Qasim Al Naser, Field Service Engineer | Surface Pressure Control (Wellhead)

Qasim Al Naser

Field Service Engineer | Surface Pressure Control (Wellhead)

Baker Hughes - Saudi Arabia

Location
Saudi Arabia - Eastern Province
Education
Bachelor's degree, Electrical and Electronics Engineering
Experience
6 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :6 years, 2 Months

Field Service Engineer | Surface Pressure Control (Wellhead) at Baker Hughes - Saudi Arabia
  • Saudi Arabia - Dammam
  • My current job since December 2019
Graduate Management Program | One Year Rotational Program at General Electric GE Oil & Gas
  • Saudi Arabia - Dammam
  • December 2018 to December 2019
Solar PV Installer at Grid Alternatives
  • United States - Colorado - Denver
  • October 2017 to February 2018

● Cooperated in Installing more than 600 solar panels on a farm located East Denver Intl Airport. ● Installed solar panels systems for low income residential homes. ● Tested each panel on the site before installation.

Electrical Engineering Department Assistant at University of Colorado Denver
  • United States - Colorado - Denver
  • September 2017 to February 2018

● Assisted Instructors with (Ongoing) Project/Research.” Active X-Ray Dosimetry System”
● Assisted Instructors in class/laboratory preparation.
● Maintained of Five Electrical Engineering laboratories.

Project Engineer ( Internship ) at Saudi Aramco
  • Saudi Arabia - Al Husayniyah
  • July 2016 to September 2016

● Reviewed contracts and understood the associated scope of work (SOW), terms and conditions and related standards. ● Reviewed Electrical Design for Primary Roads & Major Utilities Project and followed up with Submittal letters/ RFI. ● Attended meetings with contractors & suppliers and prepared reports about work progress. ● Reviewed Procurement’s plan and kept track of delivery schedule. ● Followed up with contractors to address pending design/construction issues and worked on solving them.
● Followed up with manpower to address MV 13.8 kv cables issues and worked on splicing points.
● Followed up with construction Foundation in the pre engineering building (PEB) to install the diesel tank, generator tank etc.
● Followed up with installing the MV cables thru Duct Bank & Direct Burial and the Ring Main Unit (RMU) Foundation.
● Followed up with installing the Foundations for the Transformers, and the excavations for the Switchgear in Grid Station.
● Reviewed Electrical Design drawing for Transmission Lines, Substations and Bulk Supply Point (BSP) Station.

Education

Bachelor's degree, Electrical and Electronics Engineering
  • at University of Colorado Denver
  • May 2017

Languages

Arabic
Native Speaker
English
Expert