safety objectives. Communicating safety polices standards, and procedures to the operational staff and advising them on practical solutions to minimize risks.
• Plan and execute works according to project schedules; prioritizing activities; forecasting, evaluating, monitoring and submitting weekly progress reports of the same to the senior management.
• Material take-off, sourcing, preparation of comparison sheets and placing order along with procurement department.
• Preparation of various project documentation like Work procedures, MAR, TQ’s, QCP-ITP, updating drawings for client approval etc.
• Punch lists clearance, as-built documentation and final handing over to client.
• All electrical power works for mobilization of labor camp and site facilities including design for fire alarm system and its interface.

Consultant at ABB
  • United Arab Emirates
  • to

Cimbria (Denmark)
Project Value: 11 Million USD.

Responsibilities:

• Installation of Medium and low Voltage Switch gear (

at Majid Al Futtaim Properties (MAF)
  • United Arab Emirates
  • to
Consultant at Archimid- RTKL-WSP -Shaker Consultancy Group
  • Egypt
  • to

Generally responsible for implementations and monitoring of all electrical related works at site.
• Installation of Low Voltage and Medium Voltage Networks including Step Up & Down Transformers, Switch Gears, RMU’s, Generators, indoor and outdoor Bus Way, MV/LV Cables etc.
• Monitoring and controlling project execution with respect to time, cost and quality.
• Review & submit weekly progress valuation of MEP work, Daily work report, inspection requests and all applicable monitoring reports on regular basis
• Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior to execution.
• Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local or international standards.
• Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.
• Participate in client Progress meetings & Interface with other disciplines within the MEP team for coordination.
• Assigns work tasks/ activities to Site Engineers, foremen & subcontractors.
• Liaising with QC Engineers & Owner representative regarding work progression and hold point inspections.

Consultant at Atkins - Parsons
  • to

Dukhan - Qatar.
Project Value: 2.5 Billion USD.

Highlights:

• Nominated as an Focal Point engineer for the coordination/Meetings/Inspections for all the MEP related works including liaise with all the end-users

Responsibilities:

• Site surveys, preparation of shop drawings, finalization of Subcontractors and Suppliers for all MEP related items by evaluating in both technical and commercial aspects
• Interface & Coordination works between Kahramaa’s various departments.
• Preparation and installation of temporary road lighting including design.
• Ensuring the execution of work activities within the allocated time frame.
• Assigns areas of responsibilities to Site Engineers.
• Preparation of Material take-off and work procedure, MAR, substation technical packages, TQ’s, QCP-ITP for client approval etc.
• Supervision of Pumping Stations, Tunnel & Utility Buildings complete MEP related works
• Supervision for installation of kahramaa substations including Dry & Oil Transformers, Switch Gears, Ring Main units (RMU’s), Feeder Pillar’s, F&G system etc.
• Installation of 11 KV cables, pilot cables, street lighting poles, high mast columns, and street lighting feeder Pillars, Earthing networks etc.
• Preparation of project closeout documents like, O&M manuals, As built drawings, Warranty certificates, etc.
• Demolition & diversion of existing high voltage over headlines, cables &high masts etc.

Project at KEO
  • United Arab Emirates
  • to

LMH (Lusail Multi-purpose Hall)
Client: Qatar Olympic Committee (QOC)
Project Management: ASTAD
Consultant:

Consultant at Technip
  • Qatar
  • to

Project Value: 700 Million USD.

Responsibilities:

• Supervision during installation of various Electrical and Instrumentation equipment’s like MV Package substation, MCC switchboards, DCS, F&G system, MOV’s, UPS, HVAC Controls, Lighting, Field Instrumentation, Ultrasonic Flow meters, Analyzers, Fiber optic network etc.
• Site survey for existing facilities and clashes identification and preparing reports for engineering consultant (Technip).
• Pre-Commissioning and testing activities and Commissioning follow-up with various vendors on site.
• Overall responsible for site planning, material availability, manpower & equipment control.
• Monitoring project quality plan and ensuring operational activities are in line with the safety objectives. Communicating safety polices standards, and procedures to the operational staff and advising them on practical solutions to minimize risks.
• Plan and execute works according to project schedules; prioritizing activities; forecasting, evaluating, monitoring and submitting weekly progress reports of the same to the senior management.
• Material take-off, sourcing, preparation of comparison sheets and placing order along with procurement department.
• Preparation of various project documentation like Work procedures, MAR, TQ’s, QCP-ITP, updating drawings for client approval etc.
• Punch lists clearance, as-built documentation and final handing over to client.
• All electrical power works for mobilization of labor camp and site facilities including design for fire alarm system and its interface.

Consultant at ABB
  • United Arab Emirates
  • to

Cimbria (Denmark)
Project Value: 11 Million USD.

Responsibilities:

• Installation of Medium and low Voltage Switch gear (

Specialties & Skills

Learning Disabilities
Autism Spectrum Disorders
Special Situations
LIGHTING
MICROSOFT WORKS
NETWORKING
CONSULTING
CUSTOMER RELATIONS
DOCUMENTATION
EXECUTIVE MANAGEMENT
FORECASTING
LIGHTING
MICROSOFT WORKS
NETWORKING
CONSULTING
CUSTOMER RELATIONS
DOCUMENTATION
EXECUTIVE MANAGEMENT
FORECASTING
LIGHTING
MICROSOFT WORKS
NETWORKING